Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LAccepted-AOC OTTAKANDATHIL HOUSE PARAVOOTHARA CHENDAMANGALAM P O PIN 683512 | CHENDAMANGALAM | ERNAKULAM | KERALA | 683512 | ₹11.6 L | L1 | Accepted-AOC Lowest |
| 2 | Rejected-Technical | - | - | Rejected-Technical Accepted the lowest quoted bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical Accepted the lowest quoted bidder |
| Sl No | Description | Qty | Unit | BIJU.O.P L1 | SWARAJ EQUIPMENT PVT LTD L2 | CHAKKANAT ENGINEERING SOLUTIONS L3 |
|---|---|---|---|---|---|---|
| 1.00For the 1st Year | ||||||
| 1.01 | Running and maintaining STP as per PCB norms including attending blocks in man hole and sewage line connected to STP,all its constructions including operating control panel board from 6 am to 6 am (24 hours) by engaging qualified operator ,sewer man, qualified electrician for maintaining and repairing the pumps and motors as when required for proper functioning and as directed by the engineer in charge including disposal of dried sludge from STP ( penalty shall be deducted at quoted rate to be computed on per day basis for non attending. The rate is inclusive of both civil and electrical nature and materials required) Special Conditions:
• Any damages to the existing structure during the course of execution of the work shall be got repaired to its original position by contractor at his risk and cost.
• Work shall be carried out as per the K. P.C.B specification.
• The payment will be made by cheque only after satisfactory completion of the work.
• Rate is inclusive of all tax and nothing shall be paid extra.
• Necessary safety and insurance of the labour employed shall be arranged by the contractor as per rules.
• All T & P shall be arranged by the contractor.
• Material for day to day maintenance shall be met by the contractor.
• Dismantled materials if any are to be returned to the AE ,CUSAT.
• Running of STP should be as per directions in PCB clearance issued No PCB/EKM/DO-1/OC-107/13 dt.02.07.2013 and obtaining sanction if any also included in the scope of this work from PCB or any other Govt.Agencies/Local bodies
• Tax will be deducted from the bill. | 12 | Month | - | - | - |
| 2.00For the 2nd Year | ||||||
| 2.01 | Running and maintaining STP as per PCB norms including attending blocks in man hole and sewage line connected to STP,all its constructions including operating control panel board from 6 am to 6 am (24 hours) by engaging qualified operator ,sewer man, qualified electrician for maintaining and repairing the pumps and motors as when required for proper functioning and as directed by the engineer in charge including disposal of dried sludge from STP ( penalty shall be deducted at quoted rate to be computed on per day basis for non attending. The rate is inclusive of both civil and electrical nature and materials required) Special Conditions:
• Any damages to the existing structure during the course of execution of the work shall be got repaired to its original position by contractor at his risk and cost.
• Work shall be carried out as per the K. P.C.B specification.
• The payment will be made by cheque only after satisfactory completion of the work.
• Rate is inclusive of all tax and nothing shall be paid extra.
• Necessary safety and insurance of the labour employed shall be arranged by the contractor as per rules.
• All T & P shall be arranged by the contractor.
• Material for day to day maintenance shall be met by the contractor.
• Dismantled materials if any are to be returned to the AE ,CUSAT.
• Running of STP should be as per directions in PCB clearance issued No PCB/EKM/DO-1/OC-107/13 dt.02.07.2013 and obtaining sanction if any also included in the scope of this work from PCB or any other Govt.Agencies/Local bodies
• Tax will be deducted from the bill. | 12 | month | - | - | - |
| 3.00For the 3rd Year | ||||||
| 3.01 | Running and maintaining STP as per PCB norms including attending blocks in man hole and sewage line connected to STP,all its constructions including operating control panel board from 6 am to 6 am (24 hours) by engaging qualified operator ,sewer man, qualified electrician for maintaining and repairing the pumps and motors as when required for proper functioning and as directed by the engineer in charge including disposal of dried sludge from STP ( penalty shall be deducted at quoted rate to be computed on per day basis for non attending. The rate is inclusive of both civil and electrical nature and materials required) Special Conditions:
• Any damages to the existing structure during the course of execution of the work shall be got repaired to its original position by contractor at his risk and cost.
• Work shall be carried out as per the K. P.C.B specification.
• The payment will be made by cheque only after satisfactory completion of the work.
• Rate is inclusive of all tax and nothing shall be paid extra.
• Necessary safety and insurance of the labour employed shall be arranged by the contractor as per rules.
• All T & P shall be arranged by the contractor.
• Material for day to day maintenance shall be met by the contractor.
• Dismantled materials if any are to be returned to the AE ,CUSAT.
• Running of STP should be as per directions in PCB clearance issued No PCB/EKM/DO-1/OC-107/13 dt.02.07.2013 and obtaining sanction if any also included in the scope of this work from PCB or any other Govt.Agencies/Local bodies
• Tax will be deducted from the bill. | 12 | Month | - | - | - |
Tender Value
₹12.6 L
EMD Value
₹31,500
Closing Date
28 Jun 2018, 5:00 pmClosed
REGISTRAR
Administartive office, CUSAT
Operation and Maintenance contract of sewage treatment Plant for boys hostels at CUSAT, Thrikkakara Campus for a period of three years
2018_CUSAT_210753_1
CUSAT/ET/UEU/1900(A)/18-19
Open Tender
Civil Works - Others
Item Rate
1080 days
CUSAT Thrikkakara Campus
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,800
Yes
online
₹31,500
Yes
18 Sept 2025
20 Jun 2018
3 Jul 2018
20 Jun 2018
28 Jun 2018
20 Jun 2018
Amount
For the 1st Year
Running and maintaining STP as per PCB norms including attending blocks in man hole and sewage line connected to STP,all its constructions including operating control panel board from 6 am to 6 am (24 hours) by engaging qualified operator ,sewer man, qualified electrician for maintaining and repairing the pumps and motors as when required for proper functioning and as directed by the engineer in charge including disposal of dried sludge from STP ( penalty shall be deducted at quoted rate to be computed on per day basis for non attending. The rate is inclusive of both civil and electrical nature and materials required) Special Conditions: • Any damages to the existing structure during the course of execution of the work shall be got repaired to its original position by contractor at his risk and cost. • Work shall be carried out as per the K. P.C.B specification. • The payment will be made by cheque only after satisfactory completion of the work. • Rate is inclusive of all tax and nothing shall be paid extra. • Necessary safety and insurance of the labour employed shall be arranged by the contractor as per rules. • All T & P shall be arranged by the contractor. • Material for day to day maintenance shall be met by the contractor. • Dismantled materials if any are to be returned to the AE ,CUSAT. • Running of STP should be as per directions in PCB clearance issued No PCB/EKM/DO-1/OC-107/13 dt.02.07.2013 and obtaining sanction if any also included in the scope of this work from PCB or any other Govt.Agencies/Local bodies • Tax will be deducted from the bill.
For the 2nd Year
Running and maintaining STP as per PCB norms including attending blocks in man hole and sewage line connected to STP,all its constructions including operating control panel board from 6 am to 6 am (24 hours) by engaging qualified operator ,sewer man, qualified electrician for maintaining and repairing the pumps and motors as when required for proper functioning and as directed by the engineer in charge including disposal of dried sludge from STP ( penalty shall be deducted at quoted rate to be computed on per day basis for non attending. The rate is inclusive of both civil and electrical nature and materials required) Special Conditions: • Any damages to the existing structure during the course of execution of the work shall be got repaired to its original position by contractor at his risk and cost. • Work shall be carried out as per the K. P.C.B specification. • The payment will be made by cheque only after satisfactory completion of the work. • Rate is inclusive of all tax and nothing shall be paid extra. • Necessary safety and insurance of the labour employed shall be arranged by the contractor as per rules. • All T & P shall be arranged by the contractor. • Material for day to day maintenance shall be met by the contractor. • Dismantled materials if any are to be returned to the AE ,CUSAT. • Running of STP should be as per directions in PCB clearance issued No PCB/EKM/DO-1/OC-107/13 dt.02.07.2013 and obtaining sanction if any also included in the scope of this work from PCB or any other Govt.Agencies/Local bodies • Tax will be deducted from the bill.
For the 3rd Year
Running and maintaining STP as per PCB norms including attending blocks in man hole and sewage line connected to STP,all its constructions including operating control panel board from 6 am to 6 am (24 hours) by engaging qualified operator ,sewer man, qualified electrician for maintaining and repairing the pumps and motors as when required for proper functioning and as directed by the engineer in charge including disposal of dried sludge from STP ( penalty shall be deducted at quoted rate to be computed on per day basis for non attending. The rate is inclusive of both civil and electrical nature and materials required) Special Conditions: • Any damages to the existing structure during the course of execution of the work shall be got repaired to its original position by contractor at his risk and cost. • Work shall be carried out as per the K. P.C.B specification. • The payment will be made by cheque only after satisfactory completion of the work. • Rate is inclusive of all tax and nothing shall be paid extra. • Necessary safety and insurance of the labour employed shall be arranged by the contractor as per rules. • All T & P shall be arranged by the contractor. • Material for day to day maintenance shall be met by the contractor. • Dismantled materials if any are to be returned to the AE ,CUSAT. • Running of STP should be as per directions in PCB clearance issued No PCB/EKM/DO-1/OC-107/13 dt.02.07.2013 and obtaining sanction if any also included in the scope of this work from PCB or any other Govt.Agencies/Local bodies • Tax will be deducted from the bill.
SWARAJ EQUIPMENT PVT LTD
CHAKKANAT ENGINEERING SOLUTIONS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_276620.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .