Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹2.3 L
Closing Date
7 Jul 2026, 2:00 pmClosed
Rotary screw electrical driven Air Compressor 500 CFM
65245061C~SER
65245061C
Open - Indigenous
(Goods/Service/AMC)
Jharkhand
₹0
₹2.3 L
7 Jul 2026
10 Jun 2026
(G01) Machine (Y) Description :The Cost of Basic machine. [ Warranty Period: 24 Months after the date of delivery ] ] Consignee CF(ROH DEPOT)/BKSC, SER Jharkhand 2.00 Numbers Product Inspection:Stage 1: raw material inspection (100% of PO Qty ), Stage 2: in Inspection Details process inspection (100% of PO Qty )
(G01) Accessories (Y) Description :Cost of the concomitant accessories according to tender specifications. [ Warranty Period:
Consignee CF(ROH DEPOT)/BKSC, SER Jharkhand 2.00 Numbers Inspection Details Stage Inspection Not Required
(G01) Spares (Y) Description :Cost of any other accessory which in the opinion of supplier is essentially required for makin g the machine fully functional. [ Warranty Period: 24 Months after the date of delivery ] ] Consignee CF(ROH DEPOT)/BKSC, SER Jharkhand 2.00 Numbers Inspection Details Stage Inspection Not Required
(G01) Services (Y) Description :Cost of Turnkey Charges viz. foundation, installation & commissioning etc ] At (Location) CF(ROH DEPOT)/BKSC, SER Jharkhand 2.00 Numbers
(G01) Services (Y) Description :Cost of Preventive Maintenance during 1st & 2nd year of Warranty Period. ] At (Location) CF(ROH DEPOT)/BKSC, SER Jharkhand 2.00 Numbers STORES-PCMM/SOUTH EASTERN RLY
(G01) Services (Y) Description :The power consumption cost for 4400 hrs. of operation (considering 2200 hrs./year i.e. for 2 years at full rated capacity as per clause 2.2 Note: 1. The power consumption cost will be calculated base d on the specific package (the package means the motor of compressor along with ancillary power consu ming equipments like cooler motor, fan motor etc.), input power at full rated capacity and full load operati ng pressure. For the purpose of comparison, a flat rate of electricity shall be taken @ Rs. 5 per unit (KW H our) consumption. 2. Formula for calculating power consumption cost will be Power consumption cost in R s = Total Input power of compressor including ancillary power consuming equipments of the machine at fu ll rated capacity in KW* 4400 hr * 5 . ] At (Location) CF(ROH DEPOT)/BKSC, SER Jharkhand 2.00 Numbers
(G01) Spares (Y) Description :Optional Accessories with break up of individual items as specified in clause 4.3 of section IV . [ Warranty Period: 24 Months after the date of delivery ] ] Consignee CF(ROH DEPOT)/BKSC, SER Jharkhand 2.00 Numbers Inspection Details Stage Inspection Not Required
(G01) Spares (Y) Description :Spares with break up of individual items as per clause 5 and clause 13 of section V . [ Warr anty Period: 24 Months after the date of delivery ] ] Consignee CF(ROH DEPOT)/BKSC, SER Jharkhand 2.00 Numbers Inspection Details Stage Inspection Not Required
(G01) Services (Y) Description :Cost of comprehensive AMC for five years after the warranty as per clause 17 ] At (Location) CF(ROH DEPOT)/BKSC, SER Jharkhand 2.00 Numbers
(G01) Spares (Y) Description :Consumables as per clause 6 of section V with break up of individual items as applicable. [ Warranty Period: 24 Months after the date of delivery ] ] Consignee CF(ROH DEPOT)/BKSC, SER Jharkhand 2.00 Numbers Inspection Details Stage Inspection Not Required Group G02-CF(ROH DEPOT)/BKSC-2 Inspection Details Stage Inspection Not Required
(G02) Machine (Y) Description :The Cost of Basic machine. [ Warranty Period: 30 Months after the date of delivery ] ] Consignee CF(ROH DEPOT)/BKSC, SER Jharkhand 2.00 Numbers Product Inspection:Stage 1: raw material inspection (100% of PO Qty ), Stage 2: in Inspection Details process inspection (100% of PO Qty )
(G02) Accessories (Y) Description :Cost of the concomitant accessories according to tender specifications. [ Warranty Period:
Consignee CF(ROH DEPOT)/BKSC, SER Jharkhand 2.00 Numbers Inspection Details Stage Inspection Not Required
(G02) Spares (Y) Description :Cost of any other accessory which in the opinion of supplier is essentially required for makin g the machine fully functional [ Warranty Period: 24 Months after the date of delivery ] ] Consignee CF(ROH DEPOT)/BKSC, SER Jharkhand 2.00 Numbers Inspection Details Stage Inspection Not Required
(G02) Services (Y) STORES-PCMM/SOUTH EASTERN RLY Description :Cost of Turnkey Charges viz. foundation, installation & commissioning etc ] At (Location) CF(ROH DEPOT)/BKSC, SER Jharkhand 2.00 Numbers
(G02) Services (Y) Description :Cost of Preventive Maintenance during 1st & 2nd year of Warranty Period. ] At (Location) CF(ROH DEPOT)/BKSC, SER Jharkhand 2.00 Numbers
(G02) Services (Y) Description :The power consumption cost for 4400 hrs. of operation (considering 2200 hrs./year i.e. for 2 years at full rated capacity as per clause 2.2 Note: 1. The power consumption cost will be calculated base d on the specific package (the package means the motor of compressor along with ancillary power consum ing equipments like cooler motor, fan motor etc.), input power at full rated capacity and full load operating pressure. For the purpose of comparison, a flat rate of electricity shall be taken @ Rs. 5 per unit (KW Hour) consumption. 2. Formula for calculating power consumption cost will be Power consumption cost in Rs = T otal Input power of compressor including ancillary power consuming equipments of the machine at full rat ed capacity in KW* 4400 hr * 5 ] At (Location) CF(ROH DEPOT)/BKSC, SER Jharkhand 2.00 Numbers
(G02) Spares (Y) Description :Optional Accessories with break up of individual items as specified in clause 4.3 of section IV . [ Warranty Period: 24 Months after the date of delivery ] ] Consignee CF(ROH DEPOT)/BKSC, SER Jharkhand 2.00 Numbers Inspection Details Stage Inspection Not Required
(G02) Spares (Y) Description :Spares with break up of individual items as per clause 5 and clause 13 of section V . [ Warr anty Period: 24 Months after the date of delivery ] ] Consignee CF(ROH DEPOT)/BKSC, SER Jharkhand 2.00 Numbers Inspection Details Stage Inspection Not Required
(G02) Services (Y) Description :Cost of comprehensive AMC for five years after the warranty as per clause 17 ] At (Location) CF(ROH DEPOT)/BKSC, SER Jharkhand 2.00 Numbers
(G02) Spares (Y) Description :Consumables as per clause 6 of section V with break up of individual items as applicable. [ Warranty Period: 24 Months after the date of delivery ] ] Consignee CF(ROH DEPOT)/BKSC, SER Jharkhand 2.00 Numbers Inspection Details Stage Inspection Not Required
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
5794980.pdf
ATTACHMENT
5794982.pdf
ATTACHMENT
5794985.pdf
ATTACHMENT
5794984.pdf
ATTACHMENT
5670227.pdf
ATTACHMENT
5166192.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .