| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.7 LAccepted-AOC COLLEGE ROAD CHABUA PO CHABUA DIST DIBRUGARH ASSAM 786184 | DIBRUGARH | ASSAM | 786184 | ₹16.7 L Quoted ₹17.3 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹18.9 L+₹1.6 L (9.29%)Rejected-Finance 16 BAITHAKKHANA ROAD 16 BAITHAKKHANA ROAD SEALDAH BAITHAKKHANA ROAD SEALDAH BAITHAKKHANA ROAD SEALDAH KOLKATA | ₹18.9 L+₹1.6 L (9.29%) | L2 | Rejected-Finance Higher than L1 Bidder |
| 3 | L3₹19.0 L+₹1.8 L (10.2%)Rejected-Finance 1389 RADHETENAMENT SOCIETY SARDAR ROAD SURENDRANAGAR SURENDRA NAGAR GUJARAT 363001 | SURENDRANAGAR | GUJARAT | 363001 | ₹19.0 L+₹1.8 L (10.2%) | L3 | Rejected-Finance Higher than L1 Bidder |
Tender Value
₹17.4 L
EMD Value
₹34,700
Closing Date
24 Oct 2020, 6:00 pmClosed
MAJ JYOTI PRAKASH SAHOO
GE 872 EWS, C/O 99 APO
SPECIAL REPAIRS OF IRON REMOVAL PLANT AND CONNECTED ACCESSORIES AT NLP MIL STN AND SPECIAL REPAIRS OF VOLTAGE STABILIZERS AT LIKABALI, NLP AND ALONG MIL STN UNDER GE 872 EWS
2020_MES_373260_2
8834/T-34/E8
Open Tender
Miscellaneous Works
Item Rate
122 days
ALONG
ALL AS PER NIT AND TENDER DOCUMENTS
7 documents required · 7 mandatory
₹500
GE 872 EWS
₹34,700
Yes
25 Nov 2020
7 Oct 2020
26 Oct 2020
7 Oct 2020
24 Oct 2020
12 Oct 2020
7 Oct 2020 - 9 Oct 2020
Amount
SPECIAL REPAIRS TO IRON REMOVAL PLANTS AT NLP
Excavating in Trenches, not exc. 1.50 Metre Wide and Depth not exc. 1.50 Metre for Taking out/up and Laying of Pipes, etc., Forming Surfaces to required Foundation, etc. and getting out as in Soft/Loose Soil, complete all as specified and as directed.
Returning, Filling in including Spreading, Levelling, Watering, Well Ramming in Layers not exc. 25 Cm, Providing Heaps along the Route of the Pipe Line with Surplus Soil in Soft/Loose Soil, complete all as specified and as directed.
M&L Galvanised Steel Water Tubing 15mm bore (dia), ‘medium grade’ with all Fittings as required at Site, laid in Trenches or fixed on Walls, Ceiling or laid in Floors or any Other Situations including Taking down/ up Steel Tubing with Connections/Fittings of any description, complete as all specified and as directed.
M&L Galvanised Steel Water Tubing 80mm bore (dia), ‘medium grade’ with all Fittings as required at Site, laid in Trenches including Taking down/ up Steel Tubing with Connections/ Fittings of any description, complete as all specified and as directed.
M&L Galvanised Steel Water Tubing 100mm bore (dia), ‘medium grade’ with all Fittings as required at Site, laid in Trenches including Taking down/ up Steel Tubing with Connections/ Fittings of any description, complete as all specified and as directed.
S&F Gun Metal Globe/Gate Valve 15mm bore (dia) with Iron Wheel Head, ISI marked, screwed both Ends for Iron Pipe including Taking down/out unserviceable Globe/Gate Valve, complete all as specified and as directed.
S&F Gun Metal Globe/Gate Valve 20mm bore (dia) with Iron Wheel Head, ISI marked, screwed both Ends for Iron Pipe including Taking down/out unserviceable Globe/Gate Valve, complete all as specified and as directed.
M&L Cast Iron Butter-fly Valve 80mm bore (dia), Wafer type, Flanged and drilled both Ends, ISI marked, conforming to IS:13095 with all Jointing Materials such as suitable size Mild Steel Nuts, Bolts, GI Washers, Rubber Gasket, etc. and Testing against Leakage including Taking out/ down Unserviceable Butter-fly Valve, complete all as specified and as directed.
M&L Cast Iron Sluice Valve 80mm bore (dia), Wafer type, ISI Marked and conforming to IS:13095, Class PN 1.6 including All Jointing Materials such as Mild Steel Bolts, Nuts, Washers, Gaskets, etc. and Testing including Taking down unserviceable Sluice Valve, complete all as specified and as directed.
M&L Cast Iron Sluice Valve 100mm bore (dia), Wafer type, ISI Marked and conforming to IS:13095, Class PN 1.6 including All Jointing Materials such as Mild Steel Bolts, Nuts, Washers, Gaskets, etc. and Testing including Taking down unserviceable Sluice Valve, complete all as specified and as directed.
M&L Dismantling Joints of Flanged Pipe 80mm bore (dia) in Position and Removing Old Rubber or Fiber Gasket, Bolts and Nuts, etc., complete all as specified and as directed.
M&L Dismantling Joints of Flanged Pipe 100mm bore (dia) in Position and Removing Old Rubber or Fiber Gasket, Bolts and Nuts, etc., complete all as specified and as directed.
M&L Taking out (Unloading) All Old Catalyst from Oxidation Chamber with Proper Care, Cleaning complete Pipes, Butter-fly Valves, etc. of any Capacity, Flow and Height by Opening the Manhole Cover disconnection and including Removing the Waste Materials up to a distance not exc. 100 Metre away from the Site of Work, Spreading and Levelling, complete all as specified and as directed.
M&L Taking out (Unloading) All Old Rusted and Muddy Filter Media like Sand, Gravels, etc. from Iron Removal Filter Vessel with Proper Care, Cleaning complete Pipes, Butter-fly Valves, etc. of any Capacity, Flow and Height by Opening the Manhole Cover disconnection and including Removing the Waste Materials up to a distance not exc. 100 Metre away from the Site of Work, Spreading and Levelling, complete all as specified and as directed.
Supply & Filling in layers New Manganese Dioxide (MnO₂) Compond (as approved) suitable for Use in Filteration Plant and Oxidation Chamber (as per requirements), complete all as specified and as directed.
Supply & Filling in layers New Washed, Cleaned, Dust Free Filter Media (Sand & Gravels) of Sizes 3/4"x1/2", 1/2"x1/4", 1/4"x1/8", 1/8" x1/6" (as approved) suitable for Use in Filteration Plant (as per requirements), complete all as specified and as directed.
S&F PVC Strainer, Double Nut type (as approved) as per Site requirements including Taking down/ up Unserviceable Strainer of any description, complete as all specified and as directed.
M&L Mild Steel Bolts, Nuts and all Gaskets (as approved) as per Site require-ments including Taking down/ up Unserviceable Bolts, Nuts, Gaskets, etc. of any description, complete as all specified and as directed.
S&F Pressure Gauge with Fittings (as approved) as per Site requirements including Taking down/ up Unserviceable Pressure Gauge of any description, complete as all specified and as directed.
Supply, Installation, Commissioning & Testing Chemical Dozing (Metering) Pump having Injecting Capacity 100 LITRE PER HOUR, Electro-magnetic typed and Suction & Discharge Tubing Spring Loaded Anti-shipon Valve, Foot Valve, etc. including Taking down Unserviceable Chemical Dozing (Metering) Pump of any description, complete as all specified and as directed. MAKE : RAMCO, Model No. RPQ-40/RC-11
Supply, Installation, Commissioning & Testing FRP 100 Litre Container fitted with SS-316 Agitator, complete in all respect as per Original Equipments Manufacturer (OEM) suitable for Over Head Tank of any Capacity as per Site requirements including Dismantling/Taking down unserviceable FRP Container and Connected Items, Complete all as specified and as directed. MAKE : RAMCO or equivalent Make as approved by GE.
M&L Disconnecting of defective Air Compressor including Electric Connection and Removing to AGE E/M Store Yard at NLP, Dismantling defective Air Compressor as per direction and in front of Engineer-in-Charge, Repairing and Replacing Unserviceable following Spare Parts including Cleaning Serviceable Spare Parts, Greasing, etc. and Re-assembling, Re-installation and Providing All Connections and Testing, complete all as specified and as directed:- (a) Air Pressure Gauge (b) Ball Bearing for Electric Motor (c) Comressor Oil (d) Gun Metal Butter-fly Valve 15mm bore (dia) (e) V-Belt NOTE : Cost of Spare Parts mentioned at Sl No. (a) to (e) here-in-above will deem to be included in the Quoted Unit Rate.
M&L Preparing Inner Surfaces of Iron Removal Filter Vessal and Oxidation Chamber (Empty i.e. after Taking out of Old Catalyst, Muddy Filter Media like Sand, Gravels, etc.) of any Capacity, Flow and Hight by through Scrapping Old Paints, Removing Rust, etc. with Emery Papers/ Eco Friendly Chemicals, Through Cleaning Complete and applying Two Coats of Anti-corrosive Black Bituminous Paints (suitable for Drinking Water Purpose) as per Standard Engineering Practice, complete all as specified and as directed.
M&L Preparing Inner Surfaces (after 14 to 21 Days Operation of Item No 1.23 here-in-before) of Iron Removal Filter Vessal and Oxidation Chamber (Empty i.e. after Taking out of Old Catalyst, Muddy Filter Media like Sand, Gravels, etc.) of any Capacity, Flow and Hight by through Scrapping Old Paints, Removing Rust, etc. with Emery Papers/ Eco Friendly Chemicals, Through Cleaning Complete and applying Two Coats of Anti-corrosive Black Bituminous Paints (suitable for Drinking Water Purpose) as per Standard Engineering Practice, complete all as specified and as directed.
SPECIAL REPAIRS TO VOLTAGE STABILIZERS AT LKB, NLP & ALONG
M&L Repairing, Servicing & Testing Automatic Operation Servo Controlled, Oil Cooled, 3 Phase Volage Stabilizer 400 KVA to 500 KVA Capacity of MAKE : VOLINA, Sl. No. 11/12/207 & Sl. No. 21/09/688, complete all as specified and as directed, comprising with the following Works:- (a) Taking Proper Shut Down in Writing/ Disconnecting Incoming & Outgoing Cable Connections and Earthing Connections from Volatge Stabilizer and LT Panels. (b) Removing Volage Stabilizer from Platform and Shifting to suitable Place/ Building/ Shed with the help of Crane/ Hydra/ Chain Pully, etc. as required at Site of Work. (c) Drain out Transformer Oil and Storing in suitable Container and Keep at Safe Place for Refilling. Container required for Serviceable/unserviceable Oil received from Draing out from Voltage Stabilizer will be within Scope of this Item. (d) To Carry out Inspection Internally by Opening Top Cover and Removing Bolts, Nuts, Washers and all Mounting Accessories. (e) Cleaning the Tank Internally with suitable Clothes before Refilling the Transformer Oil. (f) Refilling the New/ Serviceable Oil after Complete Repair. (g) Replacement of Worn out Parts such as Dimmer Coil, Transformer, etc including Liftting up/ out, Lowering down the Core. Burnt out/ Unserviceable Parts will be Measured and Paid under respective Items here-in-after. (h) Re-assembling the Same and Shifting back to the Plateform and Connecting All Incoming/ Outgoing Cable/ Earthing Connections, etc. including Testing ON LOAD on Completion of the Job all as directed by the Engineer-in-Charge. NOTE : All Tools & Plants, Machineries, Transportation, etc. as required at Site of Work will be arrang by the Contractor at his own Arrangment and Cost within the Quoted Unit Rate.
Supply only Amp Meter 0-1000 A with Set of 1000/5 A CTs, complete all as specified and as directed.
Supply only Carbon, complete all as specified and as directed.
Supply only Complete Control Panel, complete all as specified and as directed.
Supply only Dimmerstate 200 Amp, complete all as specified and as directed.
Supply only Electronic Control Panel with Servo Card, complete all as specified and as directed.
Supply only Volmeter 0-300 V, 72/96mm, complete all as specified and as directed.
M&L Repairing, Servicing & Testing Automatic Operation Servo Controlled, Oil Cooled, 3 Phase Volage Stabilizer 100 KVA Capacity of MAKE : VOLINA, Sl. No. 5/17/83, complete all as specified and as directed, comprising with the following Works:- (a) Taking Proper Shut Down in Writing/ Disconnecting Incoming & Outgoing Cable Connections and Earthing Connections from Volatge Stabilizer and LT Panels. (b) Removing Volage Stabilizer from Platform and Shifting to suitable Place/ Building/ Shed with the help of Crane/ Hydra/ Chain Pully, etc. as required at Site of Work. (c) Drain out Transformer Oil and Storing in suitable Container and Keep at Safe Place for Refilling. Container required for Serviceable/unserviceable Oil received from Draing out from Voltage Stabilizer will be within Scope of this Item. (d) To Carry out Inspection Internally by Opening Top Cover and Removing Bolts, Nuts, Washers and all Mounting Accessories. (e) Cleaning the Tank Internally with suitable Clothes before Refilling the Transformer Oil. (f) Refilling the New/ Serviceable Oil after Complete Repair. (g) Replacement of Worn out Parts such as Dimmer Coil, Transformer, etc including Liftting up/ out, Lowering down the Core. Burnt out/ Unserviceable Parts will be Measured and Paid under respective Items here-in-after. (h) Re-assembling the Same and Shifting back to the Plateform and Connecting All Incoming/ Outgoing Cable/ Earthing Connections, etc. including Testing ON LOAD on Completion of the Job all as directed by the Engineer-in-Charge. NOTE : All Tools & Plants, Machineries, Transportation, etc. as required at Site of Work will be arrang by the Contractor at his own Arrangment and Cost within the Quoted Unit Rate.
Supply only Amp Meter 0-200 A with Set of 200/5 A CTs, complete all as specified and as directed.
Supply only Carbon, complete all as specified and as directed.
Supply only Dimmerstate 40 Amp, complete all as specified and as directed.
Supply only Electronic Control Panel with Servo Card, complete all as specified and as directed.
Supply only Volmeter 0-300 V, 72/96mm, complete all as specified and as directed.
M&L Repairing, Servicing & Testing Automatic Operation Servo Controlled, Oil Cooled, 3 Phase Volage Stabilizer 30 KVA Capacity of MAKE : VOLINA, Sl. No. 11/16/316 and 11/11/58, complete all as specified and as directed, comprising with the following Works:- (a) Taking Proper Shut Down in Writing/ Disconnecting Incoming & Outgoing Cable Connections and Earthing Connections from Volatge Stabilizer and LT Panels. (b) Removing Volage Stabilizer from Platform and Shifting to suitable Place/ Building/ Shed with the help of Crane/ Hydra/ Chain Pully, etc. as required at Site of Work. (c) Drain out Transformer Oil and Storing in suitable Container and Keep at Safe Place for Refilling. Container required for Serviceable/unserviceable Oil received from Draing out from Voltage Stabilizer will be within Scope of this Item. (d) To Carry out Inspection Internally by Opening Top Cover and Removing Bolts, Nuts, Washers and all Mounting Accessories. (e) Cleaning the Tank Internally with suitable Clothes before Refilling the Transformer Oil. (f) Refilling the New/ Serviceable Oil after Complete Repair. (g) Replacement of Worn out Parts such as Dimmer Coil, Transformer, etc including Liftting up/ out, Lowering down the Core. Burnt out/ Unserviceable Parts will be Measured and Paid under respective Items here-in-after. (h) Re-assembling the Same and Shifting back to the Plateform and Connecting All Incoming/ Outgoing Cable/ Earthing Connections, etc. including Testing ON LOAD on Completion of the Job all as directed by the Engineer-in-Charge. NOTE : All Tools & Plants, Machineries, Transportation, etc. as required at Site of Work will be arrang by the Contractor at his own Arrangment and Cost within the Quoted Unit Rate.
Supply only Amp Meter 0-100 A with Set of 100/5 A CTs, complete all as specified and as directed.
Supply only Carbon, complete all as specified and as directed.
Supply only Complete Control Panel, complete all as specified and as directed.
Supply only Electronic Control Panel with Servo Card, complete all as specified and as directed.
Supply only Volmeter 0-300 V, 72/96mm, complete all as specified and as directed.
M&L Repairing, Servicing & Testing Automatic Operation Servo Controlled, Oil Cooled, 3 Phase Volage Stabilizer 25 KVA Capacity of MAKE : VOLINA, Sl. No. 5/17/83, complete all as specified and as directed, comprising with the following Works:- (a) Taking Proper Shut Down in Writing/ Disconnecting Incoming & Outgoing Cable Connections and Earthing Connections from Volatge Stabilizer and LT Panels. (b) Removing Volage Stabilizer from Platform and Shifting to suitable Place/ Building/ Shed with the help of Crane/ Hydra/ Chain Pully, etc. as required at Site of Work. (c) Drain out Transformer Oil and Storing in suitable Container and Keep at Safe Place for Refilling. Container required for Serviceable/unserviceable Oil received from Draing out from Voltage Stabilizer will be within Scope of this Item. (d) To Carry out Inspection Internally by Opening Top Cover and Removing Bolts, Nuts, Washers and all Mounting Accessories. (e) Cleaning the Tank Internally with suitable Clothes before Refilling the Transformer Oil. (f) Refilling the New/ Serviceable Oil after Complete Repair. (g) Replacement of Worn out Parts such as Dimmer Coil, Transformer, etc including Liftting up/ out, Lowering down the Core. Burnt out/ Unserviceable Parts will be Measured and Paid under respective Items here-in-after. (h) Re-assembling the Same and Shifting back to the Plateform and Connecting All Incoming/ Outgoing Cable/ Earthing Connections, etc. including Testing ON LOAD on Completion of the Job all as directed by the Engineer-in-Charge. NOTE : All Tools & Plants, Machineries, Transportation, etc. as required at Site of Work will be arrang by the Contractor at his own Arrangment and Cost within the Quoted Unit Rate.
Supply only Amp Meter 0-50 A with Set of 50/5 A CTs, complete all as specified and as directed.
Supply only Carbon, complete all as specified and as directed.
Supply only Complete Control Panel with Servo Card, complete all as specified and as directed.
Supply only Electronic Control Panel with Servo Card, complete all as specified and as directed.
Supply only Servo Motor 3.0 Kg with RC, complete all as specified and as directed.
Supply only Volmeter 0-300 V, 72/96mm, complete all as specified and as directed.
M&L Repairing, Servicing & Testing Automatic Operation Servo Controlled, Oil Cooled, 3 Phase Volage Stabilizer 25 KVA Capacity of MAKE : VOLINA, Sl. No. 02/15/306 & Sl No. 09/13/111, complete all as specified and as directed, comprising with the following Works:- (a) Taking Proper Shut Down in Writing/ Disconnecting Incoming & Outgoing Cable Connections and Earthing Connections from Volatge Stabilizer and LT Panels. (b) Removing Volage Stabilizer from Platform and Shifting to suitable Place/ Building/ Shed with the help of Crane/ Hydra/ Chain Pully, etc. as required at Site of Work. (c) Drain out Transformer Oil and Storing in suitable Container and Keep at Safe Place for Refilling. Container required for Serviceable/unserviceable Oil received from Draing out from Voltage Stabilizer will be within Scope of this Item. (d) To Carry out Inspection Internally by Opening Top Cover and Removing Bolts, Nuts, Washers and all Mounting Accessories. (e) Cleaning the Tank Internally with suitable Clothes before Refilling the Transformer Oil. (f) Refilling the New/ Serviceable Oil after Complete Repair. (g) Replacement of Worn out Parts such as Dimmer Coil, Transformer, etc including Liftting up/ out, Lowering down the Core. Burnt out/ Unserviceable Parts will be Measured and Paid under respective Items here-in-after. (h) Re-assembling the Same and Shifting back to the Plateform and Connecting All Incoming/ Outgoing Cable/ Earthing Connections, etc. including Testing ON LOAD on Completion of the Job all as directed by the Engineer-in-Charge. NOTE : All Tools & Plants, Machineries, Transportation, etc. as required at Site of Work will be arrang by the Contractor at his own Arrangment and Cost within the Quoted Unit Rate.
Supply only Carbon, complete all as specified and as directed.
Supply only Complete Control Panel with Servo Card, complete all as specified and as directed.
Supply only Dimmer Coil 10 Amp, complete all as specified and as directed.
Supply only Electronic Control Panel with Servo Card, complete all as specified and as directed.
Supply only Servo Motor 3.0 Kg with RC, complete all as specified and as directed.
M&L Dehydration & Filteration of Voltage Stabilizer Oil at Different Locations with Filtration Machine & Heating System to achive Di-electric Strength of Oil 40 kV minimum, complete all as specified and as directed.
Supply only New Transformer Oil of Di-electric Strength not be less than 60 kV and conforming to IS-335 of 1993 for Filling/ Topping up Oil of Transformer up to Desired Level, complete all as specified and as directed.
M/s HALDER ENTERPRISE
M/S S. P. ENTERPRISE
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .