Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC | ₹1.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.3 LRejected-AOC | ₹1.3 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SAJI A KURUVILLA L2 | Sabu A Kuruvila L1 |
|---|---|---|---|---|---|
| 1.00bund formation | |||||
| 1.00 | OD2924/2026-2027:Removal of Water Hyacinth using Hydraulic Excavator (3D) on Pontoon with Driver and Fuel for 8 hours work per day ( Average output of Hydraulic Excavator per Hours 150m2) and Dumping the Deposits within 150m as per the Directions of Departmental Officers at Site | 4,500 | sqm | 12.21 ₹54,945 | 12.15 ₹54,675 |
| 1.00 | OD2925/2026-2027:Engaging man coolie for removing plastic bottles, polythene bags & other debris in and around Kayal, River & Thodu and depositing as per the directions of the departmental officers at site. | 8 | Day | 1,082.18 ₹8,657.44 | 1,076.77 ₹8,614.16 |
| 1.00 | OD2926/2026-2027:Cutting timber logs / bamboos using machine saw and removing by engaging man mazdoor
using ropes, pully etc as per the direction of the departmental officers at site | 2 | Day | 9,125.69 ₹18,251.38 | 9,080.06 ₹18,160.12 |
| 1.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 17 | each | 377.65 ₹6,420.05 | 375.76 ₹6,387.92 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 150.6 | cum | 257.63 ₹38,799.08 | 256.34 ₹38,604.80 |
Tender Value
₹1.3 L
EMD Value
₹3,177
Closing Date
15 May 2026, 5:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer Irrigation Sub division Kaduthuruthy
GENERAL PREMONSOON 2026 27 Urgent Clearing of Meenachil River From Poovathummoodu Bridge to Kulapurakadavu Bridge and US DS Puthenangadi Thumbil Bridge in Kottayam and Ettumanoor Constituencies General Civil Work
2026_Irrig_850284_1
IRR/IA/TR/2280/2026_5_1_1/1
Open Tender
Civil Works - Others
180 days
Meenachil River From Poovathummoodu Bridge to Kula
Please refer tender documents
9 documents required · 9 mandatory
₹555
Yes
₹3,177
Yes
18 Jun 2026
12 May 2026
18 May 2026
12 May 2026
15 May 2026
12 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1bund formation | ||||||
| 1.001 | OD2924/2026-2027:Removal of Water Hyacinth using Hydraulic Excavator (3D) on Pontoon with Driver and Fuel for 8 hours work per day ( Average output of Hydraulic Excavator per Hours 150m2) and Dumping the Deposits within 150m as per the Directions of Departmental Officers at Site | - | sqm | - | - | BI01010001010000000000000515BI0100001114 |
| 1.002 | OD2925/2026-2027:Engaging man coolie for removing plastic bottles, polythene bags & other debris in and around Kayal, River & Thodu and depositing as per the directions of the departmental officers at site. | - | Day | - | - | BI01010001010000000000000515BI0100001115 |
| 1.003 | OD2926/2026-2027:Cutting timber logs / bamboos using machine saw and removing by engaging man mazdoor
using ropes, pully etc as per the direction of the departmental officers at site | - | Day | - | - | BI01010001010000000000000515BI0100001116 |
| 1.004 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - | BI01010001010000000000000515BI0100001117 |
| 1.005 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1 | cum | - | - | BI01010001010000000000000515BI0100001118 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 1.65 MB
Tendernotice_3.pdf
PDF • 0.27 MB
Tendernotice_4.pdf
PDF • 0.02 MB
Tendernotice_5.pdf
PDF • 0.04 MB
Tendernotice_6.pdf
PDF • 0.07 MB
Tendernotice_7.pdf
PDF • 0.47 MB
BOQ_1436868.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid