| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | D₹14.5 LAccepted-AOC | D | Accepted-AOC 1st lowest | |
| 2 | D₹22.9 LRejected-AOC | D | Rejected-AOC 2nd lowest |
Tender Value
Refer Docs
EMD Value
₹19,000
Closing Date
31 Dec 2020, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE Rampur
EE B and R Division HPPWD Rampur
SH Formation Cutting 3.5 mtr in km 0.288 to 0.363, C.O R.Wall at RD 0.295 to 0.308, 0.313 to 0.328, 0.328 to 0.348 and 0.348 to 0.363
2020_PWD_43421_1
PW/RAMP/TA/2020-14541-43 dated 04.12.2020
Open Tender
Civil Works - Roads
Item Rate
B and R Division HPPWD Rampur
Please refer Tender documents.
11 documents required · 11 mandatory
₹350
Yes
EE Rampur
₹19,000
Yes
13 Dec 2021
22 Dec 2020
31 Dec 2020
22 Dec 2020
31 Dec 2020
22 Dec 2020
22 Dec 2020 - 31 Dec 2020
90 days
Amount
Excavation in earthwork in hilly area all heights and depths, in all kind of soil including saturated soil comprising of mixed soil, ordinary rock and hard rock. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution, etc. and to protect stability of hill side. Rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited). All earth work in cutting /excavation, including rock excavation shall be carried out true to lines, grades , side slopes, width, camber, super-elevation and level as shown on the drawings or as directed by the Engineer-in-charge, in conformity with the requirement of technical specification for Rural Road, August, 2004 and clause 16.2 of General Conditions for Contract to achieve designed formation width including hauling and stacking of material useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified manner including arrangement of dumping site, trimming, filling of unevenness, blindage and finishing of the road to specified dimensions or as directed by the Engineer-in charge for smooth riding. The recovery for stones, whether useful or not, for 159.68 @ Rupees 170/= only per cubic metre shall be effected on pro rata basis in all circumstances. Any loss to the public and private property during the course of excavation shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all cases.
Excavation in Hill area by manual/mechanical means:- Excavation in soil in hill areas all heights and depth in all kind of soil including saturated soil comprising of mixed soil, ordinary rock and hardd rock all work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. and to protect stability of hill side. Rock shall be excavated with chiselling and wedging out rock( where blasting is prohibited) including cutting and trimming of side slopes and disposing of excavated earth with a lift upto all heights and all leads as directed by the Engineer-in-Charge, in conformately with the requirement of technical specification of rural roads clause 1603.1 all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases.
Excavation for structures:- Earth work in excavation for structure in all depth as per drawing and technical specification Clause 305-1 including setting out, construction of shoring and bracin , removal of stumps and other deleterious material and disposal in all lead and lift including dressisng of sides and bottom and back filling in trenches with excavated suitable material . All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion damage to hill side water pollution etc. and to protect stability of hill side. Rock shall be excavated with chiselling and wedging out of rock( where blasting is prohibited) as directed by the Engineer-in-Charge.all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases.
Providing and laying cement concrete 1:6:12 (1 cement:6 sand : 12 graded stone 40mm agregate nominal size) for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802,803, 1202 and 1203.including hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge.
Providing and laying cement concrete 1:4:8 (1 cement: 4 sand : 8 graded stone 40mm agregate nominal size) for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802,803, 1202 and 1203.including hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge.
Stone masonry work in cement mortar in insubstructure complete as per drawing and technical specifications clause 702,74,1202 & 1203. Random rubble masonry in 1:6 cement mortar. including hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge.
Construction of dry rubble masonary for retaining walls, breast walls , revetment walls and parapets etc. for sub structure and super structure complete as per drawing and technical specification Clauses 704.6& 1302.5. including materials and labour) including hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge.
Providing weapholes in brick masonry / stone masonry /plain reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full with of the structures with slop of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 including materials and labour) including hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge.
Backfilling behind abutment, wing wall and return wall complete as per drawings and technical specification clause 1204.3.8 with granular material. including hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge.
ANUP SHARMA
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .