| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹1.4 Cr+₹10.9 L (8.37%)Rejected-AOC | ₹1.4 Cr+₹10.9 L (8.37%) | L2 | Rejected-AOC L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.6 Cr
EMD Value
₹3.1 L
Closing Date
29 Sept 2018, 3:00 pmClosed
CEO, ASAMB
ASAMB, RK Mission Road,Ghy-07
SITE DEVELOPMENT WORK IN THE SITE OF PROPOSED TERMINAL MARKET AT SILCHAR, CACHAR Group I
2018_ASAMB_8535_1
ASAMB/ENGG/2497/2018/12
Open Tender
Civil Works – Roads
Works
180 days
Silchar
Please refer to Bidding Document
5 documents required · 5 mandatory
₹5,000
CEO, ASAMB
₹3.1 L
Yes
Conference hall, ASAMB, RK Mission Road,Ghy-07
7 Mar 2020
10 Sept 2018
1 Oct 2018
10 Sept 2018
29 Sept 2018
10 Sept 2018
20 Sept 2018
Amount
Excavation in Soil using Hydrolic Excavation CK-90 and Tippers with disposal up to 1000 metres. (Excavation for roadway in soil with hudrolic exacavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site within all lift and lead up to 1000 metres, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections)
Excavation in ordinary Rock using Hydrolic Excavation CK-90 and Tippers with disposal up to 1000 metres. (Excavation for roadway in ordinary rock with hudrolic exacavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site within all lift and lead up to 1000 metres, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections)
Excavation in Hard Rock (blasting prohibited) (Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers, and disposal within all all lift and lead up to 1000 metres, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections) A Mechanised
Embankment Construction with material obtained from borrow pits (Construction of embankment with approved material obtained from borrow pits with all lifts and lead, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2 including cost of testing of materials at site and laboratory as directed by the department.) (a) From private land
(c) Extra lead beyond initial lead of 3.00 Km. (Total lead considered = 8.00 Km.)
SMTI RUHINA AKTAR BARBHUIYA
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .