Anjani Kumar
EXECUVIT ENGINNER
Bairginiya Dhaka
DAYASHANKAR PRASAD
CHIEF ENGINEER (DESIGN)
Name of Work:- Operation of Ward level piped water supply schemes (Quality affected/NQ affected) & PWS Schemes by deploying pump operators and payment of electricity charges and Part II: Variable Comprehensive maintenance of Ward level water supply schemes (Quality affected/NQ affected) & PWS Schemes, i/c the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of ESR and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in districbuition line, repair and provision of new FHTCs, repair amd maintenance of pumps and other electromechanical components etc. all complete as per the directions of Engineer-in-charge. Blocks: All Blocks of Dhaka Division No. of schemes: WLS(Non Quality): - 54 WLS(Quality):- 00 PWS: -12
129611
NIT-01/2026-27 O&M-PHED GROUP-01
Open Tender
CIVIL
Purbi Champaran
• Registration Paper of appropriate class of PHED, Govt. of Bihar
• PAN Card
• Latest GST registration in state of Bihar.
• Email id for communication
• Turn Over
• Affidavit (as per latest stamp rule after publication of this tend
er) regarding Debarment / Black listing and Rescind of Contra
ct (as per clause 6 of the notes to tenderer)
• Experience Similar Nature
CIVIL
ITEM RATE
L1
1
12 documents required · 12 mandatory
₹10,000
Processing Fee: 5900
₹22.5 L
OFFICE OF THE EXECUTIVE ENGINEER P H DIVISION, DHAKA
29 Aug 2026
22 Apr 2026
1 Jun 2026
23 Apr 2026
1 Jun 2026
23 Apr 2026
27 Apr 2026
GOVERNMENT OF BIHAR
PUBLIC HEALTH ENGINEERING DEPARTMENT
NAME OF WORK:- ESTIMATE FOR O&M FOR NEXT FIVE YEAR AFTER COMPLETION OF FIVE YEAR O&M BY AGENCY OF All WLS SCHEME UNDER P.H. DIVISION DHAKA.
ESTIMATED COST- Rs.37,647,100.00
PUBLIC HEALTH DIVISION, DHAKA
PUBLIC HEALTH ENGINEERING DEPARTMENT P.H.DIVISION,ARA
P.H. DIVISION DHAKA
NAME OF WORK:- ESTIMATE FOR O&M FOR NEXT FIVE YEAR AFTER COMPLETION OF FIVE YEAR O&M BY AGENCY OF All WLS SCHEME UNDER P.H. DIVISION DHAKA .
This Estimate has been framed by Executive Engineer P.H. Division, Dhaka as per direction of department for O&M of WLS scheme whoes five year O&M had been completed and required another five year O&M to meet the cost of above work. This estimate has been framed in order to ensure the continuous water supply through WLS scheme including comprehensive operation and maintainance with payment of electricity bill as per attached list during the period of five year Under P.H. Division, Dhaka.
1 PROVISIONS:- The following provision has been made in this estimate:-
1. Maintainance of distribution system
2. Provision of maintainance for payment of operator and electricity bill.
3. Maintainanace of civil structure
4. Maintainanace of electrical and mechanical item
5. Provision of maintanainace of FHTC and GI posts.
6. Providing O&M for 5 years.
The rates taken for preparation of this estimate is based on the present labour & materials rates as circulated by the BCD SoR'2022. the rates of pipes which were circulated by the dept. and had been prevailing since 2018; has been escalated by a factor of 15.06% as directed by the CPWD.
4 Estimated Project Cost: The Estimated Cost of this Project comes to Rs.37,647,100.00
on the basis of current Bihar SOR effictive from 01.01.22, Revised rate approved by PHED Headquarter and Prevailing Market rates for Non Schedule items including 1% Contingency.
5 work Completion Time FIVE YEAR
6 Specification: All relevant standard specification of PWD, PHED of Govt. of Bihar will be followed during the execution of work.
Junior Engineer Assistant Engineer Executive Engineer
P.H.Section, Belhar P.H.Sub-Division,Belhar P.H. DIVISION DHAKA
GOVERNMENT OF BIHAR
Public Health Engineering Department
ABSTRACT OF COST
Estimate for the work:- O&M FOR NEXT FIVE YEAR AFTER COMPLETION OF FIVE YEAR O&M BY AGENCY OF WLS UNDER P.H. DIVISION DHAKA .
S.No. Description Quantity Unit Rate Total Amount O&M Completed on
1 Cost of Operation and maintainance of WLS Scheme in Panchayat-Tetariya,Ward-2,7,9&14,Block-Tetariya for five year(as per Sub estimate -1) 1 Nos. Rs.2,769,000.00 Rs.2,769,000.00 04-19-25
2 Cost of Operation and maintainance of WLS Scheme in Panchayat-Patahi East,Ward-1&9,Block-Patahi for five year(as per Sub estimate -2) 1 Nos. Rs.1,360,800.00 Rs.1,360,800.00 04-13-25
3 Cost of Operation and maintainance of WLS Scheme in Panchayat-Madhuban South,Ward-6,Block-Madhuban for five year(as per Sub estimate -3) 1 Nos. Rs.702,600.00 Rs.702,600.00 10-14-26
4 Cost of Operation and maintainance of WLS Scheme in Panchayat-Fenhara,Ward-15&19,Block-Fenhara for five year(as per Sub estimate -4) 1 Nos. Rs.1,371,800.00 Rs.1,371,800.00 03-15-25
5 Cost of Operation and maintainance of WLS Scheme in Panchayat-Shyampur,Ward-4,5,6,8&14,Block-Adapur for five year(as per Sub estimate -5) 1 Nos. Rs.3,496,000.00 Rs.3,496,000.00 03-24-26
6 Cost of Operation and maintainance of WLS Scheme in Panchayat-Auraiya,Ward-4,6,11&12,Block-Adapur for five year(as per Sub estimate -6) 1 Nos. Rs.2,788,800.00 Rs.2,788,800.00 03-24-26
7 Cost of Operation and maintainance of WLS Scheme in Panchayat-Sirsiya Kala,Ward-3&4,Block-Adapur for five year(as per Sub estimate -7) 1 Nos. Rs.1,403,600.00 Rs.1,403,600.00 05-07-26
8 Cost of Operation and maintainance of WLS Scheme in Panchayat-Narha Panapur,Ward-2,3&9,Block-Tetariya for five year(as per Sub estimate -8) 1 Nos. Rs.2,117,200.00 Rs.2,117,200.00 07-28-25
9 Cost of Operation and maintainance of WLS Scheme in Panchayat-Maduhaha Brit,Ward-1,6,7,9,12,14&15,Block-Tetariya for five year(as per Sub estimate -9) 1 Nos. Rs.4,862,100.00 Rs.4,862,100.00 07-22-25
10 Cost of Operation and maintainance of WLS Scheme in Panchayat-Madhuban south & North,Ward-5,7,8&11,Block-Madhuban for five year(as per Sub estimate -10) 1 Nos. Rs.2,813,400.00 Rs.2,813,400.00 11-20-25
11 Cost of Operation and maintainance of WLS Scheme in Panchayat-Rajepur,Ward-1A,1B&9B,Block-Mehsi for five year(as per Sub estimate -11) 1 Nos. Rs.2,102,200.00 Rs.2,102,200.00 07-11-25
12 Cost of Operation and maintainance of WLS Scheme in Panchayat-Purnahaiya,Ward-2,6,8,9,10,19&20,Block-Ghorasahan for five year(as per Sub estimate -12) 1 Nos. Rs.4,875,100.00 Rs.4,875,100.00 05-01-25
13 Cost of Operation and maintainance of WLS Scheme in Panchayat-Vishunpur,Ward-3,10,11&13,Block-Chakia for five year(as per Sub estimate -13) 1 Nos. Rs.2,789,000.00 Rs.2,789,000.00 04-19-25
14 Cost of Operation and maintainance of WLS Scheme in Panchayat-Rajepur,Ward-8,9A,11,12,14&15,Block-Mehsi for five year(as per Sub estimate -14) 1 Nos. Rs.4,195,500.00 Rs.4,195,500.00 04-21-25
Junior Engineer Assistant Engineer Executive Engineer
P.H.Division, Dhaka
Sub Estimate No.- 01
Estimate for Administrative Approval of Operation & maintenance of 4 nos. of Wrad level water supply schemes (Non Quality affected) for the period 2025-2030 in Block:TETARIYA Under P.H.Division, DHAKA.
1 Name of Division - DHAKA
2 Name of Sub Division - CHAKIA
3 Block - TETARIYA
4 Panchayat - TETARIA
5 Wards Covered - 02,07,09 & 14
6 No of schemes associated 4
7 Year of DB completion of original scheme - 2020 Remarks
sl. No. Description Unit Cost as per TS Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount 13
I. Fixed Costs per ward
(a) Cost of pump operator
1 nos for 365 days per month 4.00 4000.00 192000.00
Sub Total a= 192000.00
(b) Cost of energy charges
Capacity of motor pump say 3 HP=(.746x3.00= 2.24 kW) kW 2.24
Avg. running hrs,/day 8
Energy charges per year= avg. running hrs/dayx.746x3.00x365 per unit 6534.96 2.60 16990.896
fixed charges per month 12 100.00 3600.00
duty charges @6% of energy charge 1019.45
SubTotal b= 21610.35
No. of total wards 4 21610.35 86441.40
Total Fixed Cost (I) = 278,441.40
II. Variable Cost per ward
(a) Cost of chemical 0.539946 197.08029
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((200x5x81x4)/1000000)x100/30)x365 Kg/Year 394.161 150.00 59124.15 4927.0125 788.322
Sub Total a= 59124.15
(b) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 4 5000.00 20000.00
Sub Total b= 20000.00
(c) Infrastructure Maintenance
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 5
Sub Total (Civil work)= 43821.26 50941.75 50941.75
Sub Total c= 62888.13
Total Variable Cost II (a+b+c)= 142,012.28 295.858917
No. of total wards 4 142,012.28 142,012.28
III Expenditure (Misc. item such as water quality test report i/c allied stationery 5% of (II)=
IV Contractor's profit @ 10% on (I) & (II)= 42,045.37
V Add GST @ 18% on (I) & II)= 75,681.66
VI Add labour cess @ 1% on (II)= 1,420.12 355.0307003
VII Add cost towards emergent, unforseen breakdowns @ 10% on (II)= 14,201.23 22946.72176
VIII Variable Operation and maintainence cost for 1 year (III+IV+V+VI+VII+VIII)= 275,360.66 1153.754292 13845.0515
IX Total Cost (I) & (II)= 553,802.06
X Total Operation and maintainence cost for 5 year including fixed and variable costs= 2,769,010.30
Executive Engineer
P.H. Division Dhaka
Sub Estimate No.- 02
Estimate for Administrative Approval of Operation & maintenance of 2 nos. of Wrad level water supply schemes (Non Quality affected) for the period 2025-2030 in Block:PATAHI Under P.H.Division, DHAKA.
1 Name of Division - DHAKA
2 Name of Sub Division - DHAKA
3 Block - PATAHI
4 Panchayat - PATAHI EAST
5 Wards Covered - 1&9
6 No of schemes associated - 2
7 Year of DB completion of original scheme - 2020 Remarks
sl. No. Description Unit Cost as per TS Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount 13
I. Fixed Costs per ward
(a) Cost of pump operator
1 nos for 365 days per month 2.00 4000.00 96000.00
Sub Total a= 96000.00
(b) Cost of energy charges
Capacity of motor pump say 3 HP=(.746x3.00= 2.24 kW) kW 2.24
Avg. running hrs,/day 8
Energy charges per year= avg. running hrs/dayx.746x3.00x365 per unit 6534.96 2.60 16990.896
fixed charges per month per scheme 12 100.00 3600.00
duty charges @6% of energy charge 1019.45
SubTotal b= 21610.35
No. of total wards 2 21610.35 43220.70
Total Fixed Cost (I) = 139,220.70
II. Variable Cost per ward
(a) Cost of chemical 0.539946 197.08029
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((200x5x81x2)/1000000)x100/3)x365 Kg/Year 197.081 150.00 29562.15 2463.5125 394.162
Sub Total a= 29562.15
(b) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 2 5000.00 10000.00
Sub Total b= 10000.00
(c) Infrastructure Maintenance 197.0805
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 5
Sub Total (Civil work)= 19067.82 22061.12 22061.12
Sub Total (elctro mech)= 4680.15 5973.19 5973.19
Sub Total c= 28034.31
Total Variable Cost II (a+b+c)= 67,596.46 140.8259573
No. of total wards 2 67,596.46 67,596.46
III Expenditure (Misc. item such as water quality test report i/c allied stationery 5% of (II)=
IV Contractor's profit @ 10% on (I) & (II)= 20,681.72
V Add GST @ 18% on (I) & II)= 37,227.09
VI Add labour cess @ 1% on (II)= 675.96 168.9911488
VII Add cost towards emergent, unforseen breakdowns @ 10% on (II)= 6,759.65 11078.40622
VIII Variable Operation and maintainence cost for 1 year (III+IV+V+VI+VII+VIII)= 132,940.87 567.0032794 6804.039353
IX Total Cost (I) & (II)= 272,161.57
X Total Operation and maintainence cost for 5 year including fixed and variable costs= 1,360,807.87
Executive Engineer
P.H. Division Dhaka
Sub Estimate No.- 03
Estimate for Administrative Approval of Operation & maintenance of 1 nos. of Wrad level water supply schemes (Non Quality affected) for the period 2025-2030 in Block:MADHUBAN Under P.H.Division, DHAKA.
1 Name of Division - DHAKA
2 Name of Sub Division - CHAKIA
3 Block - MADHUBAN
4 Panchayat - MADHUBAN SOUTH
5 Wards Covered - 6
6 No of schemes associated 1
7 Year of DB completion of original scheme - 2020 Remarks
sl. No. Description Unit Cost as per TS Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount 13
I. Fixed Costs per ward
(a) Cost of pump operator
1 nos for 365 days per month 1.00 4000.00 48000.00
Sub Total a= 48000.00
(b) Cost of energy charges
Capacity of motor pump say 3 HP=(.746x3.00= 2.24 kW) kW 2.24
Avg. running hrs,/day 8
Energy charges per year= avg. running hrs/dayx.746x3.00x365x 1 scheme per unit 6534.96 2.60 16990.896
fixed charges per month 12 100.00 3600.00
duty charges @6% of energy charge 1019.45
SubTotal b= 21610.35
No. of total wards 1 21610.35 21610.35
Total Fixed Cost (I) = 69,610.35
II. Variable Cost per ward
(a) Cost of chemical 0.539946 197.08029
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((200x5x81x1)/1000000)x100/30)x365 Kg/Year 98.5405 150.00 14781.08 1231.75625 197.081
Sub Total a= 14781.08
(b) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 1 5000.00 5000.00
Sub Total b= 5000.00
(c) Infrastructure Maintenance 197.0805
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 5
Sub Total (Civil work)= 12160.74 14228.75 14228.75
Sub Total (elctro mech)= 2340.07 2986.59 2986.59
Sub Total c= 17215.34
Total Variable Cost II (a+b+c)= 36,996.42 77.07586788
No. of total wards 1 36,996.42 36,996.42
III Expenditure (Misc. item such as water quality test report i/c allied stationery 5% of (II)=
IV Contractor's profit @ 10% on (I) & (II)= 10,660.68
V Add GST @ 18% on (I) & II)= 19,189.22
VI Add labour cess @ 1% on (II)= 369.96 92.49104145
VII Add cost towards emergent, unforseen breakdowns @ 10% on (II)= 3,699.64 5909.659748
VIII Variable Operation and maintainence cost for 1 year (III+IV+V+VI+VII+VIII)= 70,915.92 292.7630557 3513.156669
IX Total Cost (I) & (II)= 140,526.27
X Total Operation and maintainence cost for 5 year including fixed and variable costs= 702,631.33
Executive Engineer
P.H. Division Dhaka
Sub Estimate No.- 04
Estimate for Administrative Approval of Operation & maintenance of 2 nos. of Wrad level water supply schemes (Non Quality affected) for the period 2025-2030 in Block:FENHARA Under P.H.Division, DHAKA.
1 Name of Division - DHAKA
2 Name of Sub Division - DHAKA
3 Block - FENHARA
4 Panchayat - FENHARA
5 Wards Covered - 15&19
6 No of schemes associated 2
7 Year of DB completion of original scheme - 2020 Remarks
sl. No. Description Unit Cost as per TS Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount 13
I. Fixed Costs per ward
(a) Cost of pump operator
1 nos for 365 days per month 2.00 4000.00 96000.00
Sub Total a= 96000.00
(b) Cost of energy charges
Capacity of motor pump say 3 HP=(.746x3.00= 2.24 kW) kW 2.24
Avg. running hrs,/day 8
Energy charges per year= avg. running hrs/dayx.746x3.00x365 per unit 6534.96 2.60 16990.896
fixed charges per month 12 100.00 3600.00
duty charges @6% of energy charge 1019.45
SubTotal b= 21610.35
No. of total wards 2 21610.35 43220.70
Total Fixed Cost (I) = 139,220.70
II. Variable Cost per ward
(a) Cost of chemical 0.539946 197.08029
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((200x5x81x2)/1000000)x100/30)x365 Kg/Year 197.081 150.00 29562.15 2463.5125 394.162
Sub Total a= 29562.15
(b) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 2 5000.00 10000.00
Sub Total b= 10000.00
(c) Infrastructure Maintenance 197.0805
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 5
Sub Total (Civil work)= 20505.11 23648.00 23648.00
Sub Total (elctro mech)= 4680.15 5973.19 5973.19
Sub Total c= 29621.19
Total Variable Cost II (a+b+c)= 69,183.34 144.1319668
No. of total wards 2 69,183.34 69,183.34
III Expenditure (Misc. item such as water quality test report i/c allied stationery 5% of (II)=
IV Contractor's profit @ 10% on (I) & (II)= 20,840.40
V Add GST @ 18% on (I) & II)= 37,512.73
VI Add labour cess @ 1% on (II)= 691.83 172.9583601
VII Add cost towards emergent, unforseen breakdowns @ 10% on (II)= 6,918.33 11262.22034
VIII Variable Operation and maintainence cost for 1 year (III+IV+V+VI+VII+VIII)= 135,146.64 571.5986325 6859.183591
IX Total Cost (I) & (II)= 274,367.34
X Total Operation and maintainence cost for 5 year including fixed and variable costs= 1,371,836.72
Executive Engineer
P.H. Division Dhaka
Sub Estimate No.- 05
Estimate for Administrative Approval of Operation & maintenance of 5 nos. of Wrad level water supply schemes (Non Quality affected) for the period 2025-2030 in Block:ADAPUR Under P.H.Division, DHAKA.
1 Name of Division - DHAKA
2 Name of Sub Division - CHAURADANO
3 Block - ADAPUR
4 Panchayat - SHYAMPUR
5 Wards Covered - 4,5,6,8&14
6 No of schemes associated 5
7 Year of DB completion of original scheme - 2020 Remarks
sl. No. Description Unit Cost as per TS Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount 13
I. Fixed Costs per ward
(a) Cost of pump operator
1 nos for 365 days per month 5.00 4000.00 240000.00
Sub Total a= 240000.00
(b) Cost of energy charges
Capacity of motor pump say 3 HP=(.746x3.00= 2.24 kW) kW 2.24
Avg. running hrs,/day 8
Energy charges per year= avg. running hrs/dayx.746x3.00x365 per unit 6534.96 2.60 16990.896
fixed charges per month 12 100.00 3600.00
duty charges @6% of energy charge 1019.45
SubTotal b= 21610.35
No. of total wards 5 21610.35 108051.75
Total Fixed Cost (I) = 348,051.75
II. Variable Cost per ward
(a) Cost of chemical 0.539946 197.08029
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((200x5x81x5)/1000000)x100/30)x365 Kg/Year 492.7025 150.00 73905.38 6158.78125 985.405
Sub Total a= 73905.38
(b) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 5 5000.00 25000.00
Sub Total b= 25000.00
(c) Infrastructure Maintenance 197.0805
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 5
Sub Total (Civil work)= 58829.26 68682 68681.83
Sub Total (elctro mech)= 11700.38 14932.97 14932.97
Sub Total c= 83614.80
Total Variable Cost II (a+b+c)= 182,520.18 380.250374
No. of total wards 5 182,520.18 182,520.18
III Expenditure (Misc. item such as water quality test report i/c allied stationery 5% of (II)=
IV Contractor's profit @ 10% on (I) & (II)= 53,057.19
V Add GST @ 18% on (I) & II)= 95,502.95
VI Add labour cess @ 1% on (II)= 1,825.20 456.3004488
VII Add cost towards emergent, unforseen breakdowns @ 10% on (II)= 18,252.02 29263.12827
VIII Variable Operation and maintainence cost for 1 year (III+IV+V+VI+VII+VIII)= 351,157.54 1456.686017 17480.2322
IX Total Cost (I) & (II)= 699,209.29
X Total Operation and maintainence cost for 5 year including fixed and variable costs= 3,496,046.44
Executive Engineer
P.H. Division Dhaka
Sub Estimate No.- 06
Estimate for Administrative Approval of Operation & maintenance of 4 nos. of Wrad level water supply schemes (Non Quality affected) for the period 2025-2030 in Block:ADAPUR Under P.H.Division, DHAKA.
1 Name of Division - DHAKA
2 Name of Sub Division - CHAURADANO
3 Block - ADAPUR
4 Panchayat - AURAIYA
5 Wards Covered - 4,6,11&12
6 No of schemes associated 4
7 Year of DB completion of original scheme - 2020 Remarks
sl. No. Description Unit Cost as per TS Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount 13
I. Fixed Costs per ward
(a) Cost of pump operator
1 nos for 365 days per month 4.00 4000.00 192000.00
Sub Total a= 192000.00
(b) Cost of energy charges
Capacity of motor pump say 3 HP=(.746x3.00= 2.24 kW) kW 2.24
Avg. running hrs,/day 8
Energy charges per year= avg. running hrs/dayx.746x3.00x365 per unit 6534.96 2.60 16990.896
fixed charges per month 12 100.00 3600.00
duty charges @6% of energy charge 1019.45
SubTotal b= 21610.35
No. of total wards 4 21610.35 86441.40
Total Fixed Cost (I) = 278,441.40
II. Variable Cost per ward
(a) Cost of chemical 0.539946 197.08029
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((200x5x81x4)/1000000)x100/30)x365 Kg/Year 394.162 150.00 59124.30 4927.025 788.324
Sub Total a= 59124.30
(b) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 4 5000.00 20000.00
Sub Total b= 20000.00
(c) Infrastructure Maintenance 197.0805
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 5
Sub Total (Civil work)= 46122.89 53788.97 53788.97
Sub Total (elctro mech)= 9360.30 11946.38 11946.38
Sub Total c= 65735.35
Total Variable Cost II (a+b+c)= 144,859.65 301.79093
No. of total wards 4 144,859.65 144,859.65
III Expenditure (Misc. item such as water quality test report i/c allied stationery 5% of (II)=
IV Contractor's profit @ 10% on (I) & (II)= 42,330.10
V Add GST @ 18% on (I) & II)= 76,194.19
VI Add labour cess @ 1% on (II)= 1,448.60 362.1491159
VII Add cost towards emergent, unforseen breakdowns @ 10% on (II)= 14,485.96 23276.54168
VIII Variable Operation and maintainence cost for 1 year (III+IV+V+VI+VII+VIII)= 279,318.50 1161.99979 13943.99748
IX Total Cost (I) & (II)= 557,759.90
X Total Operation and maintainence cost for 5 year including fixed and variable costs= 2,788,799.50
Executive Engineer
P.H. Division Dhaka
Sub Estimate No.- 07
Estimate for Administrative Approval of Operation & maintenance of 2 nos. of Wrad level water supply schemes (Non Quality affected) for the period 2025-2030 in Block:ADAPUR Under P.H.Division, DHAKA.
1 Name of Division - DHAKA
2 Name of Sub Division - CHAURADANO
3 Block - ADAPUR
4 Panchayat - SIRSIYA KALA
5 Wards Covered - 3&4
6 No of schemes associated 2
7 Year of DB completion of original scheme - 2020 Remarks
sl. No. Description Unit Cost as per TS Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount 13
I. Fixed Costs per ward
(a) Cost of pump operator
1 nos for 365 days per month 2.00 4000.00 96000.00
Sub Total a= 96000.00
(b) Cost of energy charges
Capacity of motor pump say 3 HP=(.746x3.00= 2.24 kW) kW 2.24
Avg. running hrs,/day 8
Energy charges per year= avg. running hrs/dayx.746x3.00x365 per unit 6534.96 2.60 16990.896
fixed charges per month 12 100.00 3600.00
duty charges @6% of energy charge 1019.45
SubTotal b= 21610.35
No. of total wards 2 21610.35 43220.70
Total Fixed Cost (I) = 139,220.70
II. Variable Cost per ward
(a) Cost of chemical 0.539946 197.08029
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((200x5x81x2)/1000000)x100/30)x365 Kg/Year 197.081 150.00 29562.15 2463.5125 394.162
Sub Total a= 29562.15
(b) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 2 5000.00 10000.00
Sub Total b= 10000.00
(c) Infrastructure Maintenance 197.0805
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 5
Sub Total (Civil work)= 24130.42 28213.63 28213.63
Sub Total (elctro mech)= 4680.15 5973.19 5973.19
Sub Total c= 34186.82
Total Variable Cost II (a+b+c)= 73,748.97 153.6436959
No. of total wards 2 73,748.97 73,748.97
III Expenditure (Misc. item such as water quality test report i/c allied stationery 5% of (II)=
IV Contractor's profit @ 10% on (I) & (II)= 21,296.97
V Add GST @ 18% on (I) & II)= 38,334.54
VI Add labour cess @ 1% on (II)= 737.49 184.3724351
VII Add cost towards emergent, unforseen breakdowns @ 10% on (II)= 7,374.90 11791.07248
VIII Variable Operation and maintainence cost for 1 year (III+IV+V+VI+VII+VIII)= 141,492.87 584.8199361 7017.839233
IX Total Cost (I) & (II)= 280,713.57
X Total Operation and maintainence cost for 5 year including fixed and variable costs= 1,403,567.85
Executive Engineer
P.H. Division Dhaka
Sub Estimate No.- 08
Estimate for Administrative Approval of Operation & maintenance of 3 nos. of Wrad level water supply schemes (Non Quality affected) for the period 2025-2030 in Block:TETARIYA Under P.H.Division, DHAKA.
1 Name of Division - DHAKA
2 Name of Sub Division - CHAKIA
3 Block - TETARIYA
4 Panchayat - NARHA PANAPUR
5 Wards Covered - 02,03&09
6 No of schemes associated 3
7 Year of DB completion of original scheme - 2020 Remarks
sl. No. Description Unit Cost as per TS Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount 13
I. Fixed Costs per ward
(a) Cost of pump operator
1 nos for 365 days per month 3.00 4000.00 144000.00
Sub Total a= 144000.00
(b) Cost of energy charges
Capacity of motor pump say 3 HP=(.746x3.00= 2.24 kW) kW 2.24
Avg. running hrs,/day 8
Energy charges per year= avg. running hrs/dayx.746x3.00x365 per unit 6534.96 2.60 16990.896
fixed charges per month 12 100.00 3600.00
duty charges @6% of energy charge 1019.45
SubTotal b= 21610.35
No. of total wards 3 21610.35 64831.05
Total Fixed Cost (I) = 208,831.05
II. Variable Cost per ward
(a) Cost of chemical 0.539946 197.08029
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((200x5x81x3)/1000000)x100/30)x365 Kg/Year 295.6215 150.00 44343.23 3695.26875 591.243
Sub Total a= 44343.23
(b) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 3 5000.00 15000.00
Sub Total b= 15000.00
(c) Infrastructure Maintenance 197.0805
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 5
Sub Total (Civil work)= 37734.32 44021.13 44021.13
Sub Total (elctro mech)= 7020.23 8959.78 8959.78
Sub Total c= 52980.91
Total Variable Cost II (a+b+c)= 112,324.14 234.0086197
No. of total wards 3 112,324.14 112,324.14
III Expenditure (Misc. item such as water quality test report i/c allied stationery 5% of (II)=
IV Contractor's profit @ 10% on (I) & (II)= 32,115.52
V Add GST @ 18% on (I) & II)= 57,807.93
VI Add labour cess @ 1% on (II)= 1,123.24 280.8103436
VII Add cost towards emergent, unforseen breakdowns @ 10% on (II)= 11,232.41 17883.60374
VIII Variable Operation and maintainence cost for 1 year (III+IV+V+VI+VII+VIII)= 214,603.24 882.1547794 10585.85735
IX Total Cost (I) & (II)= 423,434.29
X Total Operation and maintainence cost for 5 year including fixed and variable costs= 2,117,171.47
Executive Engineer
P.H. Division Dhaka
Sub Estimate No.- 09
Estimate for Administrative Approval of Operation & maintenance of 7 nos. of Wrad level water supply schemes (Non Quality affected) for the period 2025-2030 in Block:TETARIYA Under P.H.Division, DHAKA.
1 Name of Division - DHAKA
2 Name of Sub Division - CHAKIA
3 Block - TETARIYA
4 Panchayat - MADUAHA BRIT
5 Wards Covered - 1,6,7,9,12,14&15
6 No of schemes associated 7
7 Year of DB completion of original scheme - 2020 Remarks
sl. No. Description Unit Cost as per TS Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount 13
I. Fixed Costs per ward
(a) Cost of pump operator
1 nos for 365 days per month 7.00 4000.00 336000.00
Sub Total a= 336000.00
(b) Cost of energy charges
Capacity of motor pump say 3 HP=(.746x3.00= 2.24 kW) kW 2.24
Avg. running hrs,/day 8
Energy charges per year= avg. running hrs/dayx.746x3.00x365 per unit 6534.96 2.60 16990.896
fixed charges per month 12 100.00 3600.00
duty charges @6% of energy charge 1019.45
SubTotal b= 21610.35
No. of total wards 7 21610.35 151272.45
Total Fixed Cost (I) = 487,272.45
II. Variable Cost per ward
(a) Cost of chemical 0.539946 197.08029
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((200x5x81x7)/1000000)x100/30)x365 Kg/Year 689.7835 150.00 103467.53 8622.29375 1379.567
Sub Total a= 103467.53
(b) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 7 5000.00 35000.00
Sub Total b= 35000.00
(c) Infrastructure Maintenance 197.0805
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 5
Sub Total (Civil work)= 78707.34 91499.07 91499.07
Sub Total (elctro mech)= 16380.53 20906.16 20906.16
Sub Total c= 112405.23
Total Variable Cost II (a+b+c)= 250,872.76 522.6515815
No. of total wards 7 250,872.76 250,872.76
III Expenditure (Misc. item such as water quality test report i/c allied stationery 5% of (II)=
IV Contractor's profit @ 10% on (I) & (II)= 73,814.52
V Add GST @ 18% on (I) & II)= 132,866.14
VI Add labour cess @ 1% on (II)= 2,508.73 627.1818978
VII Add cost towards emergent, unforseen breakdowns @ 10% on (II)= 25,087.28 40429.11839
VIII Variable Operation and maintainence cost for 1 year (III+IV+V+VI+VII+VIII)= 485,149.42 2025.878894 24310.54673
IX Total Cost (I) & (II)= 972,421.87
X Total Operation and maintainence cost for 5 year including fixed and variable costs= 4,862,109.35
Executive Engineer
P.H. Division Dhaka
Sub Estimate No.- 10
Estimate for Administrative Approval of Operation & maintenance of 4 nos. of Wrad level water supply schemes (Non Quality affected) for the period 2025-2030 in Block:MADHUBAN Under P.H.Division, DHAKA.
1 Name of Division - DHAKA
2 Name of Sub Division - CHAKIA
3 Block - MADHUBAN
4 Panchayat - MADHUBAN SOUTH & MADHUBAN NORTH
5 Wards Covered - 5,7,8&11
6 No of schemes associated 4
7 Year of DB completion of original scheme - 2020 Remarks
sl. No. Description Unit Cost as per TS Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount 13
I. Fixed Costs per ward
(a) Cost of pump operator
1 nos for 365 days per month 4.00 4000.00 192000.00
Sub Total a= 192000.00
(b) Cost of energy charges
Capacity of motor pump say 3 HP=(.746x3.00= 2.24 kW) kW 2.24
Avg. running hrs,/day 8
Energy charges per year= avg. running hrs/dayx.746x3.00x365 per unit 6534.96 2.60 16990.896
fixed charges per month 12 100.00 3600.00
duty charges @6% of energy charge 1019.45
SubTotal b= 21610.35
No. of total wards 4 21610.35 86441.40
Total Fixed Cost (I) = 278,441.40
II. Variable Cost per ward
(a) Cost of chemical 0.539946 197.08029
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((200x5x81x4)/1000000)x100/3)x365 Kg/Year 394.162 150.00 59124.30 4927.025 788.324
Sub Total a= 59124.30
(b) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 4 5000.00 20000.00
Sub Total b= 20000.00
(c) Infrastructure Maintenance 197.0805
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 5
Sub Total (Civil work)= 49153.28 57332.18 57332.18
Sub Total (elctro mech)= 9360.30 11946.38 11946.38
Sub Total c= 69278.56
Total Variable Cost II (a+b+c)= 148,402.86 309.1726234
No. of total wards 4 148,402.86 148,402.86
III Expenditure (Misc. item such as water quality test report i/c allied stationery 5% of (II)=
IV Contractor's profit @ 10% on (I) & (II)= 42,684.43
V Add GST @ 18% on (I) & II)= 76,831.97
VI Add labour cess @ 1% on (II)= 1,484.03 371.0071481
VII Add cost towards emergent, unforseen breakdowns @ 10% on (II)= 14,840.29 23686.96384
VIII Variable Operation and maintainence cost for 1 year (III+IV+V+VI+VII+VIII)= 284,243.57 1172.260344 14067.12413
IX Total Cost (I) & (II)= 562,684.97
X Total Operation and maintainence cost for 5 year including fixed and variable costs= 2,813,424.83
Executive Engineer
P.H. Division Dhaka
Sub Estimate No.- 11
Estimate for Administrative Approval of Operation & maintenance of 3 nos. of Wrad level water supply schemes (Non Quality affected) for the period 2025-2030 in Block:MEHSI Under P.H.Division, DHAKA.
1 Name of Division - DHAKA
2 Name of Sub Division - CHAKIA
3 Block - MEHSI
4 Panchayat - RAJEPUR
5 Wards Covered - 1A,1B&9B
6 No of schemes associated 3
7 Year of DB completion of original scheme - 2020 Remarks
sl. No. Description Unit Cost as per TS Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount 13
I. Fixed Costs per ward
(a) Cost of pump operator
1 nos for 365 days per month 3.00 4000.00 144000.00
Sub Total a= 144000.00
(b) Cost of energy charges
Capacity of motor pump say 3 HP=(.746x3.00= 2.24 kW) kW 2.24
Avg. running hrs,/day 8
Energy charges per year= avg. running hrs/dayx.746x3.00x365 per unit 6534.96 2.60 16990.896
fixed charges per month 12 100.00 3600.00
duty charges @6% of energy charge 1019.45
SubTotal b= 21610.35
No. of total wards 3 21610.35 64831.05
Total Fixed Cost (I) = 208,831.05
II. Variable Cost per ward
(a) Cost of chemical 0.539946 197.08029
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((200x5x81x3)/1000000)x100/30)x365 Kg/Year 295.6215 150.00 44343.23 3695.26875 591.243
Sub Total a= 44343.23
(b) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 3 5000.00 15000.00
Sub Total b= 15000.00
(c) Infrastructure Maintenance 197.0805
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 5
Sub Total (Civil work)= 36018.45 41863.44 41863.44
Sub Total (elctro mech)= 7020.23 8959.78 8959.78
Sub Total c= 50823.23
Total Variable Cost II (a+b+c)= 110,166.45 229.5134425
No. of total wards 3 110,166.45 110,166.45
III Expenditure (Misc. item such as water quality test report i/c allied stationery 5% of (II)=
IV Contractor's profit @ 10% on (I) & (II)= 31,899.75
V Add GST @ 18% on (I) & II)= 57,419.55
VI Add labour cess @ 1% on (II)= 1,101.66 275.4161309
VII Add cost towards emergent, unforseen breakdowns @ 10% on (II)= 11,016.65 17633.67188
VIII Variable Operation and maintainence cost for 1 year (III+IV+V+VI+VII+VIII)= 211,604.06 875.9064831 10510.8778
IX Total Cost (I) & (II)= 420,435.11
X Total Operation and maintainence cost for 5 year including fixed and variable costs= 2,102,175.56
Executive Engineer
P.H. Division Dhaka
Sub Estimate No.- 12
Estimate for Administrative Approval of Operation & maintenance of 7 nos. of Wrad level water supply schemes (Non Quality affected) for the period 2025-2030 in Block:GHORASAHAN Under P.H.Division, DHAKA.
1 Name of Division - DHAKA
2 Name of Sub Division - CHAURADANO
3 Block - GHORASAHAN
4 Panchayat - PURNAHIYA
5 Wards Covered - 2,6,8,9,10,19&20
6 No of schemes associated 7
7 Year of DB completion of original scheme - 2020 Remarks
sl. No. Description Unit Cost as per TS Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount 13
I. Fixed Costs per ward
(a) Cost of pump operator
1 nos for 365 days per month 7.00 4000.00 336000.00
Sub Total a= 336000.00
(b) Cost of energy charges
Capacity of motor pump say 3 HP=(.746x3.00= 2.24 kW) kW 2.24
Avg. running hrs,/day 8
Energy charges per year= avg. running hrs/dayx.746x3.00x365 per unit 6534.96 2.60 16990.896
fixed charges per month 12 100.00 3600.00
duty charges @6% of energy charge 1019.45
SubTotal b= 21610.35
No. of total wards 7 21610.35 151272.45
Total Fixed Cost (I) = 487,272.45
II. Variable Cost per ward
(a) Cost of chemical 0.539946 197.08029
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((200x5x81x7)/1000000)x100/30)x365 Kg/Year 689.7835 150.00 103467.53 8622.29375 1379.567
Sub Total a= 103467.53
(b) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 7 5000.00 35000.00
Sub Total b= 35000.00
(c) Infrastructure Maintenance 197.0805
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 5
Sub Total (Civil work)= 80226.10 93373.32 93373.32
Sub Total (elctro mech)= 16380.53 20906.16 20906.16
Sub Total c= 114279.49
Total Variable Cost II (a+b+c)= 252,747.01 526.5562711
No. of total wards 3 252,747.01 252,747.01
III Expenditure (Misc. item such as water quality test report i/c allied stationery 5% of (II)=
IV Contractor's profit @ 10% on (I) & (II)= 74,001.95
V Add GST @ 18% on (I) & II)= 133,203.50
VI Add labour cess @ 1% on (II)= 2,527.47 631.8675253
VII Add cost towards emergent, unforseen breakdowns @ 10% on (II)= 25,274.70 40646.21913
VIII Variable Operation and maintainence cost for 1 year (III+IV+V+VI+VII+VIII)= 487,754.63 2031.306412 24375.67695
IX Total Cost (I) & (II)= 975,027.08
X Total Operation and maintainence cost for 5 year including fixed and variable costs= 4,875,135.39
Executive Engineer
P.H. Division Dhaka
Sub Estimate No.- 13
Estimate for Administrative Approval of Operation & maintenance of 4 nos. of Wrad level water supply schemes (Non Quality affected) for the period 2025-2030 in Block:CHAKIA Under P.H.Division, DHAKA.
1 Name of Division - DHAKA
2 Name of Sub Division - CHAKIA
3 Block - CHAKIA
4 Panchayat - VISHUNPUR
5 Wards Covered - 3,10,11&13
6 No of schemes associated 4
7 Year of DB completion of original scheme - 2020 Remarks
sl. No. Description Unit Cost as per TS Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount 13
I. Fixed Costs per ward
(a) Cost of pump operator
1 nos for 365 days per month 4.00 4000.00 192000.00
Sub Total a= 192000.00
(b) Cost of energy charges
Capacity of motor pump say 3 HP=(.746x3.00= 2.24 kW) kW 2.24
Avg. running hrs,/day 8
Energy charges per year= avg. running hrs/dayx.746x3.00x365 per unit 6534.96 2.60 16990.896
fixed charges per month 12 100.00 3600.00
duty charges @6% of energy charge 1019.45
SubTotal b= 21610.35
No. of total wards 4 21610.35 86441.40
Total Fixed Cost (I) = 278,441.40
II. Variable Cost per ward
(a) Cost of chemical 0.539946 197.08029
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((200x5x81x4)/1000000)x100/30)x365 Kg/Year 394.162 150.00 59124.30 4927.025 788.324
Sub Total a= 59124.30
(b) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 4 5000.00 20000.00
Sub Total b= 20000.00
(c) Infrastructure Maintenance 197.0805
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 5
Sub Total (Civil work)= 46276.04 53818.75 53818.75
Sub Total (elctro mech)= 9360.30 11946.38 11946.38
Sub Total c= 65765.13
Total Variable Cost II (a+b+c)= 144,889.43 301.8529846
No. of total wards 3 144,889.43 144,889.43
III Expenditure (Misc. item such as water quality test report i/c allied stationery 5% of (II)=
IV Contractor's profit @ 10% on (I) & (II)= 42,333.08
V Add GST @ 18% on (I) & II)= 76,199.55
VI Add labour cess @ 1% on (II)= 1,448.89 362.2235815
VII Add cost towards emergent, unforseen breakdowns @ 10% on (II)= 14,488.94 23279.99192
VIII Variable Operation and maintainence cost for 1 year (III+IV+V+VI+VII+VIII)= 279,359.90 1162.086046 13945.03255
IX Total Cost (I) & (II)= 557,801.30
X Total Operation and maintainence cost for 5 year including fixed and variable costs= 2,789,006.51
Executive Engineer
P.H. Division Dhaka
Sub Estimate No.- 14
Estimate for Administrative Approval of Operation & maintenance of 6 nos. of Wrad level water supply schemes (Non Quality affected) for the period 2025-2030 in Block:MEHSI Under P.H.Division, DHAKA.
1 Name of Division - DHAKA
2 Name of Sub Division - CHAKIA
3 Block - MEHSI
4 Panchayat - RAJEPUR
5 Wards Covered - 8,9A,11,12,14&15
6 No of schemes associated 6
7 Year of DB completion of original scheme - 2020 Remarks
sl. No. Description Unit Cost as per TS Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount 13
I. Fixed Costs per ward
(a) Cost of pump operator
1 nos for 365 days per month 6.00 4000.00 288000.00
Sub Total a= 288000.00
(b) Cost of energy charges
Capacity of motor pump say 3 HP=(.746x3.00= 2.24 kW) kW 2.24
Avg. running hrs,/day 8
Energy charges per year= avg. running hrs/dayx.746x3.00x365 per unit 6534.96 2.60 16990.896
fixed charges per month 12 100.00 3600.00
duty charges @6% of energy charge 1019.45
SubTotal b= 21610.35
No. of total wards 6 21610.35 129662.10
Total Fixed Cost (I) = 417,662.10
II. Variable Cost per ward
(a) Cost of chemical 0.539946 197.08029
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((200x5x81x6)/1000000)x100/30)x365 Kg/Year 591.243 150.00 88686.45 7390.5375 1182.486
Sub Total a= 88686.45
(b) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 6 5000.00 30000.00
Sub Total b= 30000.00
(c) Infrastructure Maintenance 197.0805
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 5
Sub Total (Civil work)= 70767.37 82456.84 82456.84
Sub Total (elctro mech)= 14040.45 17919.57 17919.57
Sub Total c= 100376.41
Total Variable Cost II (a+b+c)= 219,062.86 456.3809591
No. of total wards 6 219,062.86 219,062.86
III Expenditure (Misc. item such as water quality test report i/c allied stationery 5% of (II)=
IV Contractor's profit @ 10% on (I) & (II)= 63,672.50
V Add GST @ 18% on (I) & II)= 114,610.49
VI Add labour cess @ 1% on (II)= 2,190.63 547.6571509
VII Add cost towards emergent, unforseen breakdowns @ 10% on (II)= 21,906.29 35120.23029
VIII Variable Operation and maintainence cost for 1 year (III+IV+V+VI+VII+VIII)= 421,442.76 1748.135129 20977.62155
IX Total Cost (I) & (II)= 839,104.86
X Total Operation and maintainence cost for 5 year including fixed and variable costs= 4,195,524.31
Executive Engineer
P.H. Division Dhaka
Sub Estimate No.- 01
Estimate for Administrative Approval of Operation & maintenance of 2 nos. of Wrad level water supply schemes (Non Quality affected) for the period 2025-2030 in Block:BAIKUNTHPUR Under P.H.Division, GOPALGANJ.
1 Name of Division - GOPALGANJ
2 Name of Sub Division - BARAULI
3 Block - BAIKUNTHPUR
4 Panchayat - DATA ATTACHED
5 Wards Covered - GP and Ward data ATTACHED
6 Year of DB completion of original scheme - 2020 Remarks
sl. No. Description Unit Cost as per TS Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount 13
I. Fixed Costs per ward
(a) Cost of pump operator
1 nos for 365 days per month 1.00 4000.00 48000.00
Sub Total a= 48000.00
(b) Cost of energy charges
Capacity of motor pump say 3 HP=(.746x3.00= 2.24 kW) kW 2.24
Avg. running hrs,/day 6
Energy charges per year= avg. running hrs/dayx.746x3.00x365 per unit 6534.96 2.60 16990.896
fixed charges per month 12 100.00 3600.00
duty charges @6% of energy charge 1019.45
SubTotal b= 21610.35
No. of total wards 2 21610.35 43220.70
Total Fixed Cost (I) = 43,220.70
II. Variable Cost per ward
(a) Cost of chemical 0.539946 197.08029
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((200x5x81x2)/1000000)x100/3)x365 Kg/Year 197.08029 150.00 29562.04 2463.503625
Sub Total a= 29562.04
(b) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 1 5000.00 5000.00
Sub Total b= 5000.00
(c) Infrastructure Maintenance
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 5
Sub Total (Civil work)= 8071.12 9486.92 9486.92
Sub Total (elctro mech)= 2340.07 2986.59 2986.59
Sub Total c= 12473.52
Total Variable Cost II (a+b+c)= 47,035.56 195.9814951
No. of total wards 2 47,035.56 94,071.12
III Expenditure (Misc. item such as water quality test report i/c allied stationery 5% of (II)= 4,703.56
IV Contractor's profit @ 10% on (I) & (II)= 13,729.18
V Add GST @ 18% on (I) & II)= 24,712.53
VI Add labour cess @ 1% on (II)= 940.71 235.1777941
VII Add cost towards emergent, unforseen breakdowns @ 10% on (II)= 9,407.11 12297.01711
VIII Variable Operation and maintainence cost for 1 year (III+IV+V+VI+VII+VIII)= 147,564.21 397.4685517 4769.62262026878
IX Total Cost (I) & (II)= 190,784.90
X Total Operation and maintainence cost for 5 year including fixed and variable costs= 953,924.52
Executive Engineer
P.H. Division Gopalganj
Sub Estimate No.- 02
Estimate for Administrative Approval of Operation & maintenance of DIGHWA SOUTH Rural Piped water Supply Scheme for the period 2025-2030 Under P.H.Division, GOPALGANJ
1 Name of Division - GOPALGANJ
2 Name of Sub Division - BARAULI
3 Block - BAIKUNTHPUR
4 Panchayat - DIGHWA SOUTH
5 Wards Covered - 3,4,5,6,11,12,13
6 Year of DB completion of original scheme - 2018
Sl. No. Description Unit Cost as per TS'2012 Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount Remarks
(a) Cost of pump operator
1 nos for 365 days per month 1.00 4000.00 48000.00
Sub Total a= 48000.00
(b) Cost of energy charges
Capacity of motor pump say 17.50 HP=(.746x15=11.19 kW) kW 11.19
Avg. running hrs,/day 6
Energy charges per year= avg. running hrs/dayx.746x15x365 per unit 24506.1 9.72 238199.292 24506.1
fixed charges per month 12 630.00 7560.00
duty charges @6% of energy charge 14291.96
SubTotal b= 260051.24952
Total Fixed Cost (I) = 308,051.25
II. Variable Cost
(a) Cost of chemical
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((1600x5x81x2)/1000000)x100/3)x365 Kg/Year 315 150.00 47250.00 15.2534745 5567.5181925
Sub Total a= 47250.00
(b) Overhauling of IRP/ARP/FRP, core gravel, TIS media etc. 0 270000.00 0.00
Sub Total b= 0.00
(c) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 1 25000.00 25000.00
Sub Total c= 25000.00
(d) Infrastructure Maintenance
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 7
Sub Total (Civil work)= 48871.09 58342.38 58342.38
Sub Total (elctro mech)= 9872.50 13891.60 13891.60
Sub Total d= 72233.98
Total Variable Cost II= 144,483.98 12040.33144 1505.04143048938
III Expenditure (Misc. item such as water quality test report i/c allied stationery 5% of (II)= 7,224.20
IV Contractor's profit @ 10% on (I) & (II)= 45,253.52
V Add GST @ 18% on (I) & II)= 81,456.34
VI Add labour cess @ 1% on (II)= 4,525.35
VII Add cost towards emergent, unforseen breakdowns @ 10% on (II)= 14,448.40
VIII Variable Operation and maintainence cost for 1 year (III+IV+V+VI+VII+VIII)= 297,391.79
X Total Operation and maintainence cost for 5 year including fixed and variable costs= 3,027,215.20
Executive Engineer
P.H. Division Gopalganj
GOVERNMENT OF BIHAR
PUBLIC HEALTH ENGINEERING DEPARTMENT
Name of Work-Part I: Fixed Operation of Ward level piped water supply schemes (Quality affected/NQ affected) & PWS Schemes by deploying pump operators and payment of electricity charges and Part II: Variable Comprehensive maintenance of Ward level water supply schemes (Quality affected/NQ affected) & PWS Schemes, i/c the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of ESR and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new FHTCs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of Engineer-in-charge.
ESTIMATED COST- Rs.124,988,493.72
PUBLIC HEALTH DIVISION, DHAKA
PUBLIC HEALTH ENGINEERING DEPARTMENT P.H.DIVISION,ARA
P.H. DIVISION DHAKA
Name of Work-Part I: Fixed Operation of Ward level piped water supply schemes (Quality affected/NQ affected) & PWS Schemes by deploying pump operators and payment of electricity charges and Part II: Variable Comprehensive maintenance of Ward level water supply schemes (Quality affected/NQ affected) & PWS Schemes, i/c the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of ESR and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new FHTCs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of Engineer-in-charge.
This Estimate has been framed by Executive Engineer P.H. Division, Dhaka as per direction of department for O&M of PWS scheme whose five year O&M had been completed and required another five year O&M to meet the cost of above work. This estimate has been framed in order to ensure the continuous water supply through PWS scheme including comprehensive operation and maintainance with payment of electricity bill as per attached list during the period of five year Under P.H. Division, Dhaka.
1 PROVISIONS:- The following provision has been made in this estimate:-
1. Maintainance of distribution system
2. Provision of maintainance for payment of operator and electricity bill.
3. Maintainanace of civil structure
4. Maintainanace of electrical and mechanical item
5. Provision of maintanainace of FHTC and GI posts.
6. Providing O&M for 5 years.
The rates taken for preparation of this estimate is based on the present labour & materials rates as circulated by the BCD SoR'2022. the rates of pipes which were circulated by the dept. and had been prevailing since 2018; has been escalated by a factor of 15.06% as directed by the CPWD.
4 Estimated Project Cost: The Estimated Cost of this Project comes to Rs.124,988,493.72
on the basis of current Bihar SOR effictive from 01.01.22, Revised rate approved by PHED Headquarter and Prevailing Market rates for Non Schedule items including 1% Contingency.
5 work Completion Time FIVE YEAR
6 Specification: All relevant standard specification of PWD, PHED of Govt. of Bihar will be followed during the execution of work.
Junior Engineer Assistant Engineer Executive Engineer
P.H.Section, Belhar P.H.Sub-Division,Belhar P.H. DIVISION DHAKA
GOVERNMENT OF BIHAR
Public Health Engineering Department
ABSTRACT OF COST
Name of Work-Part I: Fixed Operation of Ward level piped water supply schemes (Quality affected/NQ affected) & PWS Schemes by deploying pump operators and payment of electricity charges and Part II: Variable Comprehensive maintenance of Ward level water supply schemes (Quality affected/NQ affected) & PWS Schemes, i/c the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of ESR and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in distribution line, repair and provision of new FHTCs, repair and maintenance of pumps and other electromechanical components etc. all complete as per the directions of Engineer-in-charge.
S.No. Description Quantity Unit Total Amount
1 Comprehensive Operation and Maintenance including repairs of Civil & Mechanical Structures, Energy Cost, Deployment of Manpower for various Ward Level Water Supply Schemes (Quality Affected) for the period of 5 years under P.H. Division, Hajipur for the year 2026-2027. (As per Abstract -01A) 1 Nos. Rs.45,005,493.72
3 Comprehensive Operation and Maintenance including repairs of Civil & Mechanical Structures, Energy Cost, Deployment of Manpower for various PWS for the period of 5 years under P.H. Division, Hajipur for the year 2026-2027. (As per Abstract 01B ) 1 Nos. ₹ 79,983,000.00
Executive Engineer
P.H.Division, Dhaka
Junior Engineer Assistant Engineer
GOVERNMENT OF BIHAR
Public Health Engineering Department
ABSTRACT OF COST (1A)
Estimate for the work:- O&M FOR NEXT FIVE YEAR AFTER COMPLETION OF FIVE YEAR O&M BY AGENCY OF WLS UNDER P.H. DIVISION DHAKA .
S.No. Description Quantity Unit Rate Total Amount
1 Cost of Operation and maintainance of All WLS Scheme in Dhaka Division for five year(as per Sub estimate -1) 1 Nos. Rs.45,005,493.72 Rs.45,005,493.72
Junior Engineer Assistant Engineer Executive Engineer
P.H.Division, Dhaka
Estimate for Administrative Approval of Operation & maintenance of 54 nos. of Ward level water supply schemes (Non Quality affected) for the period 2025-2030 in all Blocks Under P.H.Division, Dhaka.
1 Name of Division - Dhaka
2 Name of Sub Division - Chakia/Dhaka/Chauradano
3 Block - All Blocks of Dhaka Division
4 Panchayat - All Panchayats of Dhaka Division
5 Scheme Covered - 54
6 Year of DB completion of original scheme - 2020
sl. No. Description Unit Cost as per TS Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount Remarks
(a) Cost of pump operator
1 nos for 365 days per month 1.00 4000.00 48000.00
Sub Total A= 48000.00
(b) Cost of energy charges
Capacity of motor pump say 3 HP=(.746x3.00= 2.24 kW) kW 2.24
Avg. running hrs,/day 8
Energy charges per year= avg. running hrs/dayx.746x3.00x365x1.11 per unit 7253.8056 2.60 18859.89456
fixed charges per month 12 100.00 3600.00
duty charges @6% of energy charge 1131.59
SubTotal B= 23591.49
Total(A+B)= 71591.49
Total Fixed Cost (I) = 3,865,940.36
II. Variable Cost
(a) Cost of chemical
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((200x5x81x2)/1000000)x100/30)x365 Kg/Year 197.1 150.00 29565.00 0.539946 197.08029
Sub Total a= 29565.00 2463.75
(b) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 1 5000.00 5000.00
Sub Total b= 5000.00
Variable cost for 1 scheme 34565.00
No of Total Schemes= 54 34565.00 1866510.00
Variable Cost(I) 1866510.00
(c) Infrastructure Maintenance
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 7.5
Sub Total (elctro mech)= 126364.05 182197.86 182197.86
Sub Total c= 834318.82
Variable Cost II = 834,318.82
Water Quality Test Report(54 source*2 times/year *@ Rs 350)III 37,800.00 78.75
Variable Cost (I+ II+III) = 2,738,628.82
IIA Annual Rate of inflation for Manufactured product (2.92%*2.5 yr* variable cost)=(7.3% per year *variable cost (I+II+III)) 199,919.90
Total Variable Cost (Variable cost (I+II+III)+Inflation rate) 2,938,548.72
Total Cost (total Fixed Cost + Total variable cost) = 6,804,489.09
III Contractor's profit @ 10% on Total cost= 680,448.91
IV Add GST @ 18% onTotal Cost= 1,224,808.04
V Add labour cess @ 1% on (Total cost- Electricty charge)= 55,305.49
VI Add cost towards emergent, unforseen breakdowns @ 5 % on Total Variable cost= 146,927.44 3673.185903 222,800.00
VII Operation and maintainence cost for 1 year (CP+GST+LC+Emergent cost)= 2,107,489.87 175624.1556
IX Total Operation and maintainence cost for 1 year = 8,911,978.95
Contingency( 1% of total cost for 1 year) 89,119.79
XI Final operation and maintainence cost for 1 year (Total O&m Cost for 1 year+ Contingency)= 9,001,098.74
Final operation and maintainence cost for 5 year= 45,005,493.72
Executive Engineer
P.H. Division Dhaka
GOVERNMENT OF BIHAR
Public Health Engineering Department
ABSTRACT OF COST (1B)
Estimate for the work:- O&M FOR NEXT FIVE YEAR AFTER COMPLETION OF FIVE YEAR O&M BY AGENCY OF PWS UNDER P.H. DIVISION DHAKA .
S.No. Description Quantity Unit Rate Total Amount O&M Completed on
1 Cost of Operation and maintainance of PWS Scheme in Panchayat-Tetariya,Ward-1 & 6,Block-Tetariya for five year(as per Sub estimate -1) 1 Nos. Rs.5,491,700.00 Rs.5,491,700.00 04-19-25
2 Cost of Operation and maintainance of PWS Scheme in Panchayat-Narha Panapur,Ward-2,3,4,5&8,Block-Tetariya for five year(as per Sub estimate -1) 1 Nos. Rs.5,197,800.00 Rs.5,197,800.00 04-13-25
3 Cost of Operation and maintainance of PWS Scheme in Panchayat-Patahi,Ward-2,3,4,5,6&7,Block-Patahi for five year(as per Sub estimate -3) 1 Nos. Rs.7,383,700.00 Rs.7,383,700.00 10-14-26
4 Cost of Operation and maintainance of PWS Scheme in Panchayat-Fenhara,Ward-1,2,3,5,6,7,8,9,10,11,12,13&14,Block-Fenhara for five year(as per Sub estimate -4) 1 Nos. Rs.9,129,300.00 Rs.9,129,300.00 03-15-25
5 Cost of Operation and maintainance of PWS Scheme in Panchayat-Madhuban North,Ward-1,2,3,4,5,6,7,8,Block-Madhuban for five year(as per Sub estimate -5) 1 Nos. Rs.8,816,700.00 Rs.8,816,700.00 03-24-26
6 Cost of Operation and maintainance of PWS Scheme in Panchayat-Bankatwa,Ward-1,2,3,4,5,7,Block-Bankatwa for five year(as per Sub estimate -6) 1 Nos. Rs.5,951,400.00 Rs.5,951,400.00 03-24-26
7 Cost of Operation and maintainance of PWS Scheme in Panchayat-Phulwariya,Ward-8,9,10,11&12,Block-Dhaka for five year(as per Sub estimate -7) 1 Nos. Rs.6,890,900.00 Rs.6,890,900.00 05-07-26
8 Cost of Operation and maintainance of PWS Scheme in Panchayat-Narkatiya,Ward-5&8,Block-Chhauradano for five year(as per Sub estimate -8) 1 Nos. Rs.4,368,900.00 Rs.4,368,900.00 07-28-25
9 Cost of Operation and maintainance of PWS Scheme in Panchayat-Ghorasahan South & North,Ward-1,4,5,11,14 & 1,2,5,6,8,Block-Ghorasahan for five year(as per Sub estimate -9) 1 Nos. Rs.8,242,200.00 Rs.8,242,200.00 07-22-25
10 Cost of Operation and maintainance of PWS Scheme in Panchayat-Ekdari & Bhelwa,Ward-1,2,3,4,5,6 & 8,9,11,14,Block-Chhauradano for five year(as per Sub estimate -10) 1 Nos. Rs.6,904,100.00 Rs.6,904,100.00 11-20-25
11 Cost of Operation and maintainance of PWS Scheme in Panchayat-Rajepur,Ward-3,4&5,Block-Mehsi for five year(as per Sub estimate -11) 1 Nos. Rs.5,990,800.00 Rs.5,990,800.00 07-11-25
12 Cost of Operation and maintainance of PWS Scheme in Panchayat-Mishrauliya & Khartari East,Ward-10,11& 01,Block-Chiraiya for five year(as per Sub estimate -12) 1 Nos. Rs.5,615,500.00 Rs.5,615,500.00 05-01-25
Junior Engineer Assistant Engineer Executive Engineer
P.H.Division, Dhaka
Sub Estimate No.- 01
Estimate for Administrative Approval of Operation & maintenance of TETARIYA Piped water Supply Scheme for the period 2025-2030 Under P.H.Division, DHAKA
1 Name of Division - DHAKA
2 Name of Sub Division - CHAKIA
3 Block - TETARIYA
4 Panchayat - TETARIYA
5 Wards Covered - 1&6
6 Year of DB completion of original scheme - 2010
Sl. No. Description Unit Cost as per TS'2012 Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount Remarks
(a) Cost of pump operator
1 nos for 365 days per month 1.00 4000.00 48000.00 11.19
Sub Total a= 48000.00
(b) Cost of energy charges
Capacity of motor pump say 15HP=(.746x15= 11.19kW) kW 11.19
Avg. running hrs,/day 10
Energy charges per year= avg. running hrs/dayx.746x15x365x1.11 per unit 45336.285 9.72 440668.6902 24506.1 50323.27635
fixed charges per month 12 630.00 84596.40
duty charges @6% of energy charge 26440.12
SubTotal b= 551705.2116
Total Fixed Cost (I) = 599,705.21
II. Variable Cost
(a) Cost of chemical
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((500x5x81x2)/1000000)x100/30)x365 Kg/Year 492.75 150.00 73912.50 15.2534745 5567.5181925
Sub Total a= 73912.50
(b) Overhauling of IRP/ARP/FRP, core gravel, TIS media etc. 0 270000.00 0.00
Sub Total b= 0.00
(c) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 1 25000.00 25000.00
Sub Total c= 25000.00
Variable Cost ( I) = 98912.50
(d) Infrastructure Maintenance
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 17.5
Sub Total (Civil work)= 69412.60 99311.46 99311.46
Sub Total (elctro mech)= 9872.50 23186.75 23186.75
Sub Total d= 122498.21
Total Variable Cost II= 122,498.21 10208.18381 1276.02297587504
Water Quality Test Report(1 source*2 times/year *@ Rs 350)III 700.00
Variable Cost (I+ II+III) = 222,110.71
Annual Rate of inflation for Manufactured product (2.92%*2.5 yr* variable cost)=(7.3% per year *variable cost (I+II+III)) 16,214.08
Total Variable Cost (Variable cost (I+II+III)+Inflation rate) 238,324.79
Total Cost (total Fixed Cost + Total variable cost) = 838,030.00
III Contractor's profit @ 10% on (I) & (II)= 83,803.00
IV Add GST @ 18% onTotal Cost= 150,845.40
V Add labour cess @ 1% on (Total cost- Electricty charge)= 2,863.25
VI Add cost towards emergent, unforseen breakdowns @ 5 % on Total Variable cost= 11,916.24
VII Operation and maintainence cost for 1 year (CP+GST+LC+Emergent cost)= 249,427.89
VIII Total Operation and maintainence cost for 1 year = 1,087,457.89
Contingency( 1% of total cost for 1 year) 10,874.58
IX Final operation and maintainence cost for 1 year (Total O&m Cost for 1 year+ Contingency )= 1,098,332.46 91527.70538 137291.558070879
XII Final operation and maintainence cost for 5 year= 5,491,662.32
Executive Engineer
P.H. Division Dhaka
Sub Estimate No.- 02
Estimate for Administrative Approval of Operation & maintenance of NARHA PANAPUR Piped water Supply Scheme for the period 2025-2030 Under P.H.Division, DHAKA
1 Name of Division - DHAKA
2 Name of Sub Division - CHAKIA
3 Block - TETARIYA
4 Panchayat - NARHAPANAPUR
5 Wards Covered - 2,3,4,5&8
6 Year of DB completion of original scheme - 2010
Sl. No. Description Unit Cost as per TS'2012 Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount Remarks
(a) Cost of pump operator
1 nos for 365 days per month 1.00 4000.00 48000.00
Sub Total a= 48000.00
(b) Cost of energy charges
Capacity of motor pump say 12.50 HP=(.746x12.5= 9.325 kW) kW 9.325
Avg. running hrs,/day 10
Energy charges per year= avg. running hrs/dayx.746x12.5x365 per unit 37780.2375 9.72 367223.9085 20421.75
fixed charges per month 12 630.00 70497.00
duty charges @6% of energy charge 22033.43
SubTotal b= 459754.34301
Total Fixed Cost (I) = 507,754.34
II. Variable Cost
(a) Cost of chemical
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((1000x5x81x2)/1000000)x100/30)x365 Kg/Year 985.5 150.00 147825.00 15.2534745 5567.5181925
Sub Total a= 147825.00
(b) Overhauling of IRP/ARP/FRP, core gravel, TIS media etc. 0 270000.00 0.00
Sub Total b= 0.00 p
(c) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 1 25000.00 25000.00
Sub Total c= 25000.00
Variable cost (I)= 172825.00
(d) Infrastructure Maintenance
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 17.5
Sub Total (Civil work)= 48181.84 67986.21 67986.21
Sub Total (elctro mech)= 9360.00 21983.08 21983.08
Sub Total d= 89969.29
Total Variable Cost II= 89,969.29 7497.440618 937.180077280271
Water Quality Test Report(1 source*2 times/year *@ Rs 350)III 700.00
Variable Cost (I+ II+III) = 263,494.29
Annual Rate of inflation for Manufactured product (2.92%*2.5 yr* variable cost)=(7.3% per year *variable cost (I+II+III)) 19,235.08
Total Variable Cost (Variable cost (I+II+III)+Inflation rate) 282,729.37
Total Cost (total Fixed Cost + Total variable cost) = 790,483.71
III Contractor's profit @ 10% on (I) & (II)= 79,048.37
IV Add GST @ 18% onTotal Cost= 142,287.07
V Add labour cess @ 1% on (Total cost- Electricty charge)= 3,307.29
VI Add cost towards emergent, unforseen breakdowns @ 5 % on Total Variable cost= 14,136.47
VII Operation and maintainence cost for 1 year (CP+GST+LC+Emergent cost)= 238,779.20
VIII Total Operation and maintainence cost for 1 year = 1,029,262.92
Contingency( 1% of total cost for 1 year) 10,292.63
IX Final operation and maintainence cost for 1 year (Total O&m Cost for 1 year+ Contingency )= 1,039,555.54
XII Final operation and maintainence cost for 5 year= 5,197,777.72
Executive Engineer
P.H. Division Dhaka
Sub Estimate No.- 03
Estimate for Administrative Approval of Operation & maintenance of PATAHI Piped water Supply Scheme for the period 2025-2030 Under P.H.Division, DHAKA
1 Name of Division - DHAKA
2 Name of Sub Division - DHAKA
3 Block - PATAHI
4 Panchayat - PATAHI
5 Wards Covered - 2,3,4,5,6&7
6 Year of DB completion of original scheme - 2010
Sl. No. Description Unit Cost as per TS'2012 Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount Remarks
(a) Cost of pump operator
1 nos for 365 days per month 1.00 4000.00 48000.00
Sub Total a= 48000.00
(b) Cost of energy charges
Capacity of motor pump say 20HP=(.746x20= 14.92 kW) kW 14.92
Avg. running hrs,/day 10
Energy charges per year= avg. running hrs/dayx.746x20x365x1.11 per unit 60448.38 9.72 587558.2536 32674.8
fixed charges per month 12 630.00 112795.20
duty charges @6% of energy charge 35253.50
SubTotal b= 735606.9488
Total Fixed Cost (I) = 783,606.95
II. Variable Cost
(a) Cost of chemical
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((1200x5x81x2)/1000000)x100/30)x365 Kg/Year 1182.6 150.00 177390.00 15.2534745 5567.5181925
Sub Total a= 177390.00
(b) Overhauling of IRP/ARP/FRP, core gravel, TIS media etc. 0 270000.00 0.00
Sub Total b= 0.00
(c) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 1 25000.00 25000.00
Sub Total c= 25000.00
Variable cost (I)= 202390.00
(d) Infrastructure Maintenance
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 17.5
Sub Total (Civil work)= 70335.92 101113.76 101113.76
Sub Total (elctro mech)= 6285.40 14762.02 14762.02
Sub Total d= 115875.78
Total Variable Cost II= 115,875.78 9656.314862 1207.03935780957
Water Quality Test Report(1 source*2 times/year *@ Rs 350)III 700.00
Variable Cost (I+ II+III) = 318,965.78
Annual Rate of inflation for Manufactured product (2.92%*2.5 yr* variable cost)=(7.3% per year *variable cost (I+II+III)) 23,284.50
Total Variable Cost (Variable cost (I+II+III)+Inflation rate) 342,250.28
Total Cost (total Fixed Cost + Total variable cost) = 1,125,857.23
III Contractor's profit @ 10% on (I) & (II)= 112,585.72
V Add labour cess @ 1% on (Total cost- Electricty charge)= 3,902.50
VI Add cost towards emergent, unforseen breakdowns @ 5 % on Total Variable cost= 17,112.51
VII Operation and maintainence cost for 1 year (CP+GST+LC+Emergent cost)= 336,255.04
VIII Total Operation and maintainence cost for 1 year = 1,462,112.27
Contingency( 1% of total cost for 1 year) 14,621.12
IX Final operation and maintainence cost for 1 year (Total O&m Cost for 1 year+ Contingency )= 1,476,733.39
XII Final operation and maintainence cost for 5 year= 7,383,666.96
Executive Engineer
P.H. Division Dhaka
Sub Estimate No.- 04
Estimate for Administrative Approval of Operation & maintenance of FENHARA Piped water Supply Scheme for the period 2025-2030 Under P.H.Division, DHAKA
1 Name of Division - DHAKA
2 Name of Sub Division - DHAKA
3 Block - FENHARA
4 Panchayat - FENHARA
6 Year of DB completion of original scheme - 2011
Sl. No. Description Unit Cost as per TS'2012 Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount Remarks
(a) Cost of pump operator
1 nos for 365 days per month 1.00 4000.00 48000.00
Sub Total a= 48000.00
(b) Cost of energy charges
Capacity of motor pump say 20HP=(.746x20= 14.92 kW) kW 14.92
Avg. running hrs,/day 10
Energy charges per year= avg. running hrs/dayx.746x20x365x1.11 per unit 60448.38 9.72 587558.2536 32674.8
fixed charges per month 12 630.00 112795.20
duty charges @6% of energy charge 35253.50
SubTotal b= 735606.9488
Total Fixed Cost (I) = 783,606.95
II. Variable Cost
(a) Cost of chemical
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((2600x5x81x2)/1000000)x100/30)x365 Kg/Year 2562.3 150.00 384345.00 15.2534745 5567.5181925
Sub Total a= 384345.00
(b) Overhauling of IRP/ARP/FRP, core gravel, TIS media etc. 0 270000.00 0.00
Sub Total b= 0.00
(c) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 1 25000.00 25000.00
Sub Total c= 25000.00
Variable cost (I)= 409345.00
(d) Infrastructure Maintenance
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 16.5
Sub Total (Civil work)= 87802.19 125512.74 125512.74
Sub Total (elctro mech)= 10648.60 23818.58 23818.58
Sub Total d= 149331.33
Total Variable Cost II= 149,331.33 12444.27723 1555.53465330773
Water Quality Test Report(1 source*2 times/year *@ Rs 350)III 700.00
Variable Cost (I+ II+III) = 559,376.33
Annual Rate of inflation for Manufactured product (2.92%*2.5 yr* variable cost)=(7.3% per year *variable cost (I+II+III)) 40,834.47
Total Variable Cost (Variable cost (I+II+III)+Inflation rate) 600,210.80
Total Cost (total Fixed Cost + Total variable cost) = 1,383,817.75
III Contractor's profit @ 10% on (I) & (II)= 138,381.77
V Add labour cess @ 1% on (Total cost- Electricty charge)= 6,482.11
VI Add cost towards emergent, unforseen breakdowns @ 5 % on Total Variable cost= 30,010.54
VII Operation and maintainence cost for 1 year (CP+GST+LC+Emergent cost)= 423,961.62
VIII Total Operation and maintainence cost for 1 year = 1,807,779.36
Contingency( 1% of total cost for 1 year) 18,077.79
IX Final operation and maintainence cost for 1 year (Total O&m Cost for 1 year+ Contingency )= 1,825,857.16
XII Final operation and maintainence cost for 5 year= 9,129,285.79
Executive Engineer
P.H. Division Dhaka
Sub Estimate No.- 05
Estimate for Administrative Approval of Operation & maintenance of MADHUBAN Piped water Supply Scheme for the period 2025-2030 Under P.H.Division, DHAKA
1 Name of Division - DHAKA
2 Name of Sub Division - CHAKIA
3 Block - MADHUBAN
4 Panchayat - MADHUBAN NORTH
5 Wards Covered - 1,2,3,4,5,6,7,8
6 Year of DB completion of original scheme - 2010
Sl. No. Description Unit Cost as per TS'2012 Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount Remarks
(a) Cost of pump operator
1 nos for 365 days per month 1.00 4000.00 48000.00
Sub Total a= 48000.00
(b) Cost of energy charges
Capacity of motor pump say 22.5HP=(.746x22.5= 16.785 kW) kW 16.785
Avg. running hrs,/day 10
Energy charges per year= avg. running hrs/dayx.746x22.5x365x1.11 per unit 68004.4275 9.72 661003.0353 36759.15
fixed charges per month 12 630.00 126894.60
duty charges @6% of energy charge 39660.18
SubTotal b= 827557.8174
Total Fixed Cost (I) = 875,557.82
II. Variable Cost
(a) Cost of chemical
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((1600x5x81x2)/1000000)x100/30)x365 Kg/Year 1576.8 150.00 236520.00 15.2534745 5567.5181925
Sub Total a= 236520.00
(b) Overhauling of IRP/ARP/FRP, core gravel, TIS media etc. 0 270000.00 0.00
Sub Total b= 0.00
(c) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 1 25000.00 25000.00
Sub Total c= 25000.00
Variable cost (I)= 261520.00
(d) Infrastructure Maintenance
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 17.5
Sub Total (Civil work)= 100171.60 144718.69 144718.69
Sub Total (elctro mech)= 11722.50 27531.70 27531.70
Sub Total d= 172250.39
Total Variable Cost II= 172,250.39 14354.1988 1794.27484989891
Water Quality Test Report(1 source*2 times/year *@ Rs 350)III 700.00
Variable Cost (I+ II+III) = 434,470.39
Annual Rate of inflation for Manufactured product (2.92%*2.5 yr* variable cost)=(7.3% per year *variable cost (I+II+III)) 31,716.34
Total Variable Cost (Variable cost (I+II+III)+Inflation rate) 466,186.72
Total Cost (total Fixed Cost + Total variable cost) = 1,341,744.54
III Contractor's profit @ 10% on (I) & (II)= 134,174.45
V Add labour cess @ 1% on (Total cost- Electricty charge)= 5,141.87
VI Add cost towards emergent, unforseen breakdowns @ 5 % on Total Variable cost= 23,309.34
VII Operation and maintainence cost for 1 year (CP+GST+LC+Emergent cost)= 404,139.67
VIII Total Operation and maintainence cost for 1 year = 1,745,884.22
Contingency( 1% of total cost for 1 year) 17,458.84
IX Final operation and maintainence cost for 1 year (Total O&m Cost for 1 year+ Contingency )= 1,763,343.06
XII Final operation and maintainence cost for 5 year= 8,816,715.29
Executive Engineer
P.H. Division Dhaka
Sub Estimate No.- 06
Estimate for Administrative Approval of Operation & maintenance of BANKATWA Piped water Supply Scheme for the period 2025-2030 Under P.H.Division, DHAKA
1 Name of Division - DHAKA
2 Name of Sub Division - CHAURADANO
3 Block - BANKATWA
4 Panchayat - BANKATWA
5 Wards Covered - 1,2,3,4,5,7
6 Year of DB completion of original scheme - 2012
Sl. No. Description Unit Cost as per TS'2012 Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount Remarks
(a) Cost of pump operator
1 nos for 365 days per month 1.00 4000.00 48000.00
Sub Total a= 48000.00
(b) Cost of energy charges
Capacity of motor pump say 15HP=(.746x15= 11.19 kW) kW 11.19
Avg. running hrs,/day 10
Energy charges per year= avg. running hrs/dayx.746x15x365x1.11 per unit 45336.285 9.72 440668.6902 24506.1
fixed charges per month 12 630.00 84596.40
duty charges @6% of energy charge 26440.12
SubTotal b= 551705.2116
Total Fixed Cost (I) = 599,705.21
II. Variable Cost
(a) Cost of chemical
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((1200x5x81x2)/1000000)x100/30)x365 Kg/Year 1182.6 150.00 177390.00 15.2534745 5567.5181925
Sub Total a= 177390.00
(b) Overhauling of IRP/ARP/FRP, core gravel, TIS media etc. 0 270000.00 0.00
Sub Total b= 0.00
(c) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 1 25000.00 25000.00
Sub Total c= 25000.00
Variable cost (I)= 202390.00
(d) Infrastructure Maintenance
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 15.5
Approach Road per year 0.00 0.00 0.00 3.00% 3.00 0.00 0.00 0.00
Sub Total (Civil work)= 51300.74 70550.06 70550.06
Sub Total (elctro mech)= 5531.95 11784.53 11784.53
Sub Total d= 82334.59
Total Variable Cost II= 82,334.59 6861.216129 857.652016184902
Water Quality Test Report(1 source*2 times/year *@ Rs 350)III 700.00
Variable Cost (I+ II+III) = 285,424.59
Annual Rate of inflation for Manufactured product (2.92%*2.5 yr* variable cost)=(7.3% per year *variable cost (I+II+III)) 20,836.00
Total Variable Cost (Variable cost (I+II+III)+Inflation rate) 306,260.59
Total Cost (total Fixed Cost + Total variable cost) = 905,965.80
III Contractor's profit @ 10% on (I) & (II)= 90,596.58
V Add labour cess @ 1% on (Total cost- Electricty charge)= 3,542.61
VI Add cost towards emergent, unforseen breakdowns @ 5 % on Total Variable cost= 15,313.03
VII Operation and maintainence cost for 1 year (CP+GST+LC+Emergent cost)= 272,526.06
VIII Total Operation and maintainence cost for 1 year = 1,178,491.86
Contingency( 1% of total cost for 1 year) 11,784.92
IX Final operation and maintainence cost for 1 year (Total O&m Cost for 1 year+ Contingency )= 1,190,276.78
XII Final operation and maintainence cost for 5 year= 5,951,383.89
Executive Engineer
P.H. Division Dhaka
Sub Estimate No.- 07
Estimate for Administrative Approval of Operation & maintenance of BANKATWA Piped water Supply Scheme for the period 2025-2030 Under P.H.Division, DHAKA
1 Name of Division - DHAKA
2 Name of Sub Division - DHAKA
3 Block - DHAKA
4 Panchayat - PHULWARIYA
5 Wards Covered - 8,9,10,11&12
6 Year of DB completion of original scheme - 2011
Sl. No. Description Unit Cost as per TS'2012 Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount Remarks
(a) Cost of pump operator
1 nos for 365 days per month 1.00 4000.00 48000.00
Sub Total a= 48000.00
(b) Cost of energy charges
Capacity of motor pump say 20HP=(.746x20= 14.92 kW) kW 14.92
Avg. running hrs,/day 10
Energy charges per year= avg. running hrs/dayx.746x20x365x1.11 per unit 60448.38 9.72 587558.2536 32674.8
fixed charges per month 12 630.00 112795.20
duty charges @6% of energy charge 35253.50
SubTotal b= 735606.9488
Total Fixed Cost (I) = 783,606.95
II. Variable Cost
(a) Cost of chemical
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((1000x5x81x2)/1000000)x100/30)x365 Kg/Year 985.5 150.00 147825.00 15.2534745 5567.5181925
Sub Total a= 147825.00
(b) Overhauling of IRP/ARP/FRP, core gravel, TIS media etc. 0 270000.00 0.00
Sub Total b= 0.00
(c) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 1 25000.00 25000.00
Sub Total c= 25000.00
Variable cost (I)= 172825.00
(d) Infrastructure Maintenance
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 16.5
Boundary Wall per year 0.00 0.00 0.00 1.00% 2.00 0.00 0.00 0.00
Approach Road per year 0.00 0.00 0.00 3.00% 3.00 0.00 0.00 0.00
Sub Total (Civil work)= 44479.92 63228.42 63228.42
Sub Total (elctro mech)= 6416.95 14353.31 14353.31
Sub Total d= 77581.73
Total Variable Cost II= 77,581.73 6465.14394 808.142992520662
Water Quality Test Report(1 source*2 times/year *@ Rs 350)III 700.00
Variable Cost (I+ II+III) = 251,106.73
Annual Rate of inflation for Manufactured product (2.92%*2.5 yr* variable cost)=(7.3% per year *variable cost (I+II+III)) 18,330.79
Total Variable Cost (Variable cost (I+II+III)+Inflation rate) 269,437.52
Total Cost (total Fixed Cost + Total variable cost) = 1,053,044.47
III Contractor's profit @ 10% on (I) & (II)= 105,304.45
V Add labour cess @ 1% on (Total cost- Electricty charge)= 3,174.38
VI Add cost towards emergent, unforseen breakdowns @ 5 % on Total Variable cost= 13,471.88
VII Operation and maintainence cost for 1 year (CP+GST+LC+Emergent cost)= 311,498.70
VIII Total Operation and maintainence cost for 1 year = 1,364,543.17
Contingency( 1% of total cost for 1 year) 13,645.43
IX Final operation and maintainence cost for 1 year (Total O&m Cost for 1 year+ Contingency )= 1,378,188.60
XII Final operation and maintainence cost for 5 year= 6,890,943.00
Executive Engineer
P.H. Division Dhaka
Sub Estimate No.- 08
Estimate for Administrative Approval of Operation & maintenance of NARKATIYA Piped water Supply Scheme for the period 2025-2030 Under P.H.Division, DHAKA
1 Name of Division - DHAKA
2 Name of Sub Division - CHAURADANO
3 Block - CHAURADANO
4 Panchayat - NARKATIYA
5 Wards Covered - 5&8
6 Year of DB completion of original scheme - 2012
Sl. No. Description Unit Cost as per TS'2012 Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount Remarks
(a) Cost of pump operator
1 nos for 365 days per month 1.00 4000.00 48000.00
Sub Total a= 48000.00
(b) Cost of energy charges
Capacity of motor pump say 12.5HP=(.746x12.5= 9.325 kW) kW 9.325
Avg. running hrs,/day 10
Energy charges per year= avg. running hrs/dayx.746x12.5x365x1.11 per unit 37780.2375 9.72 367223.9085 20421.75
fixed charges per month 12 630.00 70497.00
duty charges @6% of energy charge 22033.43
SubTotal b= 459754.34301
Total Fixed Cost (I) = 507,754.34
II. Variable Cost
(a) Cost of chemical
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((400x5x81x2)/1000000)x100/30)x365 Kg/Year 394.2 150.00 59130.00 15.2534745 5567.5181925
Sub Total a= 59130.00
(b) Overhauling of IRP/ARP/FRP, core gravel, TIS media etc. 0 270000.00 0.00
Sub Total b= 0.00
(c) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 1 25000.00 25000.00
Sub Total c= 25000.00
Variable cost (I)= 84130.00
(d) Infrastructure Maintenance
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 15.5
Boundary Wall per year 0.00 0.00 0.00 1.00% 2.00 0.00 0.00 0.00
Approach Road per year 0.00 0.00 0.00 3.00% 3.00 0.00 0.00 0.00
Sub Total (Civil work)= 31848.90 44596.42 44596.42
Sub Total (elctro mech)= 9350.00 19918.00 19918.00
Sub Total d= 64514.42
Total Variable Cost II= 64,514.42 5376.201612 672.025201517141
Water Quality Test Report(1 source*2 times/year *@ Rs 350)III 700.00
Variable Cost (I+ II+III) = 149,344.42
Annual Rate of inflation for Manufactured product (2.92%*2.5 yr* variable cost)=(7.3% per year *variable cost (I+II+III)) 10,902.14
Total Variable Cost (Variable cost (I+II+III)+Inflation rate) 160,246.56
Total Cost (total Fixed Cost + Total variable cost) = 668,000.90
III Contractor's profit @ 10% on (I) & (II)= 66,800.09
V Add labour cess @ 1% on (Total cost- Electricty charge)= 2,082.47
VI Add cost towards emergent, unforseen breakdowns @ 5 % on Total Variable cost= 8,012.33
VII Operation and maintainence cost for 1 year (CP+GST+LC+Emergent cost)= 197,135.05
VIII Total Operation and maintainence cost for 1 year = 865,135.95
Contingency( 1% of total cost for 1 year) 8,651.36
IX Final operation and maintainence cost for 1 year (Total O&m Cost for 1 year+ Contingency )= 873,787.31
XII Final operation and maintainence cost for 5 year= 4,368,936.56
Executive Engineer
P.H. Division Dhaka
Sub Estimate No.- 09
Estimate for Administrative Approval of Operation & maintenance of GHORASAHAN PHASE 1 Piped water Supply Scheme for the period 2025-2030 Under P.H.Division, DHAKA
1 Name of Division - DHAKA
2 Name of Sub Division - CHAURADANO
3 Block - GHORASAHAN
4 Panchayat - GHORASAHAN SOUTH AND NORTH
6 Year of DB completion of original scheme - 2013
Sl. No. Description Unit Cost as per TS'2012 Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount Remarks
(a) Cost of pump operator
1 nos for 365 days per month 1.00 4000.00 48000.00
Sub Total a= 48000.00
(b) Cost of energy charges
Capacity of motor pump say 20HP=(.746x20= 14.92 kW) kW 14.92
Avg. running hrs,/day 10
Energy charges per year= avg. running hrs/dayx.746x20x365x1.11 per unit 60448.38 9.72 587558.2536 32674.8
fixed charges per month 12 630.00 112795.20
duty charges @6% of energy charge 35253.50 14.92
SubTotal b= 735606.9488
Total Fixed Cost (I) = 783,606.95
II. Variable Cost
(a) Cost of chemical
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((2000x5x81x2)/1000000)x100/30)x365 Kg/Year 1971 150.00 295650.00 15.2534745 5567.5181925
Sub Total a= 295650.00
(b) Overhauling of IRP/ARP/FRP, core gravel, TIS media etc. 0 270000.00 0.00
Sub Total b= 0.00
(c) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 1 25000.00 25000.00
Sub Total c= 25000.00
Variable cost (I)= 320650.00
(d) Infrastructure Maintenance
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 14.5
Sub Total (Civil work)= 73508.99 102832.03 102832.03
Sub Total (elctro mech)= 6416.95 13018.88 13018.88
Sub Total d= 115850.90
Total Variable Cost II= 115,850.90 9654.241947 1206.78024338519
Water Quality Test Report(1 source*2 times/year *@ Rs 350)III 700.00
Variable Cost (I+ II+III) = 437,200.90
Annual Rate of inflation for Manufactured product (2.92%*2.5 yr* variable cost)=(7.3% per year *variable cost (I+II+III)) 31,915.67
Total Variable Cost (Variable cost (I+II+III)+Inflation rate) 469,116.57
Total Cost (total Fixed Cost + Total variable cost) = 1,252,723.52
III Contractor's profit @ 10% on (I) & (II)= 125,272.35
V Add labour cess @ 1% on (Total cost- Electricty charge)= 5,171.17
VI Add cost towards emergent, unforseen breakdowns @ 5 % on Total Variable cost= 23,455.83
VII Operation and maintainence cost for 1 year (CP+GST+LC+Emergent cost)= 379,389.58
VIII Total Operation and maintainence cost for 1 year = 1,632,113.10
Contingency( 1% of total cost for 1 year) 16,321.13
IX Final operation and maintainence cost for 1 year (Total O&m Cost for 1 year+ Contingency )= 1,648,434.23
XII Final operation and maintainence cost for 5 year= 8,242,171.14
Executive Engineer
P.H. Division Dhaka
Sub Estimate No.- 10
Estimate for Administrative Approval of Operation & maintenance of CHHAURADANO Piped water Supply Scheme for the period 2025-2030 Under P.H.Division, DHAKA
1 Name of Division - DHAKA
2 Name of Sub Division - CHHAURADANO
3 Block - CHHAURADANO
4 Panchayat - EKDARI & BHELWA
6 Year of DB completion of original scheme - 2013
Sl. No. Description Unit Cost as per TS'2012 Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount Remarks
(a) Cost of pump operator
1 nos for 365 days per month 1.00 4000.00 48000.00
Sub Total a= 48000.00
(b) Cost of energy charges
Capacity of motor pump say 15HP=(.746x15= 11.19 kW) kW 11.19 11.19
Avg. running hrs,/day 10
Energy charges per year= avg. running hrs/dayx.746x15x365x1.11 per unit 45336.285 9.72 440668.6902 24506.1
fixed charges per month 12 630.00 84596.40
duty charges @6% of energy charge 26440.12 14.92
SubTotal b= 551705.2116
Total Fixed Cost (I) = 599,705.21
II. Variable Cost
(a) Cost of chemical
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((2000x5x81x2)/1000000)x100/30)x365 Kg/Year 1971 150.00 295650.00 15.2534745 5567.5181925
Sub Total a= 295650.00
(b) Overhauling of IRP/ARP/FRP, core gravel, TIS media etc. 0 270000.00 0.00
Sub Total b= 0.00
(c) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 1 25000.00 25000.00
Sub Total c= 25000.00
Variable cost (I)= 320650.00
(d) Infrastructure Maintenance
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 14.5
Sub Total (Civil work)= 51497.16 71419.79 71419.79
Sub Total (elctro mech)= 11764.30 23867.72 23867.72
Sub Total d= 95287.51
Total Variable Cost II= 95,287.51 7940.625869 992.578233596987
Water Quality Test Report(1 source*2 times/year *@ Rs 350)III 700.00
Variable Cost (I+ II+III) = 416,637.51
Annual Rate of inflation for Manufactured product (2.92%*2.5 yr* variable cost)=(7.3% per year *variable cost (I+II+III)) 30,414.54
Total Variable Cost (Variable cost (I+II+III)+Inflation rate) 447,052.05
Total Cost (total Fixed Cost + Total variable cost) = 1,046,757.26
III Contractor's profit @ 10% on (I) & (II)= 104,675.73
V Add labour cess @ 1% on (Total cost- Electricty charge)= 4,950.52
VI Add cost towards emergent, unforseen breakdowns @ 5 % on Total Variable cost= 22,352.60
VII Operation and maintainence cost for 1 year (CP+GST+LC+Emergent cost)= 320,395.16
VIII Total Operation and maintainence cost for 1 year = 1,367,152.42
Contingency( 1% of total cost for 1 year) 13,671.52
IX Final operation and maintainence cost for 1 year (Total O&m Cost for 1 year+ Contingency )= 1,380,823.94
XII Final operation and maintainence cost for 5 year= 6,904,119.70
Executive Engineer
P.H. Division Dhaka
Sub Estimate No.- 11
Estimate for Administrative Approval of Operation & maintenance of RAJEPUR Piped water Supply Scheme for the period 2025-2030 Under P.H.Division, DHAKA
1 Name of Division - DHAKA
2 Name of Sub Division - CHAKIA
3 Block - MEHSI
4 Panchayat - RAJEPUR
5 Wards Covered - 3,4&5
6 Year of DB completion of original scheme - 2013
Sl. No. Description Unit Cost as per TS'2012 Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount Remarks
(a) Cost of pump operator
1 nos for 365 days per month 1.00 4000.00 48000.00
Sub Total a= 48000.00
(b) Cost of energy charges
Capacity of motor pump say 17.5HP=(.746x17.5= 13.055 kW) kW 13.055 13.055 11.19
Avg. running hrs,/day 10
Energy charges per year= avg. running hrs/dayx.746x17.5x365x1.11 per unit 52892.3325 9.72 514113.4719 28590.45
fixed charges per month 12 630.00 98695.80
duty charges @6% of energy charge 30846.81 14.92
SubTotal b= 643656.0802
Total Fixed Cost (I) = 691,656.08
II. Variable Cost
(a) Cost of chemical
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((600x5x81x2)/1000000)x100/30)x365 Kg/Year 591.3 150.00 88695.00 15.2534745 5567.5181925
Sub Total a= 88695.00
(b) Overhauling of IRP/ARP/FRP, core gravel, TIS media etc. 0 270000.00 0.00
Sub Total b= 0.00
(c) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 1 25000.00 25000.00
Sub Total c= 25000.00
Variable cost (I)= 113695.00
(d) Infrastructure Maintenance
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 14.5
Sub Total (Civil work)= 54888.25 73942.34 73942.34
Sub Total (elctro mech)= 10182.50 20658.52 20658.52
Sub Total d= 94600.86
Total Variable Cost II= 94,600.86 7883.405123 985.425640358995
Water Quality Test Report(1 source*2 times/year *@ Rs 350)III 700.00
Variable Cost (I+ II+III) = 208,995.86
Annual Rate of inflation for Manufactured product (2.92%*2.5 yr* variable cost)=(7.3% per year *variable cost (I+II+III)) 15,256.70
Total Variable Cost (Variable cost (I+II+III)+Inflation rate) 224,252.56
Total Cost (total Fixed Cost + Total variable cost) = 915,908.64
III Contractor's profit @ 10% on (I) & (II)= 91,590.86
V Add labour cess @ 1% on (Total cost- Electricty charge)= 2,722.53
VI Add cost towards emergent, unforseen breakdowns @ 5 % on Total Variable cost= 11,212.63
VII Operation and maintainence cost for 1 year (CP+GST+LC+Emergent cost)= 270,389.57
VIII Total Operation and maintainence cost for 1 year = 1,186,298.21
Contingency( 1% of total cost for 1 year) 11,862.98
IX Final operation and maintainence cost for 1 year (Total O&m Cost for 1 year+ Contingency )= 1,198,161.19
XII Final operation and maintainence cost for 5 year= 5,990,805.97
Executive Engineer
P.H. Division Dhaka
Sub Estimate No.- 12
Estimate for Administrative Approval of Operation & maintenance of CHIRAIYA Piped water Supply Scheme for the period 2025-2030 Under P.H.Division, DHAKA
1 Name of Division - DHAKA
2 Name of Sub Division - DHAKA
3 Block - CHIRAIYA
4 Panchayat - MISHRAULIYA & KHARTARI EAST
5 Wards Covered - 10,11 & 01
6 Year of DB completion of original scheme - 2010
Sl. No. Description Unit Cost as per TS'2012 Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount Remarks
(a) Cost of pump operator
1 nos for 365 days per month 1.00 4000.00 48000.00
Sub Total a= 48000.00
(b) Cost of energy charges 11.19
Capacity of motor pump say 15HP=(.746x15= 11.19 kW) kW 11.19 13.055 11.19
Avg. running hrs,/day 10
Energy charges per year= avg. running hrs/dayx.746x15x365x1.11 per unit 45336.285 9.72 440668.6902 24506.1
fixed charges per month 12 630.00 84596.40
duty charges @6% of energy charge 26440.12 14.92
SubTotal b= 551705.2116
Total Fixed Cost (I) = 599,705.21
II. Variable Cost
(a) Cost of chemical
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((600x5x81x2)/1000000)x100/30)x365 Kg/Year 591.3 150.00 88695.00 15.2534745 5567.5181925
Sub Total a= 88695.00
(b) Overhauling of IRP/ARP/FRP, core gravel, TIS media etc. 0 270000.00 0.00
Sub Total b= 0.00
(c) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 1 25000.00 25000.00
Sub Total c= 25000.00
Variable cost (I)= 113695.00
(d) Infrastructure Maintenance
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 17.5
Sub Total (Civil work)= 69732.95 100243.19 100243.19
Sub Total (elctro mech)= 10445.55 24532.63 24532.63
Sub Total d= 124775.81
Total Variable Cost II= 124,775.81 10397.98437 1299.74804643707
Water Quality Test Report(1 source*2 times/year *@ Rs 350)III 700.00
Variable Cost (I+ II+III) = 239,170.81
Annual Rate of inflation for Manufactured product (2.92%*2.5 yr* variable cost)=(7.3% per year *variable cost (I+II+III)) 17,459.47
Total Variable Cost (Variable cost (I+II+III)+Inflation rate) 256,630.28
Total Cost (total Fixed Cost + Total variable cost) = 856,335.49
III Contractor's profit @ 10% on (I) & (II)= 85,633.55
V Add labour cess @ 1% on (Total cost- Electricty charge)= 3,046.30
VI Add cost towards emergent, unforseen breakdowns @ 5 % on Total Variable cost= 12,831.51
VII Operation and maintainence cost for 1 year (CP+GST+LC+Emergent cost)= 255,651.76
VIII Total Operation and maintainence cost for 1 year = 1,111,987.25
Contingency( 1% of total cost for 1 year) 11,119.87
IX Final operation and maintainence cost for 1 year (Total O&m Cost for 1 year+ Contingency )= 1,123,107.12
XII Final operation and maintainence cost for 5 year= 5,615,535.60
Executive Engineer
P.H. Division Dhaka
Sub Estimate No.- 03
Estimate for Administrative Approval of Operation & maintenance of GAMHARI Rural Piped water Supply Scheme for the period 2025-2030 Under P.H.Division, GOPALGANJ
1 Name of Division - GOPALGANJ
2 Name of Sub Division - BARAULI
3 Block - BAIKUNTHPUR
4 Panchayat - GAMHARI
5 Wards Covered - 1,2,3,4,6,7
6 Year of DB completion of original scheme - 2018 Remarks
Sl. No. Description Unit Cost as per TS'2012 Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount 13
(a) Cost of pump operator
1 nos for 365 days per month 1.00 4000.00 48000.00
Sub Total a= 48000.00
(b) Cost of energy charges
Capacity of motor pump say 17.50 HP=(.746x20=14.92 kW) kW 14.92
Avg. running hrs,/day 6 32674.8
Energy charges per year= avg. running hrs/dayx.746x20x365 per unit 32674.8 9.72 317599.056
fixed charges per month 12 630.00 7560.00
duty charges @6% of energy charge 19055.94
SubTotal b= 344214.99936
Total Fixed Cost (I) = 392,215.00
II. Variable Cost
(a) Cost of chemical 105.019497 38332.116405
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((3890x5x81x2)/1000000)x100/3)x365 Kg/Year 383 150.00 57450.00
Sub Total a= 57450.00
(b) Overhauling of IRP/ARP/FRP, core gravel, TIS media etc. 0 270000.00 0.00
Sub Total b= 0.00
(c) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 1 25000.00 25000.00
Sub Total c= 25000.00
(d) Infrastructure Maintenance
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 7
Sub Total (Civil work)= 48871.09 58342.38 58342.38
Sub Total (elctro mech)= 9872.50 13891.60 13891.60
Total Variable Cost II= 154,683.98
III Expenditure (Misc. item such as water quality test report i/c allied stationery 5% of (II)= 7,734.20
IV Contractor's profit @ 10% on (I) & (II)= 54,689.90
V Add GST @ 18% on (I) & II)= 98,441.82
VI Add labour cess @ 1% on (II)= 5,468.99
VII Add cost towards emergent, unforseen breakdowns @ 10% on (II)= 15,468.40
VIII Variable Operation and maintainence cost for 1 year (III+IV+V+VI+VII+VIII)= 336,487.28 60725.18971 91087.7845656565
IX Total Cost (I) & (II)= 728,702.28
X Total Operation and maintainence cost for 5 year including fixed and variable costs= 3,643,511.38
Executive Engineer
P.H. Division Gopalganj
Sub Estimate No.- 04
Estimate for Administrative Approval of Operation & maintenance of SIRSAMANPUR Rural Piped water Supply Scheme for the period 2025-2030 Under P.H.Division, GOPALGANJ
1 Name of Division - GOPALGANJ
2 Name of Sub Division - BARAULI
3 Block - BAIKUNTHPUR
4 Panchayat - SIRSA MANPUR
5 Wards Covered - 9,11,12,17,18
6 Year of DB completion of original scheme - 2018 Remarks
Sl. No. Description Unit Cost as per TS'2012 Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount 13
(a) Cost of pump operator
1 nos for 365 days per month 1.00 4000.00 48000.00
Sub Total a= 48000.00
(b) Cost of energy charges
Capacity of motor pump say20 HP=(.746x20=14.92 kW) kW 14.92
Avg. running hrs,/day 6 32674.8
Energy charges per year= avg. running hrs/dayx.746x20x365 per unit 32674.8 9.72 317599.056
fixed charges per month 12 630.00 7560.00
duty charges @6% of energy charge 19055.94
SubTotal b= 344214.99936
Total Fixed Cost (I) = 392,215.00
II. Variable Cost
(a) Cost of chemical 59.664033 21777.372045
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((3920x5x81x2)/1000000)x100/3)x365 Kg/Year 772 150.00 115800.00
Sub Total a= 115800.00
(b) Overhauling of IRP/ARP/FRP, core gravel, TIS media etc. 0 270000.00 0.00
Sub Total b= 0.00
(c) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 1 25000.00 25000.00
Sub Total c= 25000.00
(d) Infrastructure Maintenance
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 7
Staff quarter 0.00
Sub Total (Civil work)= 89181.39 107357.52 107357.52
Sub Total (elctro mech)= 22986.50 32344.31 32344.31
Total Variable Cost II= 280,501.83
III Expenditure (Misc. item such as water quality test report i/c allied stationery 5% of (II)= 14,025.09
IV Contractor's profit @ 10% on (I) & (II)= 67,271.68
V Add GST @ 18% on (I) & II)= 121,089.03
VI Add labour cess @ 1% on (II)= 6,727.17
VII Add cost towards emergent, unforseen breakdowns @ 10% on (II)= 28,050.18
VIII Variable Operation and maintainence cost for 1 year (III+IV+V+VI+VII+VIII)= 517,664.99 75823.33241 113734.998617458
IX Total Cost (I) & (II)= 909,879.99
X Total Operation and maintainence cost for 5 year including fixed and variable costs= 4,549,399.94
Executive Engineer
P.H. Division Gopalganj
Sub Estimate No.- 05
Estimate for Administrative Approval of Operation & maintenance of DIGHWA NORTH Rural Piped water Supply Scheme for the period 2025-2030 Under P.H.Division, GOPALGANJ
1 Name of Division - GOPALGANJ
2 Name of Sub Division - BARAULI
3 Block - BAIKUNTHPUR
4 Panchayat - DIGHWA NORTH
5 Wards Covered - 2,3,4,5&6
6 Year of DB completion of original scheme - 2018
Sl. No. Description Unit Cost as per TS'2012 Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount Remarks
(a) Cost of pump operator
1 nos for 365 days per month 1.00 4000.00 48000.00
Sub Total a= 48000.00
(b) Cost of energy charges
Capacity of motor pump say20HP=(.746x20=14.92kW) kW 14.92
Avg. running hrs,/day 6
Energy charges per year= avg. running hrs/dayx.746x20x365 per unit 32674.8 9.72 317599.056 32674.8
fixed charges per month 12 630.00 7560.00
duty charges @6% of energy charge 19055.94
SubTotal b= 344214.99936
Total Fixed Cost (I) = 392,215.00
II. Variable Cost
(a) Cost of chemical
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((4804x5x81x2)/1000000)x100/3)x365 Kg/Year 380 150.00 57000.00 59.664033 21777.372045
Sub Total a= 57000.00
(b) Overhauling of IRP/ARP/FRP, core gravel, TIS media etc. 0 270000.00 0.00
Sub Total b= 0.00
(c) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 1 25000.00 25000.00
Sub Total c= 25000.00
(d) Infrastructure Maintenance
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 7
Staff quarter 0.00
Sub Total (Civil work)= 47222.63 57664.63 57664.63
Sub Total (elctro mech)= 10872.50 15298.70 15298.70
Sub Total d= 72963.33
Total Variable Cost II= 154,963.33 12913.61056 1614.20131983259
III Expenditure (Misc. item such as water quality test report i/c allied stationery 5% of (II)= 7,748.17
IV Contractor's profit @ 10% on (I) & (II)= 54,717.83
V Add GST @ 18% on (I) & II)= 98,492.10
VI Add labour cess @ 1% on (II)= 5,471.78
VII Add cost towards emergent, unforseen breakdowns @ 10% on (II)= 15,496.33
VIII Variable Operation and maintainence cost for 1 year (III+IV+V+VI+VII+VIII)= 336,889.54
X Total Operation and maintainence cost for 5 year including fixed and variable costs= 3,645,522.70
Executive Engineer
P.H. Division Gopalganj
Sub Estimate No.- 06
Estimate for Administrative Approval of Operation & maintenance ofBAIKUNTHPUR Rural Piped water Supply Scheme for the period 2025-2030 Under P.H.Division, GOPALGANJ
1 Name of Division - GOPALGANJ
2 Name of Sub Division - BARAULI
3 Block - BAIKUNTHPUR
4 Panchayat - SIRSA MANPUR
5 Wards Covered - 14,15,16
6 Year of DB completion of original scheme - 2018
Sl. No. Description Unit Cost as per TS'2012 Variation amount Total Cost % annual O&M cost % annual depreciation Base year O&M Cost Quantity Rate Amount Remarks
(a) Cost of pump operator
1 nos for 365 days per month 1.00 4000.00 48000.00
Sub Total a= 48000.00
(b) Cost of energy charges
Capacity of motor pump say10HP=(.746x10=7.46kW) kW 7.46
Avg. running hrs,/day 6
Energy charges per year= avg. running hrs/dayx.746x10x365 per unit 16337.4 9.72 158799.528 16337.4
fixed charges per month 12 630.00 7560.00
duty charges @6% of energy charge 9527.97
SubTotal b= 175887.49968
Total Fixed Cost (I) = 223,887.50
II. Variable Cost
(a) Cost of chemical
for 2 ppm & 30% Cl solution (population x demand x cl strength) (((4804x5x81x2)/1000000)x100/3)x365 Kg/Year 380 150.00 57000.00 59.664033 21777.372045
Sub Total a= 57000.00
(b) Overhauling of IRP/ARP/FRP, core gravel, TIS media etc. 0 270000.00 0.00
Sub Total b= 0.00
(c) Cleaning of ESR every 6 months & cleaning of campus at regular interval per year 1 25000.00 25000.00
Sub Total c= 25000.00
(d) Infrastructure Maintenance
Rt=[ 1+(r/100)]^t x Base year O&M cost t= 7
Staff quarter 0.00
Sub Total (Civil work)= 34418.06 41455.88 41455.88
Sub Total (elctro mech)= 8550.00 12030.71 12030.71
Sub Total d= 53486.59
Total Variable Cost II= 135,486.59 11290.54909 1411.31863578965
III Expenditure (Misc. item such as water quality test report i/c allied stationery 5% of (II)= 6,774.33
IV Contractor's profit @ 10% on (I) & (II)= 35,937.41
V Add GST @ 18% on (I) & II)= 64,687.34
VI Add labour cess @ 1% on (II)= 3,593.74
VII Add cost towards emergent, unforseen breakdowns @ 10% on (II)= 13,548.66
VIII Variable Operation and maintainence cost for 1 year (III+IV+V+VI+VII+VIII)= 260,028.06
X Total Operation and maintainence cost for 5 year including fixed and variable costs= 2,419,577.81
Executive Engineer
P.H. Division Gopalganj
TECHNICAL BID SHEET OF GROUP 01 TENDER NIT No– 01/2026-27/O&M-PHED
Name of Work Part I: Fixed Operation of Ward level piped water supply schemes (Quality affected/NQ affected) & PWS Schemes by deploying pump operators and payment of electricity charges and Part II: Variable Comprehensive maintenance of Ward level water supply schemes (Quality affected/NQ affected) & PWS Schemes, i/c the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of ESR and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in districbuition line, repair and provision of new FHTCs, repair amd maintenance of pumps and other electromechanical components etc. all complete as per the directions of Engineer-in-charge. Cost of Work as per BOQ(Rs in Lakhs) 1249.88493 Time of Completion in months 60 ALL COLOURED CELL TO BE FILLED ACCORDINGLY
Sanctioned Amount (in lakhs) 1249.88493 As per Technical Approval Date of Tender 04-13-26
Sl No. Items Requirement Requirement Cl. No.
Name of the Contractor
Address of the Contractor
1 Bid Validity Bids shall remain valid for a period not less than 180days after the deadline date. A Bid valid for a shorter period shall be rejected by the Employer as non-responsive 180 Days 15.1 Page/21 Bid validity periods In days
2 Bid Security a)Unconditional bank guarantee from any scheduled Indian bank issued within the state in the format given (If issued from any bank outside state will be converted to any bank within the state before executing the agreement, duly pledged in favour of the Executive Engineer, PHED Division, dHAKA 16.1 Page-21 Amount To be entered (Rs in Lakhs)
Bid Security Amount - (Rs. In Lakhs) 22.50 Bid Security Amount - Rs. 0.00
3 (i) Legal Status of Bidder. 4.3(a) Page-12
(ii) Place of Registration.
(iii) Principal place of Business
(iv) Power of attorney of signatory Bid Attached or Not 4.2(iv) Page-11
4 Total value of civil engineering construction work performed in last five years. Achieved in any one year during the last five years, a minimum annual financial turnover (in all classes of civil engineering construction works only) volume of construction work of at least the amount equal to the 50% (fifty percent) of the estimated cost of the works for which bid has been invited. The turnover will be indexed at the rate of 8% for a year. The certificates attached in support of turnover attached shall have valid Unique Document Identification Number (UDIN). 624.94 4.5A (a) Page-16
2021-22 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.47 0.00000
2022-23 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.36 0.00000
2023-24 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.26 0.00000
2024-25 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.17 0.00000
2025-26 Amount To be entered (Rs in Lakhs)
Escalation Factor= 1.08 0.00000 0.00000
5A Work Experience of Similar nature Satisfactorily completed as a prime contractor (or as a nominated sub contractor, where the sub contract involved the executiion of all main items of the work described in the bid document, provided further that all other qualifications criteria are satisdied) at least one similar work of value not less than the amount specified in the Appendix (not less than 10% (Ten Percent) of the estimated value of Contract. Or Satisfactory completed water supply schemes (Piped water supply schemes) at least one work of value not less than 10% (Ten percent) 0f the estimated cost of works for which the bid has beem invited. 124.99 4.5A (b) Page -16 Amount To be entered (Rs in Lakhs)
7 Bidding Capacity: More than the total Bid value of present work = A*N*3-B=Rs. ____.Where A = Maxm. Value of work executed in any one yr during last 5 yrs. N= Nos of years for completion of works. B=Value of existing commitments & ongoing works to be completed in period. Necessity of bid capacity for bidders who meet the minimum qualifying criteria is not mandatory for ward wise schemes up to Rs. 2.00 crore in Har Ghar Nal Ka Jal Nishchay Yojna. Clause- 4.7(a) above is not applicable for this category of schemes 1249.885 4.7 Page- 13 0.00000
6 Bidding Capacity: Should be more than Available Bid capacity = (A x N x 3 - B)= Rs. _____, Where A= Maximum Value of work executed in any one year during last 5 yrs. , N = Number of years prescribed for completion of the works for which bids are invited. (For contracts involving operation and maintenance; the period of completion shall be the sum of entire DB duration and half the duration of the O&M period), B= Value (updated to the price level of the year indicated in Appendix) of existing commitments and on-going works to be completed during the next 12 months 1249.885 4.7 Page-17 Amount To be entered (Rs in Lakhs)
7 (a) Existing commitments and ongoing works Page - 35 Amount To be entered (Rs in Lakhs)
(b) Work for which Bid already submitted Page - 35 Amount To be entered (Rs in Lakhs)
8 Availability of key items of Contractor's Equipment Type of Equipment/Maximum age No. Required Nos. Max. Age on 24-25 4.5(B) (b) Page-31 Annexure-I Nos./ Max. Age
Concrete Mixer 2 5
Rotary Drilling / Reverse Rotary / DTH Rig Machine 1 10
Truck/Tractor with trailer 1 5
Hydraulic Excavator 1 5
9 Key Personnel 10-30 Crores 4.5(B) (b) Page-31 Annexure-II Name of the Personnel and Experience in years
Project Manager B.E. Civil + 10Years Exp. (5 years as Manager in PHED works) or retired E.E. & above of PHED 1
Site Engineer B.E. Civil + 07Years Exp. (3 years as Manager in PHED works) or retired A.E. & above of PHED 2
Site Supervisor B.E. Mech./Civil + 05 Years Exp. Or Dip. Mech./Civil + 07 years Exp. Or or retired J.E. & above of PHED 8
Burveyor .B E. Civil + 03 Years Exp. orDip. Civil + 05 years Exp. 1
10 Evidence of accesses to Financial Resources Evidence of access to or availability of credit facilities (10% of estimated cost), certified by bankers (Not more than 3 months old). (Rs in Lakhs). 124.99 Page 12 4.3 (g) Amount To be entered (Rs in Lakhs)
11 Proposed methodology and programme of construction. Justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones. (Attached or not) Page 12 4.3 (l)
12 Litigation History Information regarding any litigation, current or during the last five years, in which the Bidder is involved, the parties concerned, and disputed amount. (Attached or not) Page 12 4.3 (j)
13 Affidavit Regarding statements made in the required attachments are true and correct. Page 20 12.1 (vi)
14 Undertaking Able to invest a minimum of cost upto 25% of contract value of work. During implementation of contract. 25 % of B.O.Q.Amount 312.47 Page 12 4.3 (h)
17 Character Certificate
18 Time of Completion 60 Months To be entered in months
Executive Engineer
P.H Division, Dhaka
Check List for Submission Of Tender
Evaluation will be done as per the information provided in the document attached with tender. Bidder may disqualified, if documents are not attached properly.
Name of the Bidder
Sl. No. Checklist Items (Attach Documents in Edit Attachment Folder) Document attached
1 BIDSECURITY PHOTO COPY
2 LAST 5 YEARS ANNUAL TURN OVER
3 EXPERIENCE Of SIMILAR NATURE Of W0RKS
4 QUANTITY OF WORK OF SIMILAR NATURE EXECUTED DURING LAST 5 YEARS)
5 BALANCE VALUE OF ON GOING WORKS
6 EXISTING COMMITMENTS
7 BANKER'S CERTIFICATE FOR ACCESS OF FINACIAL RESOURCES
10 LITIGATION HISTORY
11 PLANT and MACHINARIES
12 KEY PERSONNEL
13 Registration
14 Power of Attoney
15 Legal Status Of Bidder
16 PROGRAMME Of CONSTRUCTION
17 NOC FOR DEBAR
18 LABOUR LICENCE
20 GST CERTIFICATE
21 Character Certificate
22 Any other Documens required as per NIT/ Standard Bidding Documents Required
IF YOU HAVE NOT BEEN DEBARED WRITE "NOT APPLICABLE" IN YOUR LETTER HEAD SCAN AND UPLOAD IN THE IN NOC FOR DEBAR LINK
Note:-Attachment should be self attested and should be attached as per above instruction, otherwise it may be rejected.
I, the undersigned, do hereby certify that all the statements made in the required attachments are true and correct.
Signature & Seal of the Bidder
NAME OF WORK Part I: Fixed Operation of Ward level piped water supply schemes (Quality affected/NQ affected) & PWS Schemes by deploying pump operators and payment of electricity charges and Part II: Variable Comprehensive maintenance of Ward level water supply schemes (Quality affected/NQ affected) & PWS Schemes, i/c the cost of chemicals, overhauling of filter media and related appurtenances, cleaning of ESR and campus, maintenance viz. cleaning painting of pump house, boundary wall, repair of leakages in districbuition line, repair and provision of new FHTCs, repair amd maintenance of pumps and other electromechanical components etc. all complete as per the directions of Engineer-in-charge. Blocks: All Blocks of Dhaka Division No. of schemes: WLS(Non Quality): - 54 WLS(Quality): - 00 PWS: - 12
Date of Tender :- 04-13-26
Estimated Cost :- ₹ 124,988,493.72
Earnest Money :- ₹ 2,250,000.00
Duration of Maintenance Period 5 Years
Cost of BOQ :- As Per EProc-2
SI NO. PARTICULARS No. of Scheme AMOUNT
1 I. Operation of Ward level piped water supply schemes (Quality affected/NQ affected) & PWS Schemes by deploying pump operators and payment of electricity charges and II. Comprehensive maintenance of Ward level water supply schemes (Quality affected/NQ affected) & PWS Schemes i/c the cost of chemicals, overhauling of filter media and related apputenances, cleaning of ESR and campus, maintenance viz. claning painting of pump house, boundary wall, repair of leakages in districbuition line, repair and provision of new FHTCs, repair amd maintenance of pumps and other electromechanical components etc. all complete as per the directions of Engineer-in-charge. WLS(Non Quality):- 54 WLS( Quality):- 00 PWS- 12 ₹ 124,988,493.72
Total Amount ₹ 124,988,493.72
Rupees Twelve Crore Forty Nine Lakh Eighty Eight Thousand and Four Hundred Ninety Three and Seventy Paise Only
1 Estimated cost Rs. ₹ 124,988,493.72 (A)
2 Cost of Govt. Material :- NIL NIL (B)
3 Name of the Contractor :-
4 Address of the Contractor :-
5 I/we offer in Figures……. in words………………… % (Percentage) High on the rate for the fixed cost (Part I) for operation of the schemes. IN FIG.
6 I/we offer in Figures……. in words………………… % (Percentage) High / Less on the rate for the variable cost (Part-II) for maintenance of the schemes. IN FIG. 100
7 Average rate quoted by the bidder 0.00
Note :- 1.) Bidders has to quote rate in Percentage High/Less only. 0.6
Note :- 2.) Items/ Quantity of Work will be decided by the department on day to day / priority basis during period of maintenance.
Note :- 3.) The quoted rate for the operation part I (fixed cost) i.e. the payment to the operators and the electricity bills, the quote shall not be negative.
Note :- 4.) The electricity bills shall be paid as per actual.
Note :- 5.) The entry in row 7 shall be considered for decision of financially lowest bid.
Executive Engineer, P.H.Division, Dhaka
aoc.json
Purchase Order
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
SBD_PHED_O&M_60 months_WLS.doc
NIT • 0.93 MB
NIT-01 2026-27 PHED-O&M.pdf
NIT • 0.34 MB
ESTIMATE.xlsx
NIT • 0.64 MB
Technical Bid NIt 01 2026-27.xlsx
NIT • 0.14 MB
SBD_PHED_O&M_60 months_WLS.doc
NIT • 0.93 MB
Paper Cutting.jpeg
NIT • 0.19 MB
Financial BId NIT 01 2026-27.xlsx
NIT • 0.02 MB
C2 CoriDhaka.pdf
Corrigendum • 0.15 MB
C1 Corrigendum Dhaka.pdf
Corrigendum • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .