| 1 | L1₹67.0 LAccepted-AOC NEW COLONY BILPUR FATEHGANJ EAST BAREILLY | BAREILLY | BAREILLY | UTTAR PRADESH | ₹67.0 L Quoted ₹56.8 L | L1 | Accepted-AOC DUE TO LOWER RATE |
| 2 | L2₹56.9 LRejected-Finance | ₹56.9 L | L2 | Rejected-Finance due to higher rate |
Tender Value
₹56.9 L
EMD Value
₹1.1 L
Closing Date
20 May 2026, 12:00 pmClosed
SE RED CIRCLE BAREILLY
SE RED CIRCLE BAREILLY OFFICE
Construction work on the road extending from Padhera Road to the ancient Shiva Temple in Gram Panchayat Sisaiya Maganpur. Development Block Faridpur
2026_REDUP_1145357_48
13/RED/Nivida file Bareilly/E Nivida/2026-27 dated 01-04-2026
Open Tender
Civil Works - Roads
120 days
FARIDPUR BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.1 L
SE RED CIRCLE BAREILLY
1 Jul 2026
6 May 2026
20 May 2026
6 May 2026
20 May 2026
6 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | BOQ | - | - | - | - |
| 1 | Excavation in foundation in ordinary soil, loame, clay or sand inculuding lift upto 1.5 m & lead upto 30m including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30mfrom the foundation trenches. SI. No. 251. | 58.29 | cum | 198.55 | ₹11,573.48 |
| 2 | Concrete with 4 cm. gauge brick ballast, final local sand of 1.25 FM and cement in proportion of 12 :6 : 1 in foundation and under floor, Including supply of all Material with mixer machine, Labour and T & P etc. required for proper completion the work.As per S.I. No. 273 | 19.87 | cum | 3,519.75 | ₹69,937.43 |
| 3 | First class Brick work in 1:4 cement and coarse Sand morter in foundation & Plinth inculding supply of all materials Labour T & P etc.required for proper completion of work. As per S.I. No. 305. | 119.23 | cum | 5,225 | ₹6,22,976.75 |
| 4 | 12 m.m. thick Plaster with Cement mortar consisting of one part of cement and 4 part of coarse sand of 2.25 FM on brick work including supply of all material, labour, T&P etc.S.I No 584(i). | 288 | Sqm | 206.15 | ₹59,371.2 |
| 5 | Cement Concrete with 20 mm. gauge approved stone grit ; approved Coarse Sand and Cement in the proportion of 4:2:1 inculding supply of all Material, Labour and T & P etc. required for proper completion the work. As per S.I. No. 279(i) | 6.62 | Sqm | 7,441.35 | ₹49,261.74 |
| 6 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 290.3 | cum | 3,228.2 | ₹9,37,146.46 |
| 7 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 Kn in stages to proper grade and camber applying and brooming stone screening / binding material to fill up the interstics of coarse aggregate, watering and compacting to the required dencity . Grading - III ( with 22.40-53 mm size stone ballast) As per technical specification clause 405. | 290.3 | cum | 4,179.43 | ₹12,13,288.53 |
| 8 | Providing and laying of factory made 80mm thick interlocking cement concrete tile including 25mm compacted bed of fine sand compected and proper imbendding laying of interlocking tile etc work. Chapter no. 20 new item 1 | 2,903.04 | sqm | 831.25 | ₹24,13,152 |
| 9 | R.C.C. work with cement approved coarse sand and 2 cm (3/4") gauge approved stone ballast in the proportion of 1:1½:3 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.l. binding wire and includuing Necessary centering and shuttering etc.and also including supply of all materials, labour and T&P etc. required for proper completion of the work. Binding wire cost being included in the item.. As per S.I. No. 283 A. | 2.45 | cum | 8,436.95 | ₹20,670.53 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.80 MB
BOQ_2141841.xls
BOQ • 0.25 MB
48-T2ofPanchyatSisaiyaManpur.pdf
Tender Documents • 4.19 MB
Download all tender documents and submit your bid