| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹94.4 CrAccepted-AOC | ₹94.4 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | FABTECH WORKS CONSTRUCTIONS PVT LTD L2₹97.7 CrRejected-Finance | ₹97.7 Cr | L2 | Rejected-Finance L2 Bidder |
| 3 | L3₹129.1 CrRejected-Finance | ₹129.1 Cr | L3 | Rejected-Finance L3 Bidder |
Tender Value
Refer Docs
EMD Value
₹33.3 L
Closing Date
14 Jul 2020, 3:00 pmClosed
Puneet Khanna (Head-Supply Chain Management)
WORLEY India Private Limited, New Energy House , Ramakrishna Mandir Road, Kondivita, Andheri (East), Mumbai-400 059, India
LSTK-G1_Propylene Mounded Bullets and Unloading Facility
2020_REFHQ_117073_1
44AC9100-ER- 370010
Open Tender
Lump Sum TurnKey
480 days
IOCL GUJARAT REFINERY, INDIA
Please refer Tender documents
9 documents required · 9 mandatory
₹33.3 L
Yes
WORLEY India Private Limited
7 Feb 2021
15 May 2020
15 Jul 2020
15 May 2020
14 Jul 2020
12 Jun 2020
1 Jun 2020
Amount
Residual Process Engineering, Detailed Design Engineering including HAZOP/HAZID/SIL Study & Other Safety Studies as mentioned in Bidding Documents, Project Management, Topography Survey and Soil Investigation, Carrying Out Route Surveys Wherever Required For Over Dimensional Consignments, Site enabling jobs including area filling and grading upto FGL, Pre-Commissioning Spares, Commissioning Spares, Start-up spares & Mandatory spares, Fabrication, Manufacturing, Quality Assurance, Inspection & Expediting, Third Party Inspection, Supplies, Transportation, Insurance, Handling & Storage of all Equipment, Materials, items and other Construction Materials at yard/site, Fabrication, Assembly, Construction, Erection, Installation of all plant machinery including civil foundation, piling works, Structural, Mechanical, Piping, Electrical and Instrumentation including tie-ins, Testing, Insulation, Painting, hydro-testing, calibration, cleaning, coating / painting of field joints / damaged surfaces etc. as applicable and installation of Cathodic protection system, requisite fire proofing, supply & installation of instruments including mound for the Propylene Mounded bullets, First fill of chemicals and lubricants, Obtaining all Statutory Approvals (except for Environment Clearance which will be obtained by M/s IOCL),pre commissioning & Mechanical Completion of Plant, Preparation of plant specific operating manuals, Start-up, Commissioning and Performance Guarantee Test Runs (PGTR), Training of Owner’s O&M personnel (as applicable), Contract closure activities , Final invoice/ billing & document hand over and handing over of the facilities with Final and “As Built” documentation for LSTK-G1 Propylene Mounded Bullets & Unloading Facility of Acrylic/Oxo-Alcohol Project at IOCL Dumad Complex, Near Gujarat Refinery
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
Lumpsum Price for Supply portion for completion of Scope of Work as per Bidding Document
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
ENGINEERING PRICE ( DESIGN AND DETAILED ENGINEERING OF PROPYLENE MOUNDED BULLETS & UNLOADING FACILITY AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
LUMPSUM PRICE FOR CONSTRUCTION/INSTALLATION, START-UP, PRECOMMISSIONING, COMMISSIONING, PGTR, TRAINING PORTION AS PER REQUIREMENTS DETAILED OUT IN VARIOUS SECTIONS OF BIDDING DOCUMENT
FOREIGN CURRENCY PART
INDIAN CURRENCY PART
Description of Work / Item(s)
Amount
Tax Details
GST ON SUPPLY OF INDIGENOUS GOODS (PART BREAK-UP OF SP-1 )
Customs Duty on Foreign Component of SP-1
SWS on Customs duty on Foreign Component of SP-1
IGST/ (CGST+SGST) on (Foreign Component of SP-1 + (Customs duty at Sr.2.1 + SWS at 2.2 above))
GST ON SUPPLY OF SERVICES (PART BREAK-UP OF SP-2)
Description of Work / Item(s)
Amount
AMOUNT OF FOREIGN COMPONENT
AMOUNT OF INDIAN COMPONENT
Description of Work / Item(s)
Amount
Annual charges for Post Warranty maintenance for SOFT STARTER (Supplied by Contractor) as per technical portion of bidding document for the following periods:
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
FABTECH WORKS CONSTRUCTIONS PVT LTD
VIJAY TANKS AND VESSELS (P) LTD
FABTECH WORKS CONSTRUCTIONS PVT LTD
VIJAY TANKS AND VESSELS (P) LTD
FABTECH WORKS CONSTRUCTIONS PVT LTD
VIJAY TANKS AND VESSELS (P) LTD
FABTECH WORKS CONSTRUCTIONS PVT LTD
VIJAY TANKS AND VESSELS (P) LTD
VIJAY TANKS AND VESSELS (P) LTD
G.R.Engineering Private Limited
G.R.Engineering Private Limited
VIJAY TANKS AND VESSELS (P) LTD
US Dollar
European Euro
British Pound
Japanese yen
Singapore Dollar
US Dollar
US Dollar
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid