Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹42,700
Closing Date
28 May 2022, 3:00 pmClosed
Project Manager
O/o PM PO Paradip, DCIL, Old Trade Centre, Paradip
Supplying and operating of Excavator EX-200 crawler type, Make 2017 or above on as and when required basis for DCI intended works at Paradip
2022_MoS_689423_1
DCIL/PDP/OPS/EXCAVATOR/2022-23
Open Tender
Miscellaneous Services
Item Rate
365 days
Paradip
As per tender document
10 documents required · 10 mandatory
₹1,180
Dredging Corporation of India Limited
₹42,700
Yes
9 Jun 2022
19 May 2022
30 May 2022
19 May 2022
28 May 2022
19 May 2022
19 May 2022 - 27 May 2022
Amount
Supply, and operating of Excavator EX-200 Capacity, Make 2017 or above on as and when required basis at Paradip Port Authority (PPA) Inside PPA Harbour for attending DCI intended works at Paradip. Operational Charges: Operational Hours considered for payment. 1. From 00 Hrs to 04 Hrs = Half Shift of 04 Hours 2. From 04Hrs to 08 Hrs = Full Shift of 08 Hours 3. Beyond Shift of 08 Hrs= Per Hour Note: The rate (to be quoted) is inclusive of Loading, Transportation, Unloading, Operator & Helper wages, PF & Insurance, Permissions, PPT Pass, Fuel oils & Lubes, Mobilization & De-Mobilization, Break down, all inclusive but excluding GST. 2. The break down hours during operational hours will not be considered for payment.
Charges for extra hours beyond shift of 08Hrs.
Retention Charges: Note: The retention charges will be applicable only if the hired Poclain is at designated Site, idle in a day of 24Hrs. On account of DCI instructions.
Supply, and operating of Excavator EX-200 Capacity, Make 2017 or above on as when required basis for attending works NR; works such as connecting the MS & SFPL pipeline at takeoff point, Laying & removing of dead man, Road/Trench Cutting, Backfilling and other pipeline works at NRL reclamation works.Operational Charges: Operational Hours considered for payment. 1. From 00 Hrs to 04 Hrs = Half Shift 2. From 04Hrs to 08 Hrs = Full Shift 3. Beyond Shift of 08 Hrs= Per Hour Note: The rate (to be quoted) is inclusive of Loading, Transportation, Unloading, Operator & Helper wages, PF & Insurance, Permissions, PPT Pass, Fuel, Oils & Lubes, Mobilization & De-Mobilization, Break down, all inclusive but excluding GST. 2. The break down hours during operational hours will not be considered for payment.
Charges for extra hours beyond shift of 08Hrs:
Retention Charges: Note: The retention charges will be applicable only if the hired Poclain is at designated Site, completely idle in a day of 24Hrs. On account of DCI instructions..
Supply, and operating of one excavator EX-200 Capacity, Make 2017 or above on dally hire basis for attending works such as clearing of pumped material, spreading of material, extension of pipeline, shifting & replacing of MS pipes, and other project works at NRL reclamation area. Operational Charges: Operational Hours considered for payment 1. From 06.00 Hrs to 14:00Hrs= 01 Full Shift of 08Hrs. 2. From 14.00Hrs to 22:00Hrs = 01 Full Shift of 08Hrs, 3. From 22:00Hrs to 06:00Hrs= 01 Full Shift of 08Hrs. (Total 03 Shifts in 24Hrs) Note: The rate (to be quoted) is inclusive of Loading, Transportation, Unloading, Operator & Helper wages, PF & Insurance, Permissions, PPT Pass, Fuel, Oils Mobilization & De-Mobilization, Break down, all inclusive but excluding GST. 2. The break down hours during operational hours will not be considered for payment.
Retention Charges: Note: In case the working days are beyond 15 days in a month No retention, charges are applicable. 2. And the retention charges will be applicable only if the hired Excavator is at Site completely idle in a day of 24Hrs. on account of DCI instructions
SARALA ENGINEERING
DEV ASSOCIATES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .