| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC JOGINDER NAGAR HIMACHAL PRADESH HP | MANDI | HIMACHAL PRADESH | 175001 | ₹1.3 Cr | L1 | Accepted-AOC Lowest one |
| 2 | L2₹1.5 Cr+₹14.8 L (11.0%)Rejected-Finance GOVT CONTRACTOR VILLAGE GHUMALI P O AGAR TEHSIL FATEHPUR DISTT KANGRA HP | MANDI | HIMACHAL PRADESH | 175013 | ₹1.5 Cr+₹14.8 L (11.0%) | L2 | Rejected-Finance Highest |
| Sl No | Description | Qty | Unit | VARINDER SINGH RANA L2 | RANBIR SINGH L1 |
|---|---|---|---|---|---|
| 1.00 | Demolition above G.L upto floor level including disposal of unservicable materials within 20 mtr including cutting the necessary reinforcement and parting out from RCC work complete in all respect within all leads and lifts and as per the direction and entire satisfaction of the Engineer-in-Charge. | 515.78 | P/Cubic Meter | 4,500 ₹23,21,010 | 570 ₹2,93,994.6 Lowest |
| 2.00 | Excavation in foundation trenches etc. in earth work in all classification of soil such as pick work, jumper work, blasting hard and soft rock including chiselling where blasting prohibited bailing or pumping out water (Dewatering) upto all lifts and depths, stacking the excavated soil upto any lead from the edge of excavation and then returning the stacked soil in 15cm. layers when required into plinths sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth complete in all respect and as per the direction and entire satisfaction of the Engineer-in-Charge. | 1,272.12 | P/Cubic Meter | 180 ₹2,28,981.6 Lowest | 210 ₹2,67,145.2 |
| 3.00 | Providing and laying cement concrete 1 : 5 : 10 ( 1 cement : 5 sand : 10 graded stone agg. 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth complete in all respect within all leads and lifts and as per the direction and entire satisfaction of the Engineer - in - Charge. | 67.17 | P/Cubic Meter | 3,500 ₹2,35,095 Lowest | 4,200 ₹2,82,114 |
| 4.00 | Providing and laying cement concrete 1 : 3 : 6 ( 1 cement : 3 sand : 6 graded stone agg. 20 mm nominal size) and curing complete excluding cost of form work in foundation and plinth complete in all respect within all leads and lifts and as per the direction and entire satisfaction of the Engineer-in-Charge. | 447.64 | P/Cubic Meter | 4,700 ₹21,03,908 | 4,680 ₹20,94,955.2 Lowest |
| 5.00Providing and laying cement concrete 1 : 2 : 4 ( 1 cement : 2 sand : 4 graded stone agg. 20 mm nominal size) and curing complete excluding cost of form work in foundation and plinth complete in all respect within all leads and lifts and as per the direction and entire satisfaction of the Engineer-in-Charge. | |||||
| 5.01 | foundation footing and bases of column | 6.79 | P/Cubic meter | 5,950 ₹40,400.5 Lowest | 7,500 ₹50,925 |
| 5.02 | in wall ( any thickness but not less than 0.10 mtr thickness attached pillasters, buttresses, plinth and skirting courses etc. from foundation level upto top floor level including entire carriege of material within all leads and lifts and as per the direction and entire satisfaction of the Engineer-in-Charge. | 6.06 | P/Cubic meter | 5,950 ₹36,057 Lowest | 7,500 ₹45,450 |
| 6.00Providing and laying cement concrete 1 : 1.5 : 3 ( 1 cement : 1.5 sand : 3 graded stone agg. 20 mm nominal size) and curing complete excluding cost of form work in foundation and plinth within all leads and lifts and as per the direction and entire satisfaction of the Engineer-in-Charge. | |||||
| 6.01 | Suspended floors, roofs, landings and shelves and their supports balconies, beams, girders, bressumers and cantilever up to floor two level. (up to 15 mtrs. Height) | 149.51 | P/Cubic Meter | 6,700 ₹10,01,717 Lowest | 8,400 ₹12,55,884 |
| 6.02 | Suspended floors, roofs, landings and shelves and their supports balconies, beams, girders, bressumers and cantilever up to floor two level. (up to 12 mtrs. Height) | 17.3 | P/Cubic Meter | 7,400 ₹1,28,020 Lowest | 8,400 ₹1,45,320 |
Tender Value
₹2.2 Cr
EMD Value
₹3.0 L
Closing Date
14 Nov 2025, 11:00 amClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER SHAHNEHAR PROJECT DIVISION NO 1 SANSARPUR TERRACE
SH Repair Of damaged portion of Main Canal RD 13175 to 13319 144 mtrs Aquaduct at RD 16325 to 16355 30 mtrs. SM-1 RD 9195 200.00 mtrs on pedesta) and 150.00 mtrs. on ground ,ML-1 at Rd 12120 228.00 mtrs. on ground and HDPE pipe PE80 class PN-6 LBC
2025_HPIPH_119706_1
EE-SNPD-1-ST-03
Open Tender
Civil Works
Item Rate
180 days
SANSARPUR TERRACE
AS PER NIT
6 documents required · 6 mandatory
₹5,000
₹3.0 L
1 Apr 2026
5 Nov 2025
14 Nov 2025
5 Nov 2025
14 Nov 2025
5 Nov 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
FORM6.pdf
Tender Documents • 0.31 MB
FORM8.pdf
Tender Documents • 0.29 MB
BOQ_175259.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .