Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-Finance H NO 159 VILL AND P O BHAUWALA NEAR S N PUBLIC SCHOOL RAJAWALA ROAD DEHRADUN UTTARAKHAND 248007 | DEHRADUN | UTTARAKHAND | 248007 | L1 | Accepted-Finance L1 | |
| 2 | L2₹10.0 L+₹37,617 (3.91%)Accepted-Finance GROUND FLOOR LANE NO 5 SUBHASH NAGAR DEHRADUN U K 248 B O 286 PRAGATI NAGAR MEERUT | 248 | L2 | Accepted-Finance L2 | |
| 3 | L3₹10.1 L+₹49,100 (5.10%)Accepted-Finance | L3 | Accepted-Finance L3 |
| Sl No | Description | Qty | Unit | m/s star power solutions L2 | Uttaranchal Construction Company L3 | MSN CONSTRUCTION COMPANY L1 |
|---|---|---|---|---|---|---|
| 1.00PART A | ||||||
| 1.01 | Work of clearing the space under the tower and making the route for carrying required T&P by removing wild bushes. | 3 | Job | 6,000 ₹18,000 Lowest | 8,000 ₹24,000 | 7,000 ₹21,000 |
| 1.02 | Work of Transportation for carrying required material and heavy T&P to complete the work by head loading to the working site and returned back to store at Bindal. | 2 | Job | 2,500 ₹5,000 Lowest | 12,000 ₹24,000 | 15,000 ₹30,000 |
| 1.03 | Work of strengthening of Towers by Providing stays to tower No-128A & 139B with the help of steel rope and Turn buckle at suitable dry place near tower, including excavation of earth, grouting of stay with all necessary work required in order to ensure safety of next tower to prevent from any distortion. | 8 | Job | 6,500 ₹52,000 Lowest | 8,000 ₹64,000 | 7,000 ₹56,000 |
| 1.04 | Excavation of earth in mixed soil dry, wet soft and hard rock making foundation including cost of labour tools &plants etc required for proper completion of work.((3*3*2)*6). | 108 | cum | 525 ₹56,700 | 500 ₹54,000 | 440 ₹47,520 Lowest |
| 1.05 | Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing. All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). (1*1*2)*6). | 12 | cum | 10,750 ₹1,29,000 Lowest | 12,000 ₹1,44,000 | 11,000 ₹1,32,000 |
| 1.06 | Back earth filling after completing of foundation work with ramming, curing etc including all labour and T&P etc. | 108 | cum | 525 ₹56,700 | 500 ₹54,000 | 435 ₹46,980 Lowest |
| 1.07 | Supply of MS Steel Bar | 1.5 | MT | 94,418 ₹1,41,627 Lowest | 1,00,000 ₹1,50,000 | 1,00,000 ₹1,50,000 |
| 1.08 | Work of breaking CC in Chimney of tower No-128A & 139 B as per instruction of Ptcul Representatives including all labor and T&P etc. | 6 | Job | 4,000 ₹24,000 | 2,500 ₹15,000 Lowest | 3,500 ₹21,000 |
| 1.09 | Work of fabrication of required tower stubs, leg for Tower No-128 A &139B including labour and T&P,generator etc. to complete the work. | 1 | MT | 4,500 ₹4,500 | 3,000 ₹3,000 Lowest | 6,500 ₹6,500 |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
31 Dec 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE O AND M CIRCLE DDUN
SE O AND M CIRCLE DDUN
Work of strengthning of various old Towers legs and foundations of 132KV Bindal Rishikesh line
2024_PTCUX_78671_1
T35 SE O and M CR Ddun 2024 25
Open Tender
Electrical Works
Item Wise
120 days
WORK
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE O AND M DIV YAMUNA COLONY PTCUL DDUN
₹30,000
20 Aug 2025
10 Dec 2024
3 Jan 2025
10 Dec 2024
31 Dec 2024
10 Dec 2024
Amount
PART A
Work of clearing the space under the tower and making the route for carrying required T&P by removing wild bushes.
Work of Transportation for carrying required material and heavy T&P to complete the work by head loading to the working site and returned back to store at Bindal.
Work of strengthening of Towers by Providing stays to tower No-128A & 139B with the help of steel rope and Turn buckle at suitable dry place near tower, including excavation of earth, grouting of stay with all necessary work required in order to ensure safety of next tower to prevent from any distortion.
Excavation of earth in mixed soil dry, wet soft and hard rock making foundation including cost of labour tools &plants etc required for proper completion of work.((3*3*2)*6).
Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing. All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). (1*1*2)*6).
Back earth filling after completing of foundation work with ramming, curing etc including all labour and T&P etc.
Supply of MS Steel Bar
Work of breaking CC in Chimney of tower No-128A & 139 B as per instruction of Ptcul Representatives including all labor and T&P etc.
Work of fabrication of required tower stubs, leg for Tower No-128 A &139B including labour and T&P,generator etc. to complete the work.
Work of dismentling of required tower stubs, leg, bressing and members of tower No. 128 A, &139B including labour and T&P etc. to complete the work.
Work of erection and fixing of required stubs, leg for Tower No.128 A & 139B including labour and T&P,drilling, etc. to complete the work.
Providing and Fixing of Pipe type earthing (set of 2 No. for each tower)after completion of work at Tower No-128A including excavation,backfilling & all labour and T&P etc.
Work of tack welding of tower bolts and nut of first section including labour and T&P etc. to complete the work.
PART B
Work of fabrication of required tower Parts for Tower No.77A, 78C, 82C, 114A, 118A, 123A, 125A, 127A, 128 A, 129A,144B including labour and T&P,drilling, including labour and T&P,generator etc. to complete the work.
Work of erection and fixing of missing tower parts, bressing and members for Tower No.77A, 78C, 82C, 114A, 118A, 123A, 125A, 127A, 128 A, 129A,144B including labour and T&P,drilling, etc. to complete the work.
Work of tack welding of tower bolts of Tower No-77A,78C,82C,114A,123A,125A,127A,129A and nut of first section including labour and T&P etc. to complete the work.
PART C
Work of removing dust from Tower leg and making Cooping of towers stubs(T.no-64A, 66B, 69A, 70C, 71C, 72A, 73A, 76A, 77A, 78C, 81C, 82C, 84A, 87A, 89B, 94A, 96C, 101B, 106A, 107A, 112A, 115A, 119B, 124A, 130A,131A,133A,138A including all labour,material,Transportation and T&P etc.
m/s star power solutions (BID ID -353882)
Uttaranchal Construction Company (BID ID -353486)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .