Tender Value
₹27.9 L
EMD Value
₹55,900
Closing Date
11 Jun 2026, 3:00 pm4d left
BNDM: Extension of 140T BD crane shed with provision of Disaster Management Skill Development Centre.
06-EL-WT-2026-27
06-EL-WT-2026-27
Open
180 Days
Unknown (Unspecified Location)
₹0
₹55,900
19 May 2026
19 May 2026
28 May 2026
(Technical & General).]
Item- 1 Erection of the Electrical Items.
S No. Item Description of Item Unit Qty Rate Amount
CKP-DIVN-ELEC/SOUTH EASTERN RLY
1 1 Excavation of cable trench, laying and testing of Metre 2350.00 183.19 430496.50
railway supplied L.T. Cables providing bricks and
sand as per Rly. Drawing's No.CEE/G/A3/P-134.
2 2 Fixing of LT cable on pole/wall by proper Metre 100.00 72.86 7286.00
bracketing arrangement at 50 cm. apart.
3 3 Laying of different type cables across the road Metre 50.00 421.49 21074.50
and Railway track
4 4 Micro drilling across the road & track for Metre 50.00 1874.49 93724.50
excavation of cable trench, laying & testing of
railway supplied LT cables providing suitable
size pipe as per drawing no. CEE/G/A-3/P-134.
5 5 Erection, testing & commissioning of Cable tray Metre 200.00 175.10 35020.00
including all accessories.
6 6 Erection, testing & commissioning of LED based Numbers 4.00 411.80 1647.20
200W Flood light including wiring
7 7 Erection, testing & commissioning of 63A 5 pin Numbers 2.00 72.41 144.82
+SC(scraping earth), 4 module plastic plug &
8 8 Erection, testing & commissioning of 3 Phase Numbers 2.00 69.43 138.86
32A 5 pin+SC (scraping earth), 4module plastic
9 9 Erection, testing & commissioning of 750 mm Air Numbers 6.00 671.58 4029.48
10 10 Erection, testing & commissioning of LED based Numbers 12.00 786.74 9440.88
150 W Highbay light with all accessories.
11 11 Erection, testing & commissioning of 16 watt Numbers 40.00 598.52 23940.80
LED luminaire for under pit lighting.
12 12 Erection, testing & commissioning of 3KVA oil Numbers 4.00 668.21 2672.84
cooled Transformer with all accessories.
13 13 Erection, testing & commissioning of LT Numbers 1.00 14248.58 14248.58
distribution Panel with all accessories.
14 14 Erection, testing & commissioning of location Numbers 2.00 3702.36 7404.72
15 15 Erection, testing & commissioning of 12 way Numbers 2.00 608.59 1217.18
vertical TPN distribution boards with all
accessories including wiring arrangement.
16 16 Erection, testing & commissioning of 4 pole 160A Numbers 4.00 722.67 2890.68
MCCB with all accessories.
17 17 Erection, testing & commissioning of 16 way SPN Numbers 4.00 419.06 1676.24
DB with all accessories including wiring.
18 18 Erection, testing & commissioning 100 A 4 pole Numbers 4.00 93.05 372.20
19 19 Erection, testing & commissioning of 32A DP Numbers 14.00 42.27 591.78
20 20 Erection, testing & commissioning of 20A DP Numbers 20.00 42.27 845.40
21 21 Erection, testing & commissioning of 6A DP MCB. Numbers 20.00 42.23 844.60
22 22 Drawing of main-service line with 2 Nos. 6 sq Metre 100.00 34.71 3471.00
mm & 1 No. 4 sq mm PVC insulated, multi strand
23 23 Drawing of sub-service line 2 Nos. 4 Sqmm & 1 Metre 500.00 36.29 18145.00
No. 2.5 Sq. mm PVC insulated multi strand
copper wire, 25 mm dia heavy duty PVC conduit
24 24 Erection, testing & commissioning of 6A socket Numbers 120.00 237.05 28446.00
and switch including wiring in wiring.
25 25 Supply, erection, testing & commissioning of 16A Numbers 50.00 613.09 30654.50
socket and switch including wiring.
26 26 Erection, testing & commissioning of recessed Numbers 16.00 98.31 1572.96
mounted LED based square type panel light with
all accessories.
27 27 Erection, testing & commissioning of 400 mm Numbers 4.00 68.09 272.36
CKP-DIVN-ELEC/SOUTH EASTERN RLY
28 28 Erection, testing & commissioning of ISI marked Numbers 16.00 68.09 1089.44
5 star rated 3 blades, BLDC ceiling fan with all
29 29 Erection, testing & commissioning of AC exhaust Numbers 6.00 68.09 408.54
fan, 300 mm sweep.
30 30 Erection, testing & commissioning of 1x18w LED Numbers 100.00 57.16 5716.00
Light Fitting & LED Tube Complete Set.
31 31 Erection, testing & commissioning of 9w LED Numbers 4.00 57.16 228.64
based lamp with angular holder.
32 32 Point wiring (Modular) for light point, fan point, Numbers 150.00 652.38 97857.00
exhaust fan point along with all the accessories.
33 33 Erection, testing & commissioning of 20 mtr. Set 2.00 24576.37 49152.74
Long high mast tower with all accessories
including all luminaires.
34 34 Erection of RCC foundation suitable for 20 mtr. Numbers 2.00 18431.66 36863.32
high mast tower considering load bearing
capacity of soil including labour charges.
35 35 Erection, testing & commissioning of three phase Set 2.00 355.76 711.52
astronomical timer based street light panel with
all accessories.
36 36 Transporting, cutting, erection & painting of 2 Numbers 16.00 935.07 14961.12
mtr released Rail pole (supplied by Railway) for
providing at surrounding of high mast tower for
37 37 Erection, testing & commissioning of Numbers 4.00 8163.22 32652.88
maintenance free earthing
38 38 Erection, testing & commissioning of main earth Numbers 8.00 1760.20 14081.60
as per Railway's drawing no. CEE/G/A3/P-134 &
CEE/G/A3/P-150.
39 39 Dismantling concrete kerb stones/ rail level cum 10.00 602.64 6026.40
platform stones /concrete beams /slab /or similar
light structural parts/stones without appreciable
damage including stacking of serviceable
material and disposal of unserviceable material
within 50 m lead.
4 ballast)for make good of damage due to work
with supply of cement, sand & ballast including
41 41 Transportation of materials from Railway store to MT 5.00 3945.03 19725.15
site or other site to work site.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
AttachmentSpecificationCKPDiv_compressed.pdf
ATTACHMENT
MANDATORYACCESSORIESFORBUILDINGWIRING_1.pdf Mandatory Accessories for House Wiring
ATTACHMENT
VENDERMANDATEFORM.pdf
ATTACHMENT
RetiredRailwayEmployeeEngagementCertificate.pdf
ATTACHMENT
SHRAMIKKALYAN.pdf
ATTACHMENT
Tele_Cir_9-20231.pdf
ATTACHMENT
Annexure-VI.pdf
ATTACHMENT
AmendmentinGCCforFinanciaCriteria.pdf
ATTACHMENT
GCCApril2022_2.pdf
ATTACHMENT
AnnexureVIB_1.pdf
ATTACHMENT
AnnexureVIA.pdf
ATTACHMENT
2018_CE-I_CT_9Date04_06_2018.pdf
ATTACHMENT
ACS11GCCWorks2026March1.pdf
ATTACHMENT
TechnicalExplanatoryNote.pdf
ATTACHMENT
GeneralExpNote.pdf
ATTACHMENT
GeneralCondotion.pdf
ATTACHMENT
MANDATORYACCESSORIESFORBUILDINGWIRING_1.pdf
ATTACHMENT
Download all tender documents and submit your bid