Tender Value
₹10.7 Cr
EMD Value
₹5 L
Closing Date
12 Jun 2026, 5:00 pm4d left
Superintending Engineer
Office of the Superintending Engineer, PWD NH
DEPOSIT-6L of Kodungallur to Edapally section of NH-66-Improvement works to existing NH66-Design chainage 400/410 to 407/930-General Civil Work
2026_PWD_854701_1
01 /SE/NH/CC/KOCHI/2026-27
Open Tender
Civil Works - Highways
365 days
EDAPPALLY TO KODUNGALLUR
Please refer Tender documents.
14 documents required · 14 mandatory
₹19,518
₹5 L
Office of the Superintending Engineer, PWD Nationa
6 Jun 2026
6 Jun 2026
15 Jun 2026
6 Jun 2026
12 Jun 2026
6 Jun 2026
6 Jun 2026 - 9 Jun 2026
9 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Road works | ||||||
| 1.001 | 2.3.1.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Manual Means | - | Hectare | - | - | BI01010001010000000000000515BI0100001114 |
| 1.002 | 3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means | - | sqm | - | - | BI01010001010000000000000515BI0100001115 |
| 1.003 | 3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | - | cum | - | - | BI01010001010000000000000515BI0100001116 |
| 1.004 | 4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method | - | cum | - | - | BI01010001010000000000000515BI0100001117 |
| 1.005 | 4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | - | cum | - | - | BI01010001010000000000000515BI0100001118 |
| 1.006 | 55.22:Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete. | - | sqm | - | - | BI01010001010000000000000515BI0100001119 |
| 1.007 | 5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means. | - | sqm | - | - | BI01010001010000000000000515BI0100001120 |
| 1.008 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 0.29 | sqm | - | - | BI01010001010000000000000515BI0100001121 |
| 1.009 | OD214673/2024-2025:Dense bituminous macadam:-For grading II(26.5 mm nominal size) :Providing and laying Dense bituminous macadam with 80-100 TPH HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (VG 40) @4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. | - | cum | - | - | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_1444490.xls
BOQ • 0.33 MB
sbd.pdf
Tender Documents • 1.86 MB
Download all tender documents and submit your bid