Tender Value
₹6.5 L
EMD Value
₹7,000
Closing Date
22 May 2026, 6:00 pmClosed
Executive Engineer, Ahmedabad Irrigation Division, Ahmedabad
Jungle clearance of Vasan Bund, Thuleta Bund, Bharvadi Bund and Earthwork of Vasan Bund, Bharvadi Bund under Sanand Irrigation Sub Division, Sanand.
303231
03 of 2026-27
Open
Miscellaneous Works
Ahmedabad
8 documents required · 6 mandatory · 2 optional
₹900
Executive Engineer, Ahmedabad Irrigation Division, Ahmedabad
₹7,000
8 May 2026
8 May 2026
8 May 2026
22 May 2026
8 May 2026
BILL OF QUANTITY
Name of work:- Jungle clearance of Vasan Bund, Thuleta Bund, Bharvadi Bund and Earthwork of Vasan Bund, Bharvadi
Bund under Sanand Irrigation Sub Division, Sanand
Qty. Item No. Description of Item Unit Rate in Rs. Amount in Rs.
Jungle clearance of specified category and bushes for canal/dam work as directed
with depositing the materials etc. complete (Excluding tree of grith above 0.5 Mt)
0.000 a) Light Dense ha 12553.00
5.100 b) Medium Dense ha 21487.00
5.100 c) Heavy Dense ha 30543.00
Earth work in embankment from borrow pits in all sorts of soil and soft murrum or
other suitable strata as directed including breaking the clods and dressing to the
design sections including cutting the proud section with lead as under and all lift
including site clearing etc. complete. For all canal capacity (a)0 to 30 Mt.
In words Six Lakh Forty Eight Thousands Two hundred Thirty Eight Rupees Only
I/We am/are willing to carry out the work at…… % above/below percent(Should be written in figures and words) of the estimated rate mentioned above.
Amount of my /our tender works out as under.
Estimated amount put to Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement
Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the
cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD Book Bunds.pdf
BOQ Bunds.pdf
Tender notice 03 of 2025-26 for CD and publish.pdf
Download all tender documents and submit your bid