| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.0 CrAccepted-Finance A 701 HINDON APPARTMENT 25 VASUNDHARA ENCLAVE DELHI EAST DELHI DELHI 110096 | EAST DELHI | DELHI | 110096 | ₹22.0 Cr | L1 | Accepted-Finance as per bid submitted |
| 2 | L2₹36.1 Cr+₹14.1 Cr (64.1%)Accepted-Finance | ₹36.1 Cr+₹14.1 Cr (64.1%) | L2 | Accepted-Finance as per bid submitted |
| 3 | L3₹40.0 Cr+₹18.0 Cr (81.8%)Accepted-Finance | ₹40.0 Cr+₹18.0 Cr (81.8%) | L3 | Accepted-Finance as per bid submitted |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not qualified for non-compliance to similar works criteria |
| 5 | Rejected-Technical E148 SECTOR 63 NOIDA UP 201301 E148 SECTOR 63 NOIDA UP 201301 E148 SECTOR 63 NOIDA UP 201301 NOIDA GAUTAM BUDH NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | - | - | Rejected-Technical Not qualified for non-compliance to similar works criteria |
| Sl No | Description | Qty | Unit | Green Power International Pvt. Ltd. L1 | Tuaman Engineering Limited L3 | DVC PROCESS TECHNOLOGISTS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Compressed Air system : Two Screw type air compressrors (1W+1SB) of 150 Nm3/h capacity at 8.5 bar (g) pressure comprising among others the following:
Design, engineering, manufacturing, inspection, supply & transportation to site, unloading at site, storage, transportation inside plant, installation, erection, testing & commissioning, performance guarantee of Compressed Air (CA) system including screw compressors with desiccant dryers, four compressed air receivers of 10 m3 capacity, associated piping & valves, electrical system including local electrical panel, instrumentations & controls, structural works, painting works etc., as per the detailed technical specifications provided in Section-V, Chapter 2.1. The quoted rate against this milestone can be divided into following sub-milestones.
The bidder shall quote for the above as one Set considering it as one milestone. The given milestone is further divided into following sub-milestones for the purpose of payment break-up only. The bidder shall not quote according to the sub-milestones given below, rather, a lump sum price for the entire set mentioned above should be quoted.
1. Submission of design and engineering documents duly approved by BARC (5%)
2. Supply of system/s along with its accessories (as applicable) to BARC's site (payment against production of inspection memo and materials receipt & acceptance report by BARC) (30%)
3. Installation, erection, testing & commissioning of entire system under the milestone duly approved by BARC (55%)
4. Balance 10% on completion of overall integration of utility and other systems as per the scope upon approval from BARC. | 1 | Set | 1,05,86,000 ₹1,05,86,000 Lowest | 2,09,17,721 ₹2,09,17,721 | 2,04,13,000 ₹2,04,13,000 |
| 2.00 | Gaseous Nitrogen generation system: High purity Gaseous nitrogen generation system with capacity of 500 Nm3/h at 99.999% purity comprising among others the following: Design, engineering, manufacturing, inspection, supply & transportation to site, unloading at site, storage, transportation inside plant, installation, erection, testing & commissioning, performance guarantee of Gas Nitrogen (GN) generation system including PSA based nitrogen generation plant [one (01) set] with suitable Ammonia cracker for high purity nitrogen, Four (04) numbers of nitrogen receivers (30 m3 capacity), associated piping & valves, electrical system including local electrical panel, instrumentations & controls, structural works, painting works etc., as per the detailed technical specifications provided in Section-V, Chapter 2.2.
The bidder shall quote for the above as one Set considering it as one milestone. The given milestone is further divided into following sub-milestones for the purpose of payment break-up only. The bidder shall not quote according to the sub-milestones given below, rather, a lump sum price for the entire set mentioned above should be quoted.
1. Submission of design and engineering documents duly approved by BARC (5%)
2. Supply of system/s along with its accessories (as applicable) to BARC's site (payment against production of inspection memo and materials receipt & acceptance report by BARC) (30%)
3. Installation, erection, testing & commissioning of entire system under the milestone duly approved by BARC (55%)
4. Balance 10% on completion of overall integration of utility and other systems as per the scope upon approval from BARC. | 1 | Set | 7,50,20,000 ₹7,50,20,000 | 6,51,38,847 ₹6,51,38,847 Lowest | 8,60,83,000 ₹8,60,83,000 |
| 3.00 | De-Mineralised Water (DMW) generation system: DM water generation plant of 5m3/h production rate (1W + 1S under regeneration) with Design, engineering, manufacturing, inspection, supply & transportation to site, unloading at site, storage, transportation inside plant, installation, erection, testing & commissioning, performance guarantee of De-Mineralised Water (DMW) generation system including DMW plant, raw water tank, DMW storage tanks, associated pumps, associated piping & valves, electrical system including local electrical panel, instrumentations & controls, structural works, painting works etc., as per the technical specifications provided in Section-V, Chapter 2.3.
The bidder shall quote for the above as one Set considering it as one milestone. The given milestone is further divided into following sub-milestones for the purpose of payment break-up only. The bidder shall not quote according to the sub-milestones given below, rather, a lump sum price for the entire set mentioned above should be quoted.
1. Submission of design and engineering documents duly approved by BARC (5%)
2. Supply of system/s along with its accessories (as applicable) to BARC's site (payment against production of inspection memo and materials receipt & acceptance report by BARC) (25%)
3. Installation, erection, testing & commissioning of entire system under the milestone duly approved by BARC (60%)
4. Balance 10% on completion of overall integration of utility and other systems as per the scope upon approval from BARC. | 1 | Set | 2,33,35,000 ₹2,33,35,000 | 2,39,06,188 ₹2,39,06,188 | 1,68,14,000 ₹1,68,14,000 Lowest |
| 4.00 | Process Chilled Water (PCW) generation system: Design, engineering, manufacturing, inspection, supply & transportation to site, unloading at site, storage, transportation inside plant, installation, erection, testing & commissioning, performance guarantee of Process Chilled Water (PCW) generation system of 100 TR (2 Sets, 1 W + 1 S) including water cooled chillers, primary chilled water pumps, condenser water pumps, associated piping & valves, electrical system including local electrical panel, instrumentations & controls, structural works, painting works etc., as per the technical specifications provided in Section-V, Chapter 2.4.
The bidder shall quote for the above as one Set considering it as one milestone. The given milestone is further divided into following sub-milestones for the purpose of payment break-up only. The bidder shall not quote according to the sub-milestones given below, rather, a lump sum price for the entire set mentioned above should be quoted.
1. Submission of design and engineering documents duly approved by BARC (5%)
2. Supply of system/s along with its accessories (as applicable) to BARC's site (payment against production of inspection memo and materials receipt & acceptance report by BARC) (25%)
3. Installation, erection, testing & commissioning of entire system under the milestone duly approved by BARC (60%)
4. Balance 10% on completion of overall integration of utility and other systems as per the scope upon approval from BARC. | 1 | Set | 1,01,42,000 ₹1,01,42,000 | 2,59,98,836 ₹2,59,98,836 | 96,72,000 ₹96,72,000 Lowest |
| 5.00 | Cooling Water system: Design, engineering, manufacturing, inspection, supply & transportation to site, unloading at site, storage, transportation inside plant, installation, erection, testing & commissioning, performance guarantee of 150m3/h capacity Cooling Water (CW) system (02 sets, 1W + 1 S) & 80 m3/h cooling water system (02 sets, 1W + 1 S) including cooling towers, cooling water supply pumps, accessories, associated piping & valves, electrical system including local electrical panel, instrumentations & controls, all civil & structural works, painting works etc., as per the technical specifications provided in Section-V, Chapter 2.5.
Note: Construction of cold water basin is not in the scope of this contract.
The bidder shall quote for the above as one Set considering it as one milestone. The given milestone is further divided into following sub-milestones for the purpose of payment break-up only. The bidder shall not quote according to the sub-milestones given below, rather, a lump sum price for the entire set mentioned above should be quoted.
1. Submission of design and engineering documents duly approved by BARC (5%)
2. Supply of system/s along with its accessories (as applicable) to BARC's site (payment against production of inspection memo and materials receipt & acceptance report by BARC) (25%)
3. Installation, erection, testing & commissioning of entire system under the milestone duly approved by BARC (60%)
4. Balance 10% on completion of overall integration of utility and other systems as per the scope upon approval from BARC. | 1 | Set | 80,74,000 ₹80,74,000 | 2,07,76,768 ₹2,07,76,768 | 78,93,000 ₹78,93,000 Lowest |
| 6.00 | Steam Generation system: Design, engineering, manufacturing, inspection, supply & transportation to site, unloading at site, storage, transportation inside plant, installation, erection, testing & commissioning, performance guarantee of Steam (St) generation system of capacity 1.5 TPH at 12 bar (02 sets, 1W + 1SB) including steam boilers, feed water system, feed fuel oil system, drain & safety system, flue gas system, associated auxiliaries, piping & valves, electrical system including local electrical panel, instrumentations & controls, structural works, painting works etc., as per the technical specifications provided in Section-V, Chapter 2.6.
The bidder shall quote for the above as one Set considering it as one milestone. The given milestone is further divided into following sub-milestones for the purpose of payment break-up only. The bidder shall not quote according to the sub-milestones given below, rather, a lump sum price for the entire set mentioned above should be quoted.
1. Submission of design and engineering documents duly approved by BARC (5%)
2. Supply of system/s along with its accessories (as applicable) to BARC's site (payment against production of inspection memo and materials receipt & acceptance report by BARC) (30%)
3. Installation, erection, testing & commissioning of entire system under the milestone duly approved by BARC (55%)
4. Balance 10% on completion of overall integration of utility and other systems as per the scope upon approval from BARC. | 1 | Set | 2,78,90,000 ₹2,78,90,000 Lowest | 5,95,45,076 ₹5,95,45,076 | 4,26,42,000 ₹4,26,42,000 |
| 7.00 | Utility Piping & Piping Components: Design, engineering, manufacturing, inspection, supply & transportation to site, unloading at site, storage, installation, erection, testing & commissioning, performance guarantee of complete Utility Piping including piping supports, insulation (as applicable), fittings, valves, structural overhead supports wherever road crossing is present, associated electrical, instrumentations & controls, civil foundation & structural works, painting works etc. as required, as per the technical specifications provided in Section-V, Chapter 3. Spares are also in the scope of this contract but no separate payment shall be given. Refer to chapter 3 for spare details.
The bidder shall quote for the above as one Set considering it as one milestone. The given milestone is further divided into following sub-milestones for the purpose of payment break-up only. The bidder shall not quote according to the sub-milestones given below, rather, a lump sum price for the entire set mentioned above should be quoted.
1. Submission of design and engineering documents duly approved by BARC (5%)
2. Supply of system/s along with its accessories (as applicable) to BARC's site (payment against production of inspection memo and materials receipt & acceptance report by BARC) (20%)
3. Installation, erection, testing & commissioning of entire system under the milestone duly approved by BARC (65%)
4. Balance 10% on completion of overall integration of utility and other systems as per the scope upon approval from BARC. | 1 | Set | 1,10,30,000 ₹1,10,30,000 Lowest | 4,12,82,805 ₹4,12,82,805 | 10,98,71,000 ₹10,98,71,000 |
| 8.00 | MATERIAL HANDLING EQUIPMENT (MHE): Design, engineering, manufacturing, inspection, supply & transportation to site, unloading at site, storage, transportation inside plant, installation, erection, testing & commissioning, performance guarantee of Material Handling Equipment (MHE) including Double Girder Electric Overhead Travelling (DGEOT) crane, Electrical hoists, associated electrical, instrumentations & controls, painting works etc., as per the technical specifications provided in Section-V, Chapter 4.
The bidder shall quote for the above as one Set considering it as one milestone. The given milestone is further divided into following sub-milestones for the purpose of payment break-up only. The bidder shall not quote according to the sub-milestones given below, rather, a lump sum price for the entire set mentioned above should be quoted.
1. Submission of design and engineering documents duly approved by BARC (2%)
2. Supply of system/s along with its accessories (as applicable) to BARC's site (payment against production of inspection memo and materials receipt & acceptance report by BARC) (38%)
3. Installation, erection, testing & commissioning of entire system under the milestone duly approved by BARC (50%)
4. Balance 10% on completion of overall integration of utility and other systems as per the scope upon approval from BARC. | 1 | Set | 1,45,10,000 ₹1,45,10,000 Lowest | 2,87,22,538 ₹2,87,22,538 | 1,55,53,000 ₹1,55,53,000 |
| 9.00 | FIRE FIGHTING SYSTEM: Design of Fire fighting hydrant system, engineering, manufacturing, inspection, supply & transportation to site, unloading at site, storage, installation, erection, testing & commissioning, performance guarantee of complete Fire Hydrant network including piping supports, fittings, valves, structural overhead supports wherever road crossing is present, civil foundation & structural works, painting works etc. as required, as per the technical specifications provided in Section-V, Chapter 5.
The bidder shall quote for the above as one Set considering it as one milestone. The given milestone is further divided into following sub-milestones for the purpose of payment break-up only. The bidder shall not quote according to the sub-milestones given below, rather, a lump sum price for the entire set mentioned above should be quoted.
1. Submission of design and engineering documents duly approved by BARC (5%)
2. Supply of system/s along with its accessories (as applicable) to BARC's site (payment against production of inspection memo and materials receipt & acceptance report by BARC) (20%)
3. Installation, erection, testing & commissioning of entire system under the milestone duly approved by BARC (65%)
4. Balance 10% on completion of overall integration of utility and other systems as per the scope upon approval from BARC. | 1 | Set | 81,15,000 ₹81,15,000 Lowest | 1,97,93,053 ₹1,97,93,053 | 3,27,57,000 ₹3,27,57,000 |
| 10.00 | CONTROL & INSTRUMENTATION SYSTEM: Design, engineering, manufacturing, inspection, supply & transportation to site, unloading at site, storage, installation, erection, testing & commissioning, performance guarantee of complete Control & Instrumentation (C&I) System including field instrumentation, HMI field panels, field junction boxes, field I/Os modules, RIO panels, PLC system & panels, switch panels, control room layouts, SCADA system, operator station, engineering station, display, cabling & cable tray installation, associated electrical & structural works etc., as per the technical specifications provided in Section-V, Chapter 6.
The bidder shall quote for the above as one Set considering it as one milestone. The given milestone is further divided into following sub-milestones for the purpose of payment break-up only. The bidder shall not quote according to the sub-milestones given below, rather, a lump sum price for the entire set mentioned above should be quoted.
1. Submission of design and engineering documents duly approved by BARC (5%)
2. Supply of system/s along with its accessories (as applicable) to BARC's site (payment against production of inspection memo and materials receipt & acceptance report by BARC) (30%)
3. Installation, erection, testing & commissioning of entire system under the milestone duly approved by BARC (55%)
4. Balance 10% on completion of overall integration of utility and other systems as per the scope upon approval from BARC. | 1 | Set | 2,36,00,000 ₹2,36,00,000 | 6,76,09,610.2 ₹6,76,09,610.2 | 1,13,12,000 ₹1,13,12,000 Lowest |
Tender Value
₹27 Cr
EMD Value
₹41.9 L
Closing Date
17 Jul 2025, 3:00 pmClosed
Chief Engineer. BARC, Mysuru
Chief Engineer, Bhabha Atomic Research Centre, Mysuru, P.B No 1, Yelwal, Mysuru 571130.
Design, Engineering, Manufacturing/Fabrication, Supply, Installation, Erection, Testing Commissioning etc. of Utility systems, Utility Piping, Fire Fighting systems, Material Handling Equipment, Electrical, Control Instrumentation systems
2025_BARC_861822_1
BARC/SMFC/Utl/01/2025-26/NIT
Open Tender
Machineries/ Mechanical Engg Items
EPC Contract
455 days
Special Materials Facility, BARC, DoddUllarthi.
Please refer NIT and tender document
8 documents required · 8 mandatory
₹0
₹41.9 L
Yes
BARC, Mysuru, Yelwal, Mysuru-571130
6 Jul 2026
28 May 2025
25 Jul 2025
28 May 2025
17 Jul 2025
12 Jun 2025
28 May 2025 - 10 Jun 2025
11 Jun 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Compressed Air system : Two Screw type air compressrors (1W+1SB) of 150 Nm3/h capacity at 8.5 bar (g) pressure comprising among others the following:
Design, engineering, manufacturing, inspection, supply & transportation to site, unloading at site, storage, transportation inside plant, installation, erection, testing & commissioning, performance guarantee of Compressed Air (CA) system including screw compressors with desiccant dryers, four compressed air receivers of 10 m3 capacity, associated piping & valves, electrical system including local electrical panel, instrumentations & controls, structural works, painting works etc., as per the detailed technical specifications provided in Section-V, Chapter 2.1. The quoted rate against this milestone can be divided into following sub-milestones.
The bidder shall quote for the above as one Set considering it as one milestone. The given milestone is further divided into following sub-milestones for the purpose of payment break-up only. The bidder shall not quote according to the sub-milestones given below, rather, a lump sum price for the entire set mentioned above should be quoted.
1. Submission of design and engineering documents duly approved by BARC (5%)
2. Supply of system/s along with its accessories (as applicable) to BARC's site (payment against production of inspection memo and materials receipt & acceptance report by BARC) (30%)
3. Installation, erection, testing & commissioning of entire system under the milestone duly approved by BARC (55%)
4. Balance 10% on completion of overall integration of utility and other systems as per the scope upon approval from BARC. | 1 | Set | - | - |
| 2 | Gaseous Nitrogen generation system: High purity Gaseous nitrogen generation system with capacity of 500 Nm3/h at 99.999% purity comprising among others the following: Design, engineering, manufacturing, inspection, supply & transportation to site, unloading at site, storage, transportation inside plant, installation, erection, testing & commissioning, performance guarantee of Gas Nitrogen (GN) generation system including PSA based nitrogen generation plant [one (01) set] with suitable Ammonia cracker for high purity nitrogen, Four (04) numbers of nitrogen receivers (30 m3 capacity), associated piping & valves, electrical system including local electrical panel, instrumentations & controls, structural works, painting works etc., as per the detailed technical specifications provided in Section-V, Chapter 2.2.
The bidder shall quote for the above as one Set considering it as one milestone. The given milestone is further divided into following sub-milestones for the purpose of payment break-up only. The bidder shall not quote according to the sub-milestones given below, rather, a lump sum price for the entire set mentioned above should be quoted.
1. Submission of design and engineering documents duly approved by BARC (5%)
2. Supply of system/s along with its accessories (as applicable) to BARC's site (payment against production of inspection memo and materials receipt & acceptance report by BARC) (30%)
3. Installation, erection, testing & commissioning of entire system under the milestone duly approved by BARC (55%)
4. Balance 10% on completion of overall integration of utility and other systems as per the scope upon approval from BARC. | 1 | Set | - | - |
| 3 | De-Mineralised Water (DMW) generation system: DM water generation plant of 5m3/h production rate (1W + 1S under regeneration) with Design, engineering, manufacturing, inspection, supply & transportation to site, unloading at site, storage, transportation inside plant, installation, erection, testing & commissioning, performance guarantee of De-Mineralised Water (DMW) generation system including DMW plant, raw water tank, DMW storage tanks, associated pumps, associated piping & valves, electrical system including local electrical panel, instrumentations & controls, structural works, painting works etc., as per the technical specifications provided in Section-V, Chapter 2.3.
The bidder shall quote for the above as one Set considering it as one milestone. The given milestone is further divided into following sub-milestones for the purpose of payment break-up only. The bidder shall not quote according to the sub-milestones given below, rather, a lump sum price for the entire set mentioned above should be quoted.
1. Submission of design and engineering documents duly approved by BARC (5%)
2. Supply of system/s along with its accessories (as applicable) to BARC's site (payment against production of inspection memo and materials receipt & acceptance report by BARC) (25%)
3. Installation, erection, testing & commissioning of entire system under the milestone duly approved by BARC (60%)
4. Balance 10% on completion of overall integration of utility and other systems as per the scope upon approval from BARC. | 1 | Set | - | - |
| 4 | Process Chilled Water (PCW) generation system: Design, engineering, manufacturing, inspection, supply & transportation to site, unloading at site, storage, transportation inside plant, installation, erection, testing & commissioning, performance guarantee of Process Chilled Water (PCW) generation system of 100 TR (2 Sets, 1 W + 1 S) including water cooled chillers, primary chilled water pumps, condenser water pumps, associated piping & valves, electrical system including local electrical panel, instrumentations & controls, structural works, painting works etc., as per the technical specifications provided in Section-V, Chapter 2.4.
The bidder shall quote for the above as one Set considering it as one milestone. The given milestone is further divided into following sub-milestones for the purpose of payment break-up only. The bidder shall not quote according to the sub-milestones given below, rather, a lump sum price for the entire set mentioned above should be quoted.
1. Submission of design and engineering documents duly approved by BARC (5%)
2. Supply of system/s along with its accessories (as applicable) to BARC's site (payment against production of inspection memo and materials receipt & acceptance report by BARC) (25%)
3. Installation, erection, testing & commissioning of entire system under the milestone duly approved by BARC (60%)
4. Balance 10% on completion of overall integration of utility and other systems as per the scope upon approval from BARC. | 1 | Set | - | - |
| 5 | Cooling Water system: Design, engineering, manufacturing, inspection, supply & transportation to site, unloading at site, storage, transportation inside plant, installation, erection, testing & commissioning, performance guarantee of 150m3/h capacity Cooling Water (CW) system (02 sets, 1W + 1 S) & 80 m3/h cooling water system (02 sets, 1W + 1 S) including cooling towers, cooling water supply pumps, accessories, associated piping & valves, electrical system including local electrical panel, instrumentations & controls, all civil & structural works, painting works etc., as per the technical specifications provided in Section-V, Chapter 2.5.
Note: Construction of cold water basin is not in the scope of this contract.
The bidder shall quote for the above as one Set considering it as one milestone. The given milestone is further divided into following sub-milestones for the purpose of payment break-up only. The bidder shall not quote according to the sub-milestones given below, rather, a lump sum price for the entire set mentioned above should be quoted.
1. Submission of design and engineering documents duly approved by BARC (5%)
2. Supply of system/s along with its accessories (as applicable) to BARC's site (payment against production of inspection memo and materials receipt & acceptance report by BARC) (25%)
3. Installation, erection, testing & commissioning of entire system under the milestone duly approved by BARC (60%)
4. Balance 10% on completion of overall integration of utility and other systems as per the scope upon approval from BARC. | 1 | Set | - | - |
| 6 | Steam Generation system: Design, engineering, manufacturing, inspection, supply & transportation to site, unloading at site, storage, transportation inside plant, installation, erection, testing & commissioning, performance guarantee of Steam (St) generation system of capacity 1.5 TPH at 12 bar (02 sets, 1W + 1SB) including steam boilers, feed water system, feed fuel oil system, drain & safety system, flue gas system, associated auxiliaries, piping & valves, electrical system including local electrical panel, instrumentations & controls, structural works, painting works etc., as per the technical specifications provided in Section-V, Chapter 2.6.
The bidder shall quote for the above as one Set considering it as one milestone. The given milestone is further divided into following sub-milestones for the purpose of payment break-up only. The bidder shall not quote according to the sub-milestones given below, rather, a lump sum price for the entire set mentioned above should be quoted.
1. Submission of design and engineering documents duly approved by BARC (5%)
2. Supply of system/s along with its accessories (as applicable) to BARC's site (payment against production of inspection memo and materials receipt & acceptance report by BARC) (30%)
3. Installation, erection, testing & commissioning of entire system under the milestone duly approved by BARC (55%)
4. Balance 10% on completion of overall integration of utility and other systems as per the scope upon approval from BARC. | 1 | Set | - | - |
| 7 | Utility Piping & Piping Components: Design, engineering, manufacturing, inspection, supply & transportation to site, unloading at site, storage, installation, erection, testing & commissioning, performance guarantee of complete Utility Piping including piping supports, insulation (as applicable), fittings, valves, structural overhead supports wherever road crossing is present, associated electrical, instrumentations & controls, civil foundation & structural works, painting works etc. as required, as per the technical specifications provided in Section-V, Chapter 3. Spares are also in the scope of this contract but no separate payment shall be given. Refer to chapter 3 for spare details.
The bidder shall quote for the above as one Set considering it as one milestone. The given milestone is further divided into following sub-milestones for the purpose of payment break-up only. The bidder shall not quote according to the sub-milestones given below, rather, a lump sum price for the entire set mentioned above should be quoted.
1. Submission of design and engineering documents duly approved by BARC (5%)
2. Supply of system/s along with its accessories (as applicable) to BARC's site (payment against production of inspection memo and materials receipt & acceptance report by BARC) (20%)
3. Installation, erection, testing & commissioning of entire system under the milestone duly approved by BARC (65%)
4. Balance 10% on completion of overall integration of utility and other systems as per the scope upon approval from BARC. | 1 | Set | - | - |
| 8 | MATERIAL HANDLING EQUIPMENT (MHE): Design, engineering, manufacturing, inspection, supply & transportation to site, unloading at site, storage, transportation inside plant, installation, erection, testing & commissioning, performance guarantee of Material Handling Equipment (MHE) including Double Girder Electric Overhead Travelling (DGEOT) crane, Electrical hoists, associated electrical, instrumentations & controls, painting works etc., as per the technical specifications provided in Section-V, Chapter 4.
The bidder shall quote for the above as one Set considering it as one milestone. The given milestone is further divided into following sub-milestones for the purpose of payment break-up only. The bidder shall not quote according to the sub-milestones given below, rather, a lump sum price for the entire set mentioned above should be quoted.
1. Submission of design and engineering documents duly approved by BARC (2%)
2. Supply of system/s along with its accessories (as applicable) to BARC's site (payment against production of inspection memo and materials receipt & acceptance report by BARC) (38%)
3. Installation, erection, testing & commissioning of entire system under the milestone duly approved by BARC (50%)
4. Balance 10% on completion of overall integration of utility and other systems as per the scope upon approval from BARC. | 1 | Set | - | - |
| 9 | FIRE FIGHTING SYSTEM: Design of Fire fighting hydrant system, engineering, manufacturing, inspection, supply & transportation to site, unloading at site, storage, installation, erection, testing & commissioning, performance guarantee of complete Fire Hydrant network including piping supports, fittings, valves, structural overhead supports wherever road crossing is present, civil foundation & structural works, painting works etc. as required, as per the technical specifications provided in Section-V, Chapter 5.
The bidder shall quote for the above as one Set considering it as one milestone. The given milestone is further divided into following sub-milestones for the purpose of payment break-up only. The bidder shall not quote according to the sub-milestones given below, rather, a lump sum price for the entire set mentioned above should be quoted.
1. Submission of design and engineering documents duly approved by BARC (5%)
2. Supply of system/s along with its accessories (as applicable) to BARC's site (payment against production of inspection memo and materials receipt & acceptance report by BARC) (20%)
3. Installation, erection, testing & commissioning of entire system under the milestone duly approved by BARC (65%)
4. Balance 10% on completion of overall integration of utility and other systems as per the scope upon approval from BARC. | 1 | Set | - | - |
| 10 | CONTROL & INSTRUMENTATION SYSTEM: Design, engineering, manufacturing, inspection, supply & transportation to site, unloading at site, storage, installation, erection, testing & commissioning, performance guarantee of complete Control & Instrumentation (C&I) System including field instrumentation, HMI field panels, field junction boxes, field I/Os modules, RIO panels, PLC system & panels, switch panels, control room layouts, SCADA system, operator station, engineering station, display, cabling & cable tray installation, associated electrical & structural works etc., as per the technical specifications provided in Section-V, Chapter 6.
The bidder shall quote for the above as one Set considering it as one milestone. The given milestone is further divided into following sub-milestones for the purpose of payment break-up only. The bidder shall not quote according to the sub-milestones given below, rather, a lump sum price for the entire set mentioned above should be quoted.
1. Submission of design and engineering documents duly approved by BARC (5%)
2. Supply of system/s along with its accessories (as applicable) to BARC's site (payment against production of inspection memo and materials receipt & acceptance report by BARC) (30%)
3. Installation, erection, testing & commissioning of entire system under the milestone duly approved by BARC (55%)
4. Balance 10% on completion of overall integration of utility and other systems as per the scope upon approval from BARC. | 1 | Set | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_906089.xls
BOQ • 0.30 MB
171647787.pdf
Tender Documents • 0.62 MB
171647792.html
Tender Documents • 0.07 MB
174278194.pdf
Tender Documents • 0.36 MB
2TenderDocument2.pdf
Tender Documents • 2.72 MB
3TenderDocument3.pdf
Tender Documents • 5.80 MB
4TenderDocument4.pdf
Tender Documents • 0.20 MB
5TechnoCommercialBidDataSheet.xls
Tender Documents • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .