Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.1 LAccepted-AOC MATHIYA RASDA BALLIA | RASDA | BALLIA | UTTAR PRADESH | ₹62.1 L | L1 | Accepted-AOC AOC |
| 2 | L2₹64.3 L+₹2.2 L (3.58%)Rejected-Finance GONDA CIRCLE PWD GONDA UTTAR PRADESH UP | GONDA | UTTAR PRADESH | 271001 | ₹64.3 L+₹2.2 L (3.58%) | L2 | Rejected-Finance HIGH RATE |
Tender Value
₹64 L
EMD Value
₹5.2 L
Closing Date
1 Jun 2026, 12:00 pmClosed
Superintending Engineer
S.E. Ballia Circle, P.W.D. Ballia
Construction of a new culvert to replace the damaged one on the Chandrawar Sonapali to Tiyara road in the Ballia district
2026_CEUAZ_1149570_1
2276/NIVIDA (PD)/BALLIA CIRCLE/2026 DATE 12.05.2026
Open Tender
Civil Works - Bridges
Fixed-rate
180 days
BALLIA
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,590
₹5.2 L
S.E. Ballia Circle, P.W.D. Ballia
8 Jul 2026
25 May 2026
1 Jun 2026
25 May 2026
1 Jun 2026
25 May 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentalling brick work or store work in lime or cement mortar and including stacking of materials as directed by the Engineer-incharge within a distance of 60M. (200feet) as per S.I.NO. 692 | 171.4 | cum | 425 | ₹72,845 |
| 2 | Dismentalling reinforced cement concrete or rei nforced brick work including stacking of materials as directed by the Engineer-incharge within a distance of 60M. (200 feet) as per S.I.NO. 694 | 35.2 | cum | 970 | ₹34,144 |
| 3 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the exca | 300.7 | cum | 140 | ₹42,098 |
| 4 | G.S.B.(Granular sub base) For filling in foundation trenches as per drawing and technical specification | 103.9 | cum | 2,445.6 | ₹2,54,097.84 |
| 5 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 20.3 | cum | 6,981 | ₹1,41,714.3 |
| 6 | RCC Grade M30 in foundation using batching plant transit mixer & manual placing | 88.6 | cum | 10,135 | ₹8,97,961 |
| 7 | RCC Grade M30 in Super Structure using batching plant transit mixer & manual placing | 158.1 | cum | 11,223 | ₹17,74,356.3 |
| 8 | RCC Grade M35 in wearing coat using batching plant transit mixer & manual placing | 11.5 | cum | 10,265 | ₹1,18,047.5 |
| 9 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. | 24.1 | M.T. | 70,204 | ₹16,91,916.4 |
| 10 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical | 75.1 | R.M. | 159.1 | ₹11,948.41 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
T2.pdf
Tender Documents • 1.25 MB
BOQ_2152052.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .