| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 CrAccepted-AOC A 27 NAVBHARAT APARTMENT R C MARG CHEMBUR MUMBAI MAHARASHTRA MUMBAI MAHARASHTRA 400074 | MUMBAI SUBURBAN | MAHARASHTRA | 400074 | ₹4.7 Cr Quoted ₹4.9 Cr | L1 | Accepted-AOC the rate given are reasonable and acceptable |
| 2 | L2₹5.3 Cr+₹31.1 L (6.30%)Rejected-Finance M2ZX4 OPP DUKES PEPSI COMPANY WAMAN TUKARAM PATIL MARG AMAR NAGAR CHEMBUR MUMBAI MAHARASHTRA 400071 | MUMBAI SUBURBAN | MAHARASHTRA | 400071 | ₹5.3 Cr+₹31.1 L (6.30%) | L2 | Rejected-Finance Second lowest bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical Techno-commercially not suitable |
| 4 | Rejected-Technical 103 104 ANNA BHAVAN BHARUCH STREET MASJID BUNDER EAST MUMBAI MUMBAI MAHARASHTRA 400009 | MUMBAI | MAHARASHTRA | 400009 | - | - | Rejected-Technical Techno-commercially not suitable |
Tender Value
Refer Docs
EMD Value
₹3 L
Closing Date
3 Jan 2020, 11:00 amClosed
V.D.GADEKAR
Room no.02,Technical Building,Trombay Unit,RCF
Biannual rate contract to carry out various jobs in Suphala, ANP and Urea Bagging plants for the year 2020-2021
2019_RCFL_526967_1
ET-TS/Prod/Bagging-Activity/20
Open Tender
Miscellaneous Services
Lump-sum
730 days
RCF TROMBAY UNIT
Please refer Tender documents.
13 documents required · 13 mandatory
₹0
₹3 L
Yes
20 Mar 2020
13 Dec 2019
3 Jan 2020
13 Dec 2019
3 Jan 2020
13 Dec 2019
Amount
Suphala Bagging: Cleaning of loading platform starting from Pillar 'A' (near priyadarshini end to Pillar 'Z' (near Control room) and extended loading platform (near Wagon Loader No.# 5), collection and filling of material in bags and shifting of filled bags to the designated place in plant.
Suphala Bagging: Cleaning of all three slats and adjacent slat area, collection and filling of material in bags and shifting of filled bags to the designated place in plant.
Suphala Bagging: Thorough cleaning of equipment which includes Wagon Loader (5 Nos.), Truck Loaders (2 Nos.) and Belt Conveyor decking plate & gantry (11 Nos.), collection and filling of material in bags and shifting of filled materials to the designated place in plant.
Suphala Bagging: Removal of product scaling to the bunkers (3 bunkers each of 100 MT capacity), filling in bags and shifting of filled bags to the designated place in plant.
Suphala Bagging: Filling of spilled lumpy material in bags from weighing floor, transfer towers (I & II), below gantries and near vibrating screen. Loading these filled bags into trucks and unloading it at designated area.
Suphala Bagging: Loading / Unloading of filled spillage & waste material bags into trucks at designated area.
Suphala Bagging: Assisting in lubrication activity between 8:00am to 5:00pm
Suphala Bagging: Slat 4 - Cleaning & maintaining in healthy condition includes cleaning of complete belt, removing stucked bags & ensuring minimum spillage, cleaning of rollers & decking plates etc.
Suphala Bagging: Cleaning of spillages, breaking lumps inside chute of NP-3A conveyor belt, discharge chute.
ANP Bagging:Cleaning of loading platform, collection and filling of material in bags and shifting of filled bags to the designated place in plant.
ANP Bagging:Cleaning & maintaining of RBC 10 (East side) in healthy condition which includes cleaning of complete belt, removing of stucked bags & ensuring minimum spillage, cleaning of rollers & decking plates etc.
ANP Bagging:Removal of product scaling of the bunkers (3 bunkers each of 30 MT capacity), filling in bags and shifting of filled bags to the designated place in plant.
ANP Bagging:Filling of spilled lumpy material in bags from weighing floor, all transfer towers, below gantries. Loading these filled bags into trucks and unloading it at designated area.
ANP Bagging:Loading / Unloading of sweeping & waste material bags into trucks at designated area.
ANP Bagging:Cleaning of Scrapper boom (including all blades, rollers, chain etc.)
ANP Bagging:Cleaning of Scrapper bucket elevator (including all buckets, chain, links etc.)
ANP Bagging:Assisting in lubrication activity between 8:00am to 5:00pm
ANP Bagging:Cleaning of spillages near scrapper wheel, gear box, discharge chute, discharge conveyor decking plates.
ANP Bagging:Cleaning of spillages, breaking lumps inside chute of ET-6A conveyor belt, discharge chute.
Urea Bagging: Cleaning of loading platform , collection and filling of material in bags and shifting of filled bags to the designated place in plant.
Urea Bagging: Removal of product scaling of the bunkers (4 bunkers each of 30 MT capacity), filling in bags and shifting of filled bags to the designated place in plant.
Urea Bagging: Filling of spilled lumpy & dusty material in bags from weighing floor, all transfer towers, below gantries. Loading these filled bags into trucks and unloading it at designated area.
Urea Bagging: Cleaning of Scrapper boom (including all blades, rollers, chain etc.)
Urea Bagging: Cleaning of Scrapper bucket elevator (including all buckets, chain, links etc.)
Urea Bagging:Cleaning & maintaining of RBC 1 (east side) in healthy condition: includes cleaning of complete belt,removing stucked bags & ensuring minmum spillage,cleaninig of rollers & decking plates etc.
Urea Bagging:Cleaning & maintaining of RBC 2 (west side) in healthy condition: includes cleaning of compleate belt,removing stucked bags & ensuring minmum spillage,cleaninig of rollers & decking plates etc.
Urea Bagging: Collection and filling of spilled Neem oil,if any, in drums & shifting to the designated place as instructed by RCF officials. Cleaning adjoining area near Neem oil tanks along with removal of sludge on regular basis
Urea Bagging: Assisiting in lubrication activity between 8:00am to 5:00pm
Urea Bagging: Cleaning of spillages near scrapper wheel, gear box, discharge chute, discharge conveyor decking plates.
Urea Bagging: Vertical Storage hopper in Urea silo - Cleaning Maintenance , Hammering and spillage collection at top , bottom & surrounding area of hopper.
Continent Engineers
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .