Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹99,060Accepted-AOC | ₹99,060 Quoted ₹99,060.36 | L1 | Accepted-AOC L1 |
| 2 | L2₹1.0 LRejected-AOC | ₹1.0 L | L2 | Rejected-AOC L2 |
Tender Value
₹1.5 L
EMD Value
₹3,822
Closing Date
28 Jan 2026, 3:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
PH SUBDIVISION KWA KOLLAM
DEPOSIT-PUBLIC TAP DISCONNECTION RWSS to Muntrothuruth Disconnecting Public taps at various wards in Muntrothuruth Panchayth Pipeline Work
2026_KWA_828737_1
TR/28550/2023_26_1_1/1
Open Tender
Civil Works - Water Works
60 days
MUNROETHURUTH
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
₹3,822
8 Apr 2026
19 Jan 2026
29 Jan 2026
19 Jan 2026
28 Jan 2026
19 Jan 2026
PART 1 WORKING CHARGES
100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation.
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix)
100.51.1: Disconnecting water connection from service mains along earthern road without causing any damage to the existing line including charges of earth work excavation in all kinds of soil for exposing connection point including tar cutting / conrete cutting if any, making the disconnection point water tight charging and testing to the required pressure, rectifying any defects noticed and refilling the trenches using excavated earth in layers not exceeding 20cm depth including consolidating each layers by ramming, watering, removing the surplus soil from the work site, without causing any damages to any other existing utilities, including the charges of hire for tools and plant, conveyance of tools and materials to the leak site, bailing out water, lighting, watching, ribbon fencing, caution boards, traffic diversion but excluding cost of materials and as per the direction of departmental officers etc. complete.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_1391297.pdf
finsummary_1391297.pdf
aoc.pdf
finance_1391297.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_1391297.xls
BOQ • 0.31 MB
NIT.pdf
Tender Documents • 0.19 MB
generalconditions.pdf
Additional Documents • 0.11 MB
Download all tender documents and submit your bid