| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.8 LAccepted-AOC | L1 | Accepted-AOC Being lowest bidder | |
| 2 | L2₹35.4 L+₹56,472 (1.62%)Rejected-Finance 146 CP COLONY 7 NO CHOURAHA KALPANA NAGAR MORAR GWALIOR 474006 | GWALIOR | MADHYA PRADESH | 474006 | L2 | Rejected-Finance Being 2nd Lowest | |
| 3 | L3₹38.0 L+₹3.2 L (9.07%)Rejected-Finance 189 TEACHEARS COLONY THAKUR PLOT TAJBAG NAGPUR 440024 | NAGPUR | MAHARASHTRA | 440024 | L3 | Rejected-Finance Being 3rd Lowest | |
| 4 | L4₹42.2 L+₹7.4 L (21.1%)Rejected-Finance 04A 1112 1117 4 1115 MOTI TALKIES BUILDING DANAPIT BEGAMPURA SURAT SURAT GUJARAT 395003 | SURAT | GUJARAT | 395003 | L4 | Rejected-Finance Being 4th Lowest | |
| 5 | L5₹43.6 L+₹8.8 L (25.3%)Rejected-Finance ADAJAN HAJIRA ROAD SURAT GUJARAT 395009 | SURAT | GUJARAT | 395009 | L5 | Rejected-Finance Being 5th Lowest |
Tender Value
₹47.9 L
EMD Value
₹95,880
Closing Date
22 Jan 2021, 6:00 pmClosed
Office of SM(E-E), AAI,Surat Airport, Surat
Office of SM(E-E), AAI, Surat Airport, Surat
Annual comprehensive maintenance contract of all types AC units, water coolers and water purifiers for 3 years at Surat airport.
2021_AAI_66696_1
AAI/SRT/SM(E-E)/e-NIT-12/20-21
Open Tender
Electrical Works
Item Rate
1095 days
AAI, Surat Airport
As per NIT
17 documents required · 17 mandatory
₹1,180
Yes
Airports Authority of India
₹95,880
Yes
9 Apr 2021
13 Jan 2021
25 Jan 2021
13 Jan 2021
22 Jan 2021
13 Jan 2021
13 Jan 2021 - 19 Jan 2021
Amount
SH I:For 1st Year (Note: - Rate to be quoted should include the minimum manpower required as mentioned at page no.174 of the tender document)
Annual comprehensive Maintenance of following air-conditioners with its voltage stablizers & timers of different makes of following capacity at different locations including providing all necessary consumables and spares complete as required as per special condition.
1.5 Ton Split / window AC unit (without compressor)
1.5 Ton Split AC unit (with compressor)
2 Ton Split AC unit (without compressor)
2 Ton Split AC unit (with compressor)
2 Ton Cassette type AC Units (without compressor)
2 Ton Cassette type AC Units (with compressor)
3Ton Cassette type AC Units (without compressor)
Annual comprehensive Maintenance of Water Coolers of all makes of capacity upto 150 Ltr at different locations including providing all necessary consumables and spare complete as required as per special condition.
Annual comprehensive Maintenance of RO plants of all makes of capacity upto 50 LPH at different locations including providing all necessary consumables and spare complete as required as per special condition.
Annual comprehensive maintenance contract of water filter cum Aquaguard purifier of all makes at different locations including providing all necessary consumable items & Spares etc. complete as required as per special conditions of contract.
Dismantling and re-installation of following type split type AC units up to 4 mtrs refrigerant piping including mounting of indoor and out door units, drain piping arrangements, charging of refrigerant gas, insulation of refrigerant piping with extended polythylene / PVC piping etc. complete as required
1.5 Ton/ 2 Ton Split AC Units
Supply, Installation, Testing and Commissioning of refrigerant copper piping including insulation, PVC protection piping for suction and discharge line for split AC Units
SH II:For 2nd Year (Note: - Rate to be quoted should include the minimum manpower required as mentioned at page no.174 of the tender document)
Annual comprehensive Maintenance of following air-conditioners of all makes of following capacity at different locations including providing all necessary consumables and spares complete as required as per special condition including CMC of Voltage stabilizers & timers, whereever connected etc as required.
1.5 Ton Split AC unit (without compressor)
1.5 Ton Split AC unit (with compressor)
2 Ton Split AC unit (without compressor)
2 Ton Split AC unit (with compressor)
2 Ton Cassette type AC Units (with compressor)
3Ton Cassette type AC Units (without compressor)
Annual comprehensive Maintenance of Water Coolers of all makes of capacity upto 150 Ltr at different locations including providing all necessary consumables and spare complete as required as per special condition
Annual comprehensive Maintenance of RO plants of all makes of capacity upto 50 LPH at different locations including providing all necessary consumables and spare complete as required as per special condition
Annual comprehensive maintenance contract of water filter cum Aquaguard purifier of all makes at different locations including providing all necessary consumable items & Spares etc. complete as required as per special conditions of contract.
Dismantling and re-installation of following type split type AC units up to 4 mtrs refrigerant piping including mounting of indoor and out door units, drain piping arrangements, charging of refrigerant gas, insulation of refrigerant piping with extended polythylene / PVC piping etc. complete as required
1.5 Ton/ 2 Ton Split AC Units
Supply, Installation, Testing and Commissioning of refrigerant copper piping including insulation, PVC protection piping for suction and discharge line for split AC Units
SH III:For 3rd Year (Note: - Rate to be quoted should include the minimum manpower required as mentioned at page no.174 of the tender document)
Annual comprehensive Maintenance of following air-conditioners of all makes of following capacity at different locations including providing all necessary consumables and spares complete as required as per special condition including CMC of Voltage stabilizers & timers, whereever connected etc as required.
1.5 Ton Split AC unit (without compressor)
1.5 Ton Split AC unit (with compressor)
2 Ton Split AC unit (without compressor)
2 Ton Split AC unit (with compressor)
2 Ton Cassette type AC Units (with compressor)
3Ton Cassette type AC Units (without compressor)
Annual comprehensive Maintenance of Water Coolers of all makes of capacity upto 150 Ltr at different locations including providing all necessary consumables and spare complete as required as per special condition
Annual comprehensive Maintenance of RO plants of all makes of capacity upto 50 LPH at different locations including providing all necessary consumables and spare complete as required as per special condition
Annual comprehensive maintenance contract of water filter cum Aquaguard purifier of all makes at different locations including providing all necessary consumable items & Spares etc. complete as required as per special conditions of contract.
Dismantling and re-installation of following type split type AC units up to 4 mtrs refrigerant piping including mounting of indoor and out door units, drain piping arrangements, charging of refrigerant gas, insulation of refrigerant piping with extended polythylene / PVC piping etc. complete as required
1.5 Ton/ 2 Ton Split AC Units
Supply, Installation, Testing and Commissioning of refrigerant copper piping including insulation, PVC protection piping for suction and discharge line for split AC Units
Manish Electricals
M K ENTERPRISES
VIKAS ENGINEERING CO
AMI CONTROL SERVICES PVT LTD
Zamzam Refrigeration and airconditioning
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .