| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹18.9 L+₹2.4 L (14.7%)Accepted-AOC | L2 | Accepted-AOC L1 not willing to accept the contract on the quoted amount. Hence AOC issued to L2 | |
| 2 | L1₹16.5 LRejected-AOC | L1 | Rejected-AOC L1 not willing to accept the contract on the quoted amount. |
Tender Value
₹16.5 L
EMD Value
₹24,700
Closing Date
12 Apr 2023, 3:00 pmClosed
Executive Engineer
Generation Division, Seethathode, Pathanamthitta Dist Kerala Pin-689667
Complete alignment of turbine, Gear box and Generator, Adjustment of bearings and Thrust pad clearance, Gear box oil seal replacement to run the machine continuously at full load at 3MW at Peppara SHEP
2023_KSEB_567437_1
GDS/eT-01/2022-23 Dated 17.03.2023
Open Tender
Repair and Maintenance Works
Item Rate
45 days
Peppara, Vithura
Please refer Tender document
8 documents required · 8 mandatory
₹5,900
₹24,700
11 May 2023
18 Mar 2023
17 Apr 2023
18 Mar 2023
12 Apr 2023
21 Mar 2023
18 Mar 2023 - 2 Apr 2023
Turbine Side
Checking of shaft bend with master level and checking of shaft run out.
Checking of turbine guide bearing clearance, radial guide bearing clearance, blue matching and polishing.
Checking of thrust pad clearance, blue matching and polishing.
GearBox
Gear box oil seal replacement after dismantling the gear box collar sleeve. Roller bearing and tooth inspection and cleaning (including cost of puller)
After alignment, doweling of gear box for reference and shim adding for alligning.
GENERATOR
Bearing inspection of non drive end, Drive end and Thrust bearing inspection , polishing and blue matching. Rebabitting of bearing pads if required
FULL ALIGNMMENT OF THE MACHINE WITH RESPECT TO TURBINE
Allignment of generator rotor & shaft with thrust area as base reference, using manual or mechanical means including tightning of foundation bolts of gear box, NDE & DE, adding shims as required, mounting the upper casing of all bearings etc making the machine ready for operation.
Checking rotor & Stator axis for magnetic axis and air gap corrections. Sufficient corrections has to be done as per the requirment.
Optional Work (If required after verifying the site condition)
Thrust collar machining or polishing both side. Including machining of turbine shaft thrust collar if required, which include the decoupling of turbine shaft at thrust bearing side. Dismantling of the runner servo pipe inside the shaft for controlling the runner and transporting it to lathe work shop. Reconditioning, reassembling and alligning the shaft.
RUNNER OPTIONAL WORK(IF IT IS NECESSARY DURING SHAFT LEVELING AND ALIGNMENT)
Retofitting of runnr chamber (Top half portion) and Runner.
OPTIONAL WORK (IF IT IS NECESSARY)
Rebabittting of bearing pads.
Provisions for fabricating of all dowel pin according to required size for where ever necessary, Supply of shim of required size for allignment corrections. Provisions for special tools for dismantling and rettofitting the machine. Including supply of "O" rings and damaged seals.
M/s. RISING SUN ENTERPRISES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .