Loading…
Loading…
Tender ID
Tender Value
₹20.8 L
EMD Value
₹20,811
Closing Date
13 Mar 2026, 5:00 pmClosed
Executive Engineer, Capital Project Division No.3, Gandhinagar
3054 M & R Providing W Metal Beam Crash Barrier at Indira Bridge and Natural drain on Gandhinagar - Koba - Aerodrome road.
283063
Tender Notice No.30 of 2025-26. (Sr.No.2)
Open
Civil - All
Works
Gandhinagar
5 documents required · 5 mandatory
₹900
Yes
Executive Engineer, Capital Project Division No.3, Gandhinagar
₹20,811
Yes
5 Mar 2026
5 Mar 2026
5 Mar 2026
13 Mar 2026
5 Mar 2026
Name of Work :- 3054 M & R Providing “W” Metal Beam Crash Barrier at Indira Bridge Natural drain on Gandhinagar _
Koba - Aerodrame road.
BILL OF QUAINTITIES
MEMORANDUM SHOWING THE ITEM OF WORKS TO BE CARRIED OUT
Item Description of Item Quantity Unit Rate In figures Amount
Type - A, "W" : Metal Beam Crash Barrier
(Providing and erecting a "W" metal beam crash
barrier comprising of 3 mm thick corrugated
sheet metal beam rail, 70 cm above
road/ground level, fixed on ISMC series channel
vertical post, 150 x 75 x 5 mm spaced 2 m
centre to centre, 1.8 m high, 1.1 m below
ground/road level, all steel parts and fitments
to be galvanised by hot dip process, all fittings
to conform to IS:1367 and IS:1364, metal beam
rail to be fixed on the vertical post with a spacer
of channel section 150 x 75 x 5 mm, 330 mm
long complete as per clause 811)
Rupees Twenty lakhs eighty one thousand four only.
Executive Engineer,
Capital Project Division No.3
Item Description of Item Quantity Unit Rate In figures Amount
I/We am/are willing to carry out the above work @ ____________ % below/above percent (should be written in figures
and words) of the estimated rates mentioned above Amount of my/our tender works out as under.
Estimated cost put to tender Rs. 20,81,004=00 Estimated cost put to tender Rs. 20,81,004=00
Deduct ___________% below Add__________% above
In words In Words
Note 1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge
for which no extra payment shall be made.
Note 2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Note 3 GST and Income tax TDS will be deducted at a source while making payments of bills
Note 4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017
Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual
mix design the cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate
mentioned in all the tender.
Executive Engineer,
Capital Project Division No.3
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
File No.1 E-Tendering Notice.pdf
File No.2 SBD.pdf
File No.4 Specification.pdf
File No.5 Condition G.R.pdf
File No.3 BOQ .pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .