Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Finance CONTRACTOR 143 RAJDANGA MAIN ROAD KOLKATA KOLKATA KOLKATA 700107 | KOLKATA | WEST BENGAL | 700107 | +0.00% | ₹2.0 L | L1 | Admitted-Finance |
| 2 | L2₹2.0 L+₹3,051 (1.55%)Admitted-Finance 5 8 DAKSHINPARA ROAD KOLKATA KOLKATA 700028 | 24 PARAGANAS NORTH | WEST BENGAL | 700028 | +1.55% | ₹2.0 L+₹3,051 (1.55%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 L+₹5,414 (2.75%)Admitted-Finance 110 5 BONOMALI NASKAR ROAD BEHALA PARNASHREE PARNASHREE KOLKATA WEST BENGAL 700060 | KOLKATA | WEST BENGAL | 700060 | +2.75% | ₹2.0 L+₹5,414 (2.75%) | L3 | Admitted-Finance |
Tender Value
₹2.0 L
EMD Value
₹4,000
Closing Date
11 Jul 2026, 5:00 pmClosed
Dy. C.E. (M) (S AND D) KMC
Office of the Dy.CE(M)/ (S and D) /EE(M)/DLPS, SEWARAGE and DRAINAGE department Kolkata Municipal Corporation DHAPA LOCK PUMPING STATION CANAL SOUTH ROAD Kolkata-700 105 West Bengal
UPROOTING AND REMOVING THE JANGLES,SHRUBS,PLANTS ETC.AROUND LABOUR STAFF QUARTER,OFFICE BUILDING, PUMP HOUSE AND OPEN YARD WITH CLEANING OF WATER BODY WITHIN THE PREMISES OF DLPS
2026_KMC_1028324_1
DLPS/JANG/2026-2027
Open Tender
Miscellaneous Services
Percentage
90 days
DLPS
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4,000
24 Jul 2026
19 Jun 2026
14 Jul 2026
19 Jun 2026
11 Jul 2026
19 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 1.Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed. | 975 | SQUARE METER | 10 | ₹9,750 |
| 2 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: B. MAINTENANCE WORKS : 10)Uprooting and removing plants from the surface of walls parapet etc and making good damages. (Repairing of damages to be paid separately). (b) Medium size plant of girth of exposed stem above 75 mm. but not exceeding 150 mm. lift upto 6 mtr. Note : For lift beyond initial 6 mtr. the rate will be increased @ 20% for each additional lift if 6 mtr. or part thereof. | 180 | EACH | 60 | ₹10,800 |
| 3 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: B.MAINTENANCE WORKS : 10)Uprooting and removing plants from the surface of walls parapet etc and making good damages. (Repairing of damages to be paid separately). (a) Small plant of girth of exposed stem upto 75 mm. lift upto 6 mtr. Note : For lift beyond initial 6 mtr. the rate will be increased @ 20% for each additional lift if 6 mtr. or part thereof. | 230 | EACH | 50 | ₹11,500 |
| 4 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: B. MAINTENANCE WORKS : 10)Uprooting and removing plants from the surface of walls parapet etc and making good damages.(Repairing of damages to be paid separately). (c) Large plant of girth of exposed stem above 150 mm. but not exceeding 225 mm. lift upto 6 mtr. Note : For lift beyond initial 6 mtr. the rate will be increased @ 20% for each additional lift if 6 mtr. or part thereof. | 56 | EACH | 187 | ₹10,472 |
| 5 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 11. Post Constructional Measures :(e) Spot application for insecticides using Aqua base spray for pest (for bugs, cockroaches, silverfish, spider, termites, mosquitoes) to walls and ceiling etc.with
chemical emulsion by admixing chloropyrofos emulsifiable concentrates (1% concentration) with water by weight including spraying the emulsified chemical @ 0.5 litres per sq.m. by a hand operated pressure pump on wall surfaces, ceiling, electrical
fixture,electrical lines including drilling holes inplaces where source of termite is detected squirting chemical solution into the holes and sealing the holes with cement grout. (Rate is per sq.m. of the floor area while actual work will be all walls ceiling, rack,partition and furniture). | 635 | SQUARE METER | 49 | ₹31,115 |
| 6 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem :
3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | 450 | EACH | 269.5 | ₹1,21,275 |
| 7 | Estimated amount | - | - | - | - |
| 8 | Add: 0%SGST | - | LS | - | - |
| 9 | Add: 0%CGST | - | LS | - | - |
| 10 | 1% LWC | - | LS | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_2525836.xls
BOQ • 0.28 MB
FORM.pdf
Tender Documents • 0.61 MB
extension.pdf
PDF • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .