Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.5 LAccepted-AOC 154 GANDHI MARKET AMBALA CANTT HARYANA 133001 | AMBALA CANTT | AMBALA | HARYANA | 133001 | ₹22.5 L | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹24.6 L+₹2.1 L (9.13%)Rejected-Finance | ₹24.6 L+₹2.1 L (9.13%) | L2 | Rejected-Finance Not lowest bidder |
Tender Value
₹26.7 L
EMD Value
₹53,400
Closing Date
19 Apr 2022, 6:00 pmClosed
CWE AF AMBALA
HQ CWE AF Ambala Ambala cantt 133001
COMPREHENSIVE MAINTENANCE OF CENTRAL AIR CONDITIONING PLANT AT CERTAIN OTM BUILDINGS AT AF STATION AMBALA UNDER GE (AF) AMBALA
2022_MES_510201_2
CWE/AF AMB/AMB-52/2021-22
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
Ambala cantt
For MES enlisted contractor Class D Category c i and for un-enlisted contractor refer NIT
7 documents required · 7 mandatory
₹500
Yes
GE AF AMBALA
₹53,400
Yes
4 May 2022
30 Mar 2022
21 Apr 2022
30 Mar 2022
19 Apr 2022
7 Apr 2022
30 Mar 2022 - 2 Apr 2022
Amount
Periodical, preventive and comprehensive maintenance of package type 3Nos. chiller units, each consisting of 1No. 100TR alongwith motors and their condensors including descaling, flooded chiller, scale guard units, micro-processor based control panel system of central air conditioning plant installed at IACCS, as per manufacturer's manual of preventive and comprehensive maintenance with periodicity mentioned there in and as per particular specifications detailed here-in-after and for the following equipment complete all as specified & directed:- (i) Condensing pump sets alongwith motors 12.5HP - 03Nos (ii) Chiller pump sets alongwith motors 12.5HP - 03Nos
Periodical, preventive and comprehensive maintenance of package type 3Nos. chiller units, each consisting of 1No. 60TR alongwith motors and their condensors including descaling, flooded chiller, scale guard units, micro-processor based control panel system of central air conditioning plant installed at GURTH Complex, as per manufacturer's manual of preventive and comprehensive maintenance with periodicity mentioned there in and as per particular specifications detailed here-in-after and for the following equipment complete all as specified & directed:- (i) Condensing pump sets alongwith motors-03Nos (ii) Chiller pump sets alongwith motors-03Nos
Notes for BOQ item No. 1.00 & 2.00 :- (i) The maintenance shall run for one year from the date of commencement of contract and during this period the smooth funcitoning of plant is responsibility of contractor. (i) The maintenance services shall be done through OEM i.e. Voltas or Blue star. The Contractor shall submit a MoU on stamp paper duly notarized, as per performa specified hereinafter alongwith a copy of Annual Maintenance Contract from Voltas within 10 days from the date of acceptance, failing which the contract will be liable to be cancelled and work shall be got executed at the risk & cost of the Contractor. (iii) The Contractor will arrange OEM visit quarterly for inspection and to check functionality of the plants including maintenance services as required and shall provide satisfaction certificate of smooth functioning of plant (iv) The rates quoted shall be deemed to be inclusive of the all above aspects.
Periodical, preventive and comprehensive maintenance of the following accessories of central air conditioning plant installed at IACCS, as per manufacturer's manual of preventive and comprehensive maintenance with periodicity mentioned there in and as per particular specifications detailed here-in-after complete all as specified & directed;- (i) FRP cooling towers with motor, fan, gear box - 02Nos. (ii) Compressor water pipe line and its control valves -01lot (iii) Chiller water pipe lines and its control valves- 01lot (iv) AHUs with accessories such as casing chilled water coil, hot water coil, any type of air filters, drive motors control panel, etc. having capacitiy 28000CFM - 01No, 24000CFM - 01No & 23000CFM - 01No. (v) Expansion tanks including their insulation for chilled water and hot water system - 01No. (vi) Electrical operated hot generator of capacity 2 x KW with automatic and safety controls such as safety valve, purge valve, high limit cut out automatic and manual reset, low level cut out stop controller, thermostat, heaters including its control panel- 01 No. (vii) Hot water pump set alongwith motor and control valves pump set 5HP - 02Nos.
(viii) Hot water piping, insulation, fittings control valves connected between hot water unit to pump set and pump set to various AHUs - 01lot (ix) Replacement of controller for compressor (x) Controls for AHUs comprising of three way mixing valves with modulating motor, thermostat and humidistat- 03 Nos. (xi) Supply air ducting complete, aluminium section grills/diffusers its dampers, fire dampers, etc. (xii) Cubical type floor mounted main LT panel consisting of control switch gear, starters of pump sets, cooling towers and its single phase preventors, no volt and under volt protection system, meters indication lamps - 02 Nos. (xiii) Sub control panel provided for AHUs including controls starter, meters indication lamps -03 Nos. (xiv) Central control console panel comprising of ON/OFF push buttons and ON/OFF indication lights - 03Nos. (xv) LT cables from main electrical panel to compressor motor, pump motors cooling towers motors, sub panels of AHUs units floor mounted and ceiling suspended and control cables of central console panel - 01 lot (xvi) 02 Nos. earth pits and earthing strips provided for panels and motors - 01 lot (xvii) Air washer operated on 230AC Supply - 02 Nos.
Periodical, preventive and comprehensive maintenance of the following accessories of central air conditioning plant installed at Gurth Complex, as per manufacturer's manual of preventive and comprehensive maintenance with periodicity mentioned there in and as per particular specifications detailed here-in-after complete all as specified & directed :- (i) FRP cooling towers with motor, fan, gear box - 01 No. (ii) Compressor water pipe line and its control valves - 01 lot (iii) Chiller water pipe lines and its control valves- 01 lot (iv) AHUs with accessories such as casing chilled water coil, hot water coil, any type of air filters, drive motors control panel etc - 02 Nos. (v) Expansion tanks including their insulation for chilled water and hot water system - 01 No. (vi) Electrical operated hot generator with automatic and safety controls such as safety valve, purge valve, high limit cut out automatic and manual reset, low level cut out stop controller, thermostat, heaters including its control panel - 01No. (vii) Hot water pump set alongwith motor and control valves pump set - 02 Nos.
(viii) Hot water piping, insulation, fittings control valves connected between hot water unit to pump set and pump set to various AHUs - 01lot (ix) Controls for AHUs comprising of three way mixing valves with modulating motor thermostat and humidistat - 02Nos. (x) Supply air ducting complete, aluminium section grills/diffusers its dampers, fire dampers (xi) Cubical type floor mounted main LT panel consisting of control switch gear, starters of pump sets, cooling towers and its single phase preventors, no volt and under volt protection system, meters indication lamps - 01 No. (xii) Sub control panel provided for AHUs including controls starter, meters indication lamps - 02 Nos. (xiii) Central control console panel comprising of ON/OFF push buttons and ON/OFF indication lights - 02Nos. (xiv) LT cables from main electrical panel to compressor motor, pump motors cooling towers motors, sub panels of AHUs units floor mounted and ceiling suspended and control cables of central console panel - 01 lot (xv) Earth pits and earthing strips provided for panels and motors - 01 lot
Notes for BOQ item No. 3.00 to 4.00 :- (i) The works shall be got done through authorised service agency of the OEM i.e. Voltas or Blue star. The Contractor shall carry out all major and minor break down/repairs pertaining to machineries of central AC Plant & connected cooling towers, AHUs and the rates quoted is deemed to be included for all other aspects except any damage due to natural disasters such as flash, floods, earth quake, cyclone etc. (ii) The contractor shall maintain indoor design condition as dry bulb 23 degree celsius plus/minus 2 degree, if the above said temperature and relative humidity as specified is not achieved a penalty of Rs 5000/- per hour shall be imposed on the contractor from the dues as and when becomes due. (iii) Submission of testing report of AC plant as & when required by Engineer-in-charge. (iv) In case of breakdown, it is contractor's responsibility to attend the breakdown immediately without any extra cost. (v) Taking down/out of old spare parts and S&F of new spare parts shall be measured & paid seperately. (vi) The maintenance shall run for one year from the date of commencement of contract and during this period the smooth funcitoning of plant is responsibility of contractor.
(vi) To check and servicing the undermentioned items fitted in plants also included in quoted rates:- (a) All the valves of water pipe line of condenser (b) All the valves of water pipe line of chiller motor (c) Painting of all pipe line of air conditioning system. (d) Fitting float valves in cooling towers. (e) Fitting new water pipe line from reserve water tank to coling towers . (f) Fitting new water pipe line in both reserve wtaer tank. (Incoming water pipe line) seperately with On/Off valves (g) Fitting float valves to Reserve water tanks (h) Fitting water by pass valve to both cooling tower (j) Replacement of FRP of both cooling tower (k) Maintenance of Air ducts of Air conditioning system (l) Checking of Air flow of Air conditioning system (m) Putting insulator (n) Replacement of coarse filters (o) 1No AHU is having low cooling efficiency thoroughly checking of sytem (p) Setting of thermostats in AHU room for temperature control (q) Replacement of U/S thermometer . (r) Fitting new water pipe lines to reserve water tank for over flow of water
Supply and charging of refrigerent R-134a gas in plant after detection/ rectification of any leakages in the system by using CO2 gas and flushing the complete system thoroughly with nitrogen gas including pressure test (for Central AC plant Screw type compressor of capacity 100TR at IACCS complete all as specified and as directed.
Supply and charging of refrigerant F-22 gas in plant after detection / rectification of any leakages in the system by using CO2 Gas and flushing the complete system throughly with nitrogen gas including pressure test all as specified and directed. (For Central AC plant semi sealed type compressor of capacity 60TR at Gurt complex Notes for item No 5.00 & 6.00 : (a) Gas to be brought by contractor at site from authorised dealer/ manufacturer and shall be in company's sealed cylinder and empty cylinders shall be returned to the contractor. (b) The unit rate quoted are inclusive of the cost of nitrogen/ CO2 gas used for leakages test and pressure test prior to filling / charging of gas.
Supply & filling compressor oil including draining out existing oil, vacuum testing, filling oil (non freezing) in AC plant (compressor oil shall be brought by the contractor in sealed cans procured from the authorised dealer alongwith test certificate of Grade BSE-170 for IACCS AC plant complete all as specified and directed
Supply & filling compressor oil including drain out existing oil, vacuum testing, filling oil (non freezing) in AC plant (compressor oil should be brought by the contractor in sealed cans procured from the authorised dealer alongwith the test certificate of Grade 68 for Gurt Complex AC plant complete all as specified and directed. Notes for BOQ item No 7.00 & 8.00 :- (i) Replacement of compressor oil should be carried out in presence of the authorised rep of company Voltas/ Blue Star (York). (ii) Service report of authorised rep of the OEM shall be kept on record and to be produced during routine inspection/technical check by the rep of accepting officer.
M&L for rewinding of 100HP, 2900RPM, 3 phase, 50 Hz comperssor motor suitable for 60 TR York (USA) semi closed compressor for AC plant at Gurt complex complete all as specifed and comprising following activities:- (a) Disconnecting & removing the electric motor or mono block type pump motor of water pump/ cooling tower from the installed position for repair including its transportation to & fro from work site to repair workshop. (b) Dismantling existing burnt winding from the motor , preparing for rewinding complete with super enameled copper winding wire of existing gauge including all insulating materials such as insulation paper , sleeves, tape, varnish etc and painting with two coats of super enamel paint over a coat of primer and greasing of bearings. (c) Loading / unloading / transporting motor / pump set to the site, installing in position, alignment, electric connection, commissioning and testing in actual working conditon for 8 hours continuously. (d) Motors shall be handed over during the currency of contract on as required basis. (e) Repair / rewinding should be carried in the authorised workshop of company Blue star or York.
M&L for rewinding of electric motor of capacity 10 to 20 HP 3 phase operating on 50 HZ 415 volt supply at IACCS complete all as specifed and comprising following activities:- (a) Disconnecting & removing the electric motor or mono block type pump motor of water pump/ cooling tower from the installed position for repair including its transportation to & fro from work site to repair workshop. (b) Dismantling existing burnt winding from the motor , preparing for rewinding complete with super enameled copper winding wire of existing gauge including all insulating materials such as insulation paper , sleeves, tape, varnish etc and painting with two coats of super enamel paint over a coat of primer and greasing of bearings. (c) Loading / unloading / transporting motor / pump set to the site, installing in position, alignment, electric connection, commissioning and testing in actual working conditon for 8 hours continuously. (d) Motors shall be handed over during the currency of contract on as required basis. (e) The unsevicability of motor to be recorded in routine complaints register with docket No. and same shall be recorded in MB as well as necessary technical checks be carried out before shifted to the repair workshop..
Description all as per BOQ item No 10.00 here-in-before but capacity 5 to 10 HP at Gurt Complex
M&L in replacement PVC fins honey combs of size 24" x 12" x 6" for cooling towers at complete all as specified and directed
M&L in replacement 50mm bore mild steel heavy duty pipe line including welding complete all as specified and directed.
Description all as per BOQ item No 13.00 here-in-before but 80mm bore.
Description all as per BOQ item No 13.00 here-in-before but 100mm bore.
Description all as per BOQ item No 13.00 here-in-before but 150mm bore.
S&F in replacement aluminium fan blade assembly, with four aluminium blades duly balanced for one cooling tower of capaicity upto 100TR as per existing size and pattern complete all as specified and directed
S&F in replacement FRP side panel (set of 08 No.) for circular type cooling tower capacity upto 100TR complete all as specified and directed
S&F in replacement side cover jali as per existing size and pattern for cooling towers complete all as specified and directed
S&F in replacement sprinkler and other accessories like Aluminium distributor , PVC pipes, tie rod, flapper, clamp, including nuts and bolts, GI wire with eliminator pad etc, supporting fastener of cooling tower complete as per existing make, type and design complete all as specified and directed.
S&F in replacement top protector cover to the CT fan motor at the iron top of the cooling tower made out of GI sheet 20SWG, conical shape with and including flat iron clamps of required size to protect the CT fan motor form rain water complete all as specified and directed
S&F in replacement metallic viscos filter made out of GI wire mesh interspaced with two crimp layers with three flat layers and housed in 2" deep metal frame, efficiency 65%, as per existing size and pattern complete all as specified and directed
S&F in replacement water pressure gauge 100mm dia range 0-100LBS/sq inches including Syphon Pipes complete all as specified and directed
S&F in replacement suction pressure gauge suitable for range (-) 30 to 150LBS/sq inches including Syphon Pipes complete all as specified and directed
S&F in replacement discharge pressure gauge suitable for range 0 -300Lbs/sq inches including Syphon Pipes complete all as specified and directed
S&F in replacement air dampers with necessary nuts, bolts, clamps and MS frame made out of angle iron for opening and closing of grills complete all as specified and directed
S&F new cast iron impeller including water seal or gland packing, packing set, metalling, grinding / turning of pump shaft and ball bearing of both ends of existing size for 10 to 20 HP capacity pump sets including taking out of old unserviceable impeller complete all as specified & directed.
Decription all as per BOQ item No 27.00 here-in-before but for 5 to 10 HP capacity.
S&F in replacement terminal plate of bakelite of 3 phase, 415 volts, 50 HZ of electric motors / monoblock pump/ C.T fan motor of any capacity complete all as specified & directed.
S&F in replacement thermal by pass expansion valve for AC plant of capacity 100 TR at IACCS bldg complete all as specified and directed by Engr-in-Charge.
S&F in replacement thermal expansion valve for AC plant of capacity 60 TR complete all as specified and directed.
S&F in replacement electronic expansion valve for AC plant of capacity 100 TR complete all as specified and directed.
S&F in replacement air grills made out of GI sheet as per existing size and pattern complete with necessary nuts, bolts, clamps and MS frame made out of angle iron of required size damper for opening and closing of grills complete all as specified & directed.
S&F in replacement 150mm dia Butterfly valve made of cast iron body of PN 1.6 Rating as per engineering standards and specifications for Hot water system complete all as specified and directed.
S&F in replacement 150 mm dia Balancing valves made of Cast iron/Gun metal of PN 1.6 Rating as per engineering standards and specifications for Hot water system complete all as specified and directed.
S&F in replacement 100mm dia Butterfly valve made of cast iron body of PN 1.6 Rating as per engineering standards and specifications for Hot water system complete all as specified and directed.
S&F in replacement 100 mm dia Balancing valves made of Cast iron/Gun metal of PN 1.6 Rating as per engineering standards and specifications for Hot water system complete all as specified and directed.
S&F in replacement 80mm dia Butterfly valve made of cast iron body of PN 1.6 Rating as per engineering standards and specifications for Hot water system complete all as specified and directed.
S&F in replacement 80 mm dia Balancing valves made of Cast iron/Gun metal of PN 1.6 Rating as per engineering standards and specifications for Hot water system complete all as specified and directed.
S&F in replacement Y strainer 150mm size complete all as specified and directed
S&F in replacement Y strainer 100mm size complete all as specified and directed
S&F in in replacement Y strainer 80mm size complete all as specified and directed
S&F in replacement pressure transmitter range (-) 01 to 12 bar, output 10 to 90% , supply 4.75 to 8Volt DC complete all as specified and directed
S&F in in replacement pressure transmitter range upto 16 bar, output 4 to 20mA, supply 9 to 28Volt DC complete all as specified and directed
S&F in in replacement pressure transmitter range upto 25 bar, output 4 to 20mA, supply 9 to 28Volt DC complete all as specified and directed
S&F in replacement MCCB 630Amp, 50KA, three pole and protection from short circuit and overload with adjustable thermal and magnetic setting complete all as specified & directed
S&F in replacement MCCB 250Amp, 36KA, three pole and protection from short circuit and overload with adjustable thermal and magnetic setting complete all as specified & directed
S&F in replacement MCCB 160Amp, 25KA, three pole and protection from short circuit and overload with adjustable thermal and magnetic setting complete all as specified & directed
S&F in replacement MCCB 63Amp, 16kA, three pole and protection from short circuit and overload with adjustable thermal and magnetic setting complete all as specified & directed
S&F in replacement volt meter digital type suitable for 0-500Volt complete all as specified and directed
S&F in replacement ammeter digital type suitable for 0-200Amps complete all as specified and directed
S&F in replacement indicator bulbs Red, Blue and Yellow phases complete all as specified and directed
S&F in replacement On/OFF switch to start/stop the motors complete all as specified and directed
S&F in replacement contactor MNO 22E, 2No+2NC 230Volt complete all as specified & directed
S&F in replacement 25A MNX contactor 230 Volt, 2No+2NC complete all as specified & directed
S&F in replacement 32A MNX contactor 230 Volt, 2No+2NC complete all as specified & directed
S&F in replacement timer ETR 550 of 220Volt complete all as specified & directed
S&F in replacement overload relay MN 9-14Amp complete all as specified & directed
S&F in replacement overload relay MN 15-23Amp complete all as specified & directed
S&F in replacement overload relay MN 6-10Amp complete all as specified & directed
S&F in replacement add on auxilary contact block 2No + 2NC complete all as specified & directed
S&F in replacement V belt of size B-82 complete all as specified & directed
S&F in replacement V belt of size B-87 complete all as specified & directed
S&F in replacement V belt of size B-90 complete all as specified & directed
S&F in replacement V belt of size B-103 complete all as specified & directed
M&L spray painting to central AC plant including cooling tower compressor, compressor motors, electric panel, discharge pipe line, suction pipe line, condenser pump, chiller pump by removing peeled old paint with scrapper and applying two coats of synthetic enamel paint of 1st quality, of approved tint and writing SM No/ MES No as exists with black enamelled paint complete all as specified & directed
M&L preparation to old painted surfaces by scrubing of old paint from MS pipes upto 150mm bore of condensor/cooling tower located at different pockets and applying two coats of synthetic enamel paint of approved tint complete all as specified & directed
M&L servicing of FRP cooling tower capacity 60 to 125TR, cleaning of water tanks, body of cooling tower to make the cooling tower functional and servicable in all respect with and including rectification of minor leakages from the cooling tower by using suitable sealing adhesives complete all as specified & directed
M&L in repair to wiring of control system of AC plant starter panel including contactor by using copper conductor PVC insulated wire of size as exists and making necessary connections to make the control / interlocking system functional with and including minor repair of contactor complete all as specified & directed
M&L taking down/out hot water generater, disconnecting electric/water connections, cleaning the tank with recommended chemical/cleaning agent, replacing defective parts such as heating element, nuts, bolts & washers including repairing of electircal panel of hot water generator by replacing the spare parts, repairing hot water generator tank by welding, making necessary electrical/water connections to make the plants functional complete all as specified & directed Note: Spare parts shall be measured & paid seperetely. Cost of minor part such as element, nuts, bolts & washers is deemed to be included in the quoted rates
M&L servicing, repair and overhauling of semi sealed type compressor capacity 60TR, after disconnecting, removing from system, transporting to work shop of OEM, replacement of gasket set, seals, suction / discharge reeds and other minor spares as required and transporting back to site, re-installing, commissioning and testing of the same and making necessary connections to make the the unit functional with existing system complete all as specified and as directed Note: The cost of minor spares such as gasket set, seals, suction and discharge reeds as required shall be deemed to be included in quoted rates
S&F in replacement pulley of AHU motor with and including seal or gland packing, packing set, metalling, grinding /turning of shaft, ball bearing as per existing type and make complete all as specified and as directed
M&L for repair to wiring of control system of AHUs including contactor by using copper conductor PVC insulated wire of size as exists and making necessary connections to make the control / interlocking system functional with and including minor repair of contactor complete all as specified and as directed
S&F in replacement power contactor 32Amp, 3 pole, 415Volt, AC with 01 No + 01 No auxilary contact complete all as specified & directed
S&F in replacement power contactor 50Amp, 3 pole, 415Volt, AC with 01 No + 01 No auxilary contact complete all as specified & directed
S&F in replacement humidity controller with and including sheet metal enclosures for fixing humidity controller after taking down/out controller with encloser of existing type, model and as per site complete all as specified & directed
S&F in replacement chilled water flow meter with and including sheet metal enclosures after taking down/out meter with encloser of existing type, model and as per site complete all as specified & directed
S&F in replacement sheet metal encloser for fixing of humidity controller and chilled water flow controller with transformer of 24Volt step down type including all necessary control wiring complete all as specified & directed
M&L servicing ACB with microprocessor, range 800Amps, 415Volt, 50Hz, 50kA and electrical panel including dismantling of old unserviceable/defective ACB from existing LT panel, removing ACB from LT panel including repairing arrangement for their movement on rail with male/female contacts and complete mechanism microprocessor based ET trip system with thermal memory, fully rated neutral with in-built protection, short circuit breaking capacity conforming to IEC 60947/ISI 13947 (Part I & II), ACB fully functional protection units with flexible and adjustable current time protection settings for overload, short circuit, instantaneous short circuit and earth fault protection, fault indication for overload, short circuit and earth fault complete all as specified & directed comprising of the following parts:- (a) Arc chutes (b) Draw out type handle (c) Magnet hold trigger (d) Anti pumping relay
S&F in replacement fan motor 5HP, 415Volt, 3 phase, 900RPM as per exising type at site complete all as specified & directed
S&F in replacement cylinderical capacitor, 440Volt, rating 25KVAR to 27KVAR as per existing at site complete all as specified & directed
S&F in replacement microprocessor based power factor controller with features as automatic C/K, rated step adjustment automatic correction, display power factor, programmable, under/over voltage alarm and high harmonic distarrtion alarm complete all as specified & directed
M&L for taking down power factor correction panel for detecting faults for repair and for replacement of the defective parts if any, refixing to make it functional complete all as specified & directed
For Credit Schedule refer tender documents. The amount of credit schedule shall be deducted in total quoted amount of BOQ to arrive contract sum.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .