Tender Value
₹65.6 L
EMD Value
₹1.3 L
Closing Date
18 Jul 2019, 9:00 amClosed
SM(Engg-C)
Rajkot Airport Rajkot
Widening of perimeter road at corners for movement of CFT at CA Rajkot
2019_AAI_28433_1
AAI/WR/RAJKOT/ENGG/CIVIL/SM
Open Tender
Civil Works
Works
90 days
Rajkot Airport
Refer Tender Document
11 documents required · 11 mandatory
₹1,120
Yes
Airports Authority of India
₹1.3 L
21 Jan 2020
10 Jul 2019
24 Jul 2019
11 Jul 2019
18 Jul 2019
11 Jul 2019
11 Jul 2019 - 14 Jul 2019
Amount
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with all lead and lift within Airport premises.
Construction of embankment with approved materials (Good earth) obtained from borrow pits (outside airport premises) with all lifts and leads, transporting to site, spreading grading to required slope and compacting upto 20 cm layers to achieve the desired compactions as specified in technical specifications (based on MORTH item 3.16) etc complete in all respects and as directed by Engineer- in-charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping, centring and shuttering complete as per direction and satisfaction of Engineer-In-Charge.
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil
Brick work with common burnt clay F.P.S. (non-modular) bricks of class designation 5.0 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand)
15 mm cement plaster on the rough side of single or half brick wall of mix: 1:6 (1 cement: 6 fine sand)
Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete 300 mm RCC Pipe
Dismantling steel work manually/ by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per direction of Engineer-in-charge.
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Painting road surface marking with adequate nos of coats to give uniform finish with ready mixed road marking paint conforming to IS: 164, on bituminous surface in white/yellow shade, including cleaning the surface of all dirt, scales, oil, grease and foreign material etc. complete. New work (Two or more coats)
Deduct for taking away of steel work in frames, shutters, trusses, channels, beams, tee, angles, bolts, washers etc. and the like received from dismantling. The material so received shall be the property of contractor after dismantling duly weighted/measured before removing from the site in the presence of Engineer-in-charge of his authorised representative all complete.
Arpan Engineering Co
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .