Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹298.7 CrAdmitted-Finance 8TH FLOOR BUILDING NO 9A DLF CYBER CITY PHASE III GURGAON 122002 | GURGAON | GURGAON | HARYANA | 122002 | ₹298.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹299.1 Cr+₹36.1 L (0.12%)Admitted-Finance 12 106 LAXMINAGAR GOPALAPATNAM GOPALAPATNAM VISAKHAPATNAM ANDHRA PRADESH 530027 | VISAKHAPATANAM | ANDHRA PRADESH | 530027 | ₹299.1 Cr+₹36.1 L (0.12%) | L2 | Admitted-Finance |
| 3 | L3₹338.9 Cr+₹40.2 Cr (13.5%)Admitted-Finance NCC HOUSE MADHAPUR HYDERABAD 500 081 | HYDERABAD | HYDERABAD | TELANGANA | 500081 | ₹338.9 Cr+₹40.2 Cr (13.5%) | L3 | Admitted-Finance |
| 4 | L4₹347.2 Cr+₹48.5 Cr (16.2%)Admitted-Finance | ₹347.2 Cr+₹48.5 Cr (16.2%) | L4 | Admitted-Finance |
| 5 | L5₹382.7 Cr+₹84.0 Cr (28.1%)Admitted-Finance CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | ₹382.7 Cr+₹84.0 Cr (28.1%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | NCC LIMITED L3 | JMC Projects India Limited L6 | MEGHA ENGINEERING AND INFRASTRUCTURES LIMITED L2 | Zuberi Engineering Construction Private Limited L4 | LARSEN AND TOUBRO LIMITED L5 | KEC International Ltd L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00EXECUTION OF MEGA RURAL PIPED WATER SUPPLY SCHEMES PERTAINING TO 02 NOS. INDIVIDUAL MEGA PWS TO 418VILLAGES(24GPS) OF KASHIPUR BLOCK AND 49 VILLAGES(04GPS)OF RAYAGADA BLOCK OF RAYAGADA DISTRICT IN ALL RESPECT ON EPC MODE COMPRISING WORK OF DETAILED SURVEY, INVESTIGATION, PLANNING, DESIGNING, COST ANALYSIS AND DELIVERABLES MENTIONED IN RFP AS WELL AS AGREEMENT AND OPERATIONS AND MAINTENANCE OF COMPLETE COMMISSIONED SCHEMES FOR 5 (FIVE) YEAR | |||||||||
| 1.01 | CONSTRUCTION WORK:
EXECUTION OF MEGA RURAL PIPED WATER SUPPLY SCHEMES PERTAINING TO EXECUTION OF 02 NOS. INDIVIDUAL MEGA PWS TO 418VILLAGES(24GPS) OF KASHIPUR BLOCK AND 49 VILLAGES(04GPS)OF RAYAGADA BLOCK OF RAYAGADA DISTRICT INCLUDING HOUSE CONNECTION, SURVEY & INVESTIGATION AND 1% LABOUR CESS
1. Mega PWS to 418villages(24GPs) of Kashipur Block Rayagada District.
2. Mega PWS to 49 villages(04GPs)of Rayagada Block of Rayagada District. | 1 | Nos | 3,05,33,70,000 ₹3,05,33,70,000 | 3,62,21,35,000 ₹3,62,21,35,000 | 2,69,44,49,350 ₹2,69,44,49,350 | 3,12,79,08,150 ₹3,12,79,08,150 | 3,44,76,83,100.08 ₹3,44,76,83,100.08 | 2,69,11,94,608 ₹2,69,11,94,608 Lowest |
| 1.02 | O&M (EXCLUDING ENERGY CHARGES) FOR 5 YEARS INCLUDING 1% LABOUR CESS | 1 | Nos | 33,55,80,000 ₹33,55,80,000 | 39,80,90,000 ₹39,80,90,000 | 29,61,32,900 ₹29,61,32,900 | 34,37,72,100 ₹34,37,72,100 | 37,89,16,899.93 ₹37,89,16,899.93 | 29,57,75,188.25 ₹29,57,75,188.25 Lowest |
| 2.00 | The Total value of Schedule4 | 1 | Nos | - | - | - | - | - | - |
Tender Value
Refer Docs
EMD Value
₹3.3 Cr
Closing Date
7 May 2021, 5:00 pmClosed
EIC RWSS ODISHA BHUBANESWAR
EIC RWSS ODISHA BHUBANESWAR
EXECUTION OF 02 NOS INDIVIDUAL MEGA PWS TO 418VILLAGES 24GPS OF KASHIPUR BLOCK AND 49 VILLAGES 04GPS OF RAYAGADA BLOCK OF RAYAGADA DISTRICT INCLUDING FIVE YEARS OPERATION AND MAINTENANCE IN EPC MODE
2021_RWSS_66938_1
EIC/RWSS/31/20-21
National Competitive Bid
Civil Works - Water Works
Lump-sum
730 days
Rayagada
Please refer Tender documents.
3 documents required · 3 mandatory
₹80,000
EE RWSS Division Bhubaneswar
₹3.3 Cr
EIC RWSS ODISHA BHUBANESWAR
9 Aug 2021
5 Mar 2021
12 May 2021
5 Mar 2021
7 May 2021
8 Mar 2021
5 Mar 2021 - 9 Mar 2021
10 Mar 2021
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1EXECUTION OF MEGA RURAL PIPED WATER SUPPLY SCHEMES PERTAINING TO 02 NOS. INDIVIDUAL MEGA PWS TO 418VILLAGES(24GPS) OF KASHIPUR BLOCK AND 49 VILLAGES(04GPS)OF RAYAGADA BLOCK OF RAYAGADA DISTRICT IN ALL RESPECT ON EPC MODE COMPRISING WORK OF DETAILED SURVEY, INVESTIGATION, PLANNING, DESIGNING, COST ANALYSIS AND DELIVERABLES MENTIONED IN RFP AS WELL AS AGREEMENT AND OPERATIONS AND MAINTENANCE OF COMPLETE COMMISSIONED SCHEMES FOR 5 (FIVE) YEAR | |||||
| 1.01 | CONSTRUCTION WORK:
EXECUTION OF MEGA RURAL PIPED WATER SUPPLY SCHEMES PERTAINING TO EXECUTION OF 02 NOS. INDIVIDUAL MEGA PWS TO 418VILLAGES(24GPS) OF KASHIPUR BLOCK AND 49 VILLAGES(04GPS)OF RAYAGADA BLOCK OF RAYAGADA DISTRICT INCLUDING HOUSE CONNECTION, SURVEY & INVESTIGATION AND 1% LABOUR CESS
1. Mega PWS to 418villages(24GPs) of Kashipur Block Rayagada District.
2. Mega PWS to 49 villages(04GPs)of Rayagada Block of Rayagada District. | 1 | Nos | 2,99,35,00,000 | ₹2,99,35,00,000 |
| 1.02 | O&M (EXCLUDING ENERGY CHARGES) FOR 5 YEARS INCLUDING 1% LABOUR CESS | 1 | Nos | 32,90,00,000 | ₹32,90,00,000 |
| 2The Total value of Schedule4 | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_346895.xls
BOQ Document • 0.29 MB
74279821.pdf
Tender Document • 0.12 MB
RFP31.pdf
Tender Document • 1.00 MB
DA31.pdf
Tender Document • 2.53 MB
74279823.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .