Loading…
Loading…
Tender Value
₹2.4 L
EMD Value
₹2,400
Closing Date
30 Sept 2026, 2:00 pm3d left
SUPERINTENDING ENGINEER
OFFICE OF SUPERINTENDING ENGINEER ,KEDC KARUR
Improvement works of the existing Assistant Engineer O and M Palaviduthi office toilet and provision of water storage sump etc in Palaviduthi 33KV Substation premises at Karur
2026_EB_705008_1
SPEC 05/2026-2027
Open Tender
Civil Works
Works
60 days
KARUR
AS PER SPEC
2 documents required · 2 mandatory
₹0
₹2,400
Yes
16 Sept 2026
16 Sept 2026
1 Oct 2026
16 Sept 2026
30 Sept 2026
16 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Name of the works | |||||
| 1.01 | Chipping of concrete and roughening the surface including cost of labour charges etc.,complete. | 3.5 | M2 | 100 | ₹350 |
| 1.02 | Chipping of old damaged plastered walls with clean removal of cement plaster from walls and racking out joints 20 mm deep for replastering including cost of all materials, labour, lead, lift etc complete. | 32.5 | M2 | 100 | ₹3,250 |
| 1.03 | Dismantling of wooden doors, windows and clearing away and stocking the materials suitable for reuse as directed by the Engineer incharge of work including cost of all labour, lead, lift etc., complete. | 3 | M2 | 100 | ₹300 |
| 1.04 | Dismantling the existing terracing of pressed roof tiles work and removing them away as directed by the depatment engineer in charges including cost of labour , lead, lift, scaffloding charges etc complete. | 4 | M2 | 100 | ₹400 |
| 1.05 | Dismantling Plain Cement Concrete removing them away as directed by the depatment engineer in charges including cost of labour , lead, lift, scaffloding charges etc complete. | 0.7 | CUM | 100 | ₹70 |
| 1.06 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete. | 1.65 | CUM | 100 | ₹165 |
| 1.07 | Earthwork excavation in soft disintegrated rock laterite soft rock or kankar not requring blasting, etc, complete | 1.1 | CUM | 100 | ₹110 |
| 1.08 | Earthwork excavation in medium rock and dense medium rock not requiring blasting. | 2.75 | CUM | 100 | ₹275 |
| 1.09 | Supplying and filling of M sand in foundation and basement with well watering and consolidation as per std.specn. including cost of all labour, lead, lift, etc, complete. | 0.8 | CUM | 100 | ₹80 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_847451.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .