Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.0 LAccepted-AOC | L1 | Accepted-AOC L1 PARTY |
| Sl No | Description | Qty | Unit | SNEHALATHA D L1 |
|---|---|---|---|---|
| 1.00Demolishing AC/FRP/Metallic/Polymer Sheets from all heights | ||||
| 1.01 | Demolish AC/FRP/ PVC sheet in roofing/cladding/walling/louvers partly or completely including removal of debris away from the site to scrap yard , all type polycoated bolts,nuts and washer, labour charges,scaffolding charges,tools, tackles etc complete at all heights and upto a lead of 500m] | 203.89 | sqm | 124 ₹25,281.99 Lowest |
| 2.00Dismantling AC/FRP/Metallic/Polymer Sheet . Up to 10 m level | ||||
| 2.01 | Dismantling existing AC / FRP sheet/PVC sheet carefully in roofing including ridges, hips, valleys and gutters etc.,including all type polycoated bolts,nuts and washer etc; and lowering and stacking reusable material within 500 metres lead including tools tackles, labours, scaffolding etc all.Up to 10m level. | 2,799.5 | sqm | 118 ₹3,30,341 Lowest |
| 3.00Dismantling AC/FRP/Metallic/Polymer Sheet from 10m to 20 m level | ||||
| 3.01 | Dismantling existing AC / FRP sheet/PVC sheet carefully in roofing including ridges, hips, valleys and gutters etc.,including all type polycoated bolts,nuts and washer etc; and lowering and stacking reusable material within 500 metres lead including tools tackles, labours, scaffolding etc all. from 10mtr to 20mtr level | 3,899.5 | sqm | 118 ₹4,60,141 Lowest |
| 4.00Dismantling AC/FRP/Metallic/Polymer Sheet from 20 m to 30 m from GL level | ||||
| 4.01 | Dismantling existing AC / FRP sheet/PVC sheet carefully in roofing including ridges, hips, valleys and gutters etc.,including all type polycoated bolts,nuts and washer etc; and lowering and stacking reusable material within 500 metres lead including tools tackles, labours, scaffolding etc all. from 20mtr to 30mtr level | 750 | sqm | 120 ₹90,000 Lowest |
| 5.00Dismantling AC/FRP/Metallic/Polymer Sheet from 30m to 40 m level | ||||
| 5.01 | Dismantling existing AC / FRP sheet/PVC sheet carefully in roofing including ridges, hips, valleys and gutters etc.,including all type polycoated bolts,nuts and washer etc; and lowering and stacking reusable material within 500 metres lead including tools tackles, labours, scaffolding etc all. from 30mtr to 40mtr level | 400 | sqm | 122 ₹48,800 Lowest |
Tender Value
₹28.0 L
EMD Value
₹50,000
Closing Date
15 Apr 2025, 3:00 pmClosed
HOU(TP)
KMML,CHAVARA
Demolishing, Fixing AC/FRP/metallic sheet roofing/walling.Fixing cladding AC/FRP sheet.Replacing L/J bolts.Fixing AC/FRP ridges,barge boards,louvers and valley gutters. plastering over AC/FRPsheet edges,cleaning over roof sheets/valleys
2025_KMML_755540_1
EAF/CIV/1169/2024-2025 Dtd04/03/2025
Open Tender
Civil Works - Others
Item Rate
365 days
KMML, CHAVARA
As per tender documents
6 documents required · 6 mandatory
₹2,950
₹50,000
3 Nov 2025
2 Apr 2025
16 Apr 2025
2 Apr 2025
15 Apr 2025
2 Apr 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .