| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.0 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹60.5 Cr+₹1.5 Cr (2.54%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Rejected-Technical | - | Rejected-Technical Dis-Qualified |
| Sl No | Description | Qty | Unit | GSR INFRATECH PVT LTD L1 | M/s Krishna Constellation Private Limited L2 |
|---|---|---|---|---|---|
| 1.00 | Road and Service Road Work
Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 18,796.46 | Cum | 34 ₹6,39,079.64 Lowest | 35 ₹6,57,876.1 |
| 2.00 | Construction of embankment with approved material obtained from borrow pits of >5% CBR Soil (identified by contractor himself) with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5, including haulage of materials by tipper including cost of loading, unloading and stacking complete. | 94,793.74 | Cum | 463 ₹4,38,89,501.62 Lowest | 475 ₹4,50,27,026.5 |
| 3.00 | Construction of embankment with approved material obtained from borrow pits (identified by contractor himself) with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5. for Shoulders/Patri. | 2,592.2 | Cum | 464 ₹12,02,780.8 Lowest | 475 ₹12,31,295 |
| 4.00 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 11,187.87 | Cum | 366 ₹40,94,760.42 Lowest | 375 ₹41,95,451.25 |
| 5.00 | By Mix in Place Method
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.l | 17,503.2 | Cum | 2,170 ₹3,79,81,944 Lowest | 2,225 ₹3,89,44,620 |
| 6.00 | Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. (By Mechanical Means with lead) | 22,044 | Cum | 3,105 ₹6,84,46,620 Lowest | 3,185 ₹7,02,10,140 |
| 7.00 | Medium porosity Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502. | 88,176 | Sqm | 48 ₹42,32,448 Lowest | 49 ₹43,20,624 |
| 8.00 | Tack Coat on Bituminous surfaces (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.) | 2,85,945 | Sqm | 12 ₹34,31,340 Lowest | 13 ₹37,17,285 |
| 9.00 | Providing and laying Dense Bituminous Macadam with the use of batch
type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.25% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. Grading II - 26.5mm nominal size | 11,847.26 | Cum | 8,880 ₹10,52,03,668.8 Lowest | 9,100 ₹10,78,10,066 |
| 10.00 | Providing and laying Bituminous Concrete with the use of batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects for Grading-II (bituminous binder @ 5.4 % of mix) | 7,713.29 | Cum | 10,250 ₹7,90,61,222.5 Lowest | 10,500 ₹8,09,89,545 |
Tender Value
₹62.6 Cr
EMD Value
₹1.3 Cr
Closing Date
15 Jan 2026, 3:00 pmClosed
Superintending Engineer
Office of Superintending Engineer P. D. P.W.D. Rudrapur. Rudrapur
Conversion Of Two Lane to Four Lane of Nagla Kichha Sh-4 from Km 4.850 to 12.600 and Km 15.000 to 17.942 in Kichha Constituency of District Udham Singh Nagar at Rudrapur Distt Udam Singh Nagar
2025_pwd_88335_1
2218/23M-04/2025 Date 21.10.2025
Open Tender
Civil Works - Roads
Item Rate
365 days
Kichha
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Executive Engineer P. D. P.W.D. Rudrapur
₹1.3 Cr
Rudrapur
18 May 2026
25 Oct 2025
16 Jan 2026
25 Oct 2025
15 Jan 2026
10 Nov 2025
7 Nov 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Road and Service Road Work
Excavation in Soil with Dozer with lead upto 100 m Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 1 | Cum | - | - |
| 2 | Construction of embankment with approved material obtained from borrow pits of >5% CBR Soil (identified by contractor himself) with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5, including haulage of materials by tipper including cost of loading, unloading and stacking complete. | - | Cum | - | - |
| 3 | Construction of embankment with approved material obtained from borrow pits (identified by contractor himself) with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5. for Shoulders/Patri. | 1 | Cum | - | - |
| 4 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | - | Cum | - | - |
| 5 | By Mix in Place Method
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.l | - | Cum | - | - |
| 6 | Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. (By Mechanical Means with lead) | - | Cum | - | - |
| 7 | Medium porosity Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502. | - | Sqm | - | - |
| 8 | Tack Coat on Bituminous surfaces (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.) | 0.29 | Sqm | - | - |
| 9 | Providing and laying Dense Bituminous Macadam with the use of batch
type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.25% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. Grading II - 26.5mm nominal size | - | Cum | - | - |
| 10 | Providing and laying Bituminous Concrete with the use of batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects for Grading-II (bituminous binder @ 5.4 % of mix) | 1 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
Tendernotice_2.pdf
PDF • 1.70 MB
BOQ_104817.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .