Tender Value
₹10.4 L
EMD Value
₹12,000
Closing Date
8 Jun 2026, 6:00 pm3d left
Executive Engineer R and B Division, Palanpur
S R To Sarkari Vasahat at Palanpur Ta : Palanpur Dist : Banaskantha (Pro. Compound wall and Misc work)
308385
4 of 2026-27
Open
Civil - All
Banaskantha
10 documents required · 10 mandatory
₹900
Executive Engineer, R and B Division, Palanpur
₹12,000
25 May 2026
25 May 2026
25 May 2026
8 Jun 2026
25 May 2026
Name of Work :S R to Sarkari Vasahat at Palanpur Dist : Banaskantha (Pro. Compound Wall & Misc.
l\,4emorandum showing item of work to be carried out
It Quantity Item Description Estimated Rate Unit TotalAmount
No Estimated (in Rs.) according to
But may be estimated
ln Fiture ln Words
more or less quantities
1, 41,.40 Excavation for foundation upto 1.5 m depth including sorting out 122.94 Rupees One Hundred Cu. N,4 5
and stacking of useful materials and disposing off the excavated Twenty Two And
stuff upto 50 Meter lead.(A) Loose or soft soil Paise N inety Four
2 9.00 Providing and aying cement concTete 1:3:6 (1-Cement : 3- coarse 2978.97 Rupees Two Cu.M 26810.7I
sand : 6- hand broken stone aggregates 40 mmnominal size) and Thousand Nine
curing complete excluding cost of formwork in (A) Foundation and Hundred Seventy
Eight And Paise
Ninety Seven Only
3 22.20 Brick work usinB common burnt clay building bricks having crus ring 4214.33 Rupees Four Cu. M
strength not less than 35 kg./Sq.Cm. in foundation and plintt in Thousand Two
Cement Mortar 1:6 (1- Cement : 6 -fine sand) (B) Conventional Hundred Fourteen
And Paise Thirty
4 15.5 0 Provlding and laying cement concrete work 1:2;4 (1- Cement:2- 4423.42 Rupees Four CU,M
Coarse sand : 4- graded stone aggregates 20 mm nominal size) and Thousand Twenty
curing complete excluding cost of formwork and reinforcement for Three And Paise Forty
reinforced concrete work in (B) 5iabs, landing, shelves, Balconis , Two Only
Llntels, Beams, Glrders and Cantilever upto floor two level.
It. Quantity Item Description Estimated Rate Unit TotalAmount
No. Estimated (in Rs.) according to
But may be estimated
ln Figure ln Words
more or less quantities
5 10.40 Demolition of Brick work and stone masonry including stacking of 374.1,4 Rupees Three Cu.M 3
serviceable materilas and disposal of unserviceable materials with Hundred Seventy
all lead and lift. (i) ln Lime Mortar
6 49.70 Brick work using common burnt clay building bricks having crushing 4496.05 Rupees Four C u.lvl
strength not less than 35 kg./Sq.Cm. in foundation and plinth in Thousand Four
Cement Mortar 1:6 (L'Cement:6 -fine sand) (B) conventional Hundred Ninety Six
(superstructure above plinth level upto floor two level) And Paise Five Only
7 1024.50 Remov ng and scraping of old deteriorated plaster of any thickness 19.89 Rupees Nineteen And Smt 2037
fromm wall / R.C.c member including stacking of serviceable Paise Eighty N ine Onlv
material and disposal of unserviceable from site of work with all lead
E 95 5.7 0 20mm thick sand faced cement plaster on walls upto height 10 320.70 Rupees Three Sq.Mt
metres above ground level consisting of 12mm thick backing coat of Hundred Twenty And
C.lv]. 1:3 (1-cement : 3-sand) and 8mm thick finishing coat of C.M. Paise Seventy Only
1:1 (1-cement : 1-sand) etc. complete
9 e6lJa Finishing wall with weather proof exterior emulsion paint on wall 73.83 Rupees Seventy Three 5q.Mt 7
surface (two coats) to give an required shape even shade after And Paise Eighty
thoroughly brushing the surface to remove all dirt, and remains of Three Only
loose powd ered materials.etc complete
10 65 3.00 Dismentling barbed wire in fencing including making rolls and also 68.14 Rupees Sixty Eight Rmt
including dismentling fencing posts including all earth work concrete And Paise Fourteen
in base and making good the disturbed ground stacking useful Only
materials as directed and disposing as directed and disposing of the
unserviceable rnaterials with all lead and lift.
It QuantitY Item Description Estimated Rate Unit TotalAmouht
No Estimated (in Rs.) according to
sut;#ue ln FiBure ln Words
mote ot less quantities
11 653.00 Providing and fixing RAZOR Coil with Blade 16MM, Clips per Spiral-5, 274.72 Rupees Two Hundred Rmt 179392.1-6
Hot Dlpped Galvanized 200 GSM, Tape Thickness 0.50 MM, Gl Spring Seventy Four And
Core Wire 2.60MM Thick {avg weight 9.50 KC I 6 mt}, and 5 Rows o Paise Seventv Two
galvanised steel barbed wire weighing 9.38 Kg. per 100 Metre in
M.S. Angle posts 45 mm. X 45 mm. X 6 mm. and oil painting 3 coats
flxed at 3.0 mt. C/C strained and fixed to posts with G.l. staples,
including fixing posts in compound wall as per requirement.
Rupees Ten Lakh(s) Thirty Six Thousand Four Hundred Seventy Nine And Paise Forty Three Only
l/am we/are willing to carry out the work at _% above /below percent (should be written in figures and words) of
the estimated rates mentioned above. Arnount of my/our tender works out as under
* Estimated amount put to tender * Estimated amount put to tender
Ded uct :_ %below Rs Add :_ %above Rs
Net Rs. Net Rs.
ln words ln words
{* Strike whichever is not applicable.} ix Strike whichever is not applicable.)
Signature of Contractor Executive Engineer
R&BDn.,Palanpur
It Quantity Item Description Estimated Rate Unit TotalAmount
Estimated (in Rs.) according to
But may be estimated
more or less quantities
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-ln- Charge for which no
extra payment shall be made.
2 credit Amount Rs. 7008.40 for disrnantling of rr-raterials shall be deducted from nrnning account bill
3 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
4 GST and lncome tax TDS will be deducted at a source while making payments of bills
5 ln all R.C.C. ltems in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement
Consum ption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C, items where there is a change as per actual mix design the
cost of difference of cement consumption have been deducted from the rate of origlnal item at the rate of input rate mentioned in all the
Signatu re of Contractor Executive Engineer
R&BDn.,Palanpur
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. SBD sarkkari Vasahat Pln Part1.pdf
2. SBD sarkkari Vasahat Pln Part2.pdf
3. SBD sarkkari Vasahat Pln Part3.pdf
4_ Govt GR.pdf
7. sarkkari Vasahat Pln Index Spe_Part1.pdf
5. Sarkari vasaht pln BOQ.pdf
8. sarkkari Vasahat Pln Index Spe_Part2.pdf
9. sarkkari Vasahat Pln Index Spe_Part3.pdf
9. Test Schedule.pdf
Performance Bond and Bitumen date.pdf
Download all tender documents and submit your bid