Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.6 LAccepted-AOC WARD NO 4 NETA NAGAR SULTANPUR PATTI TEHSIL BAZPUR U S NAGAR RAMNAGAR | UDAM SINGH NAGAR | UTTARAKHAND | 244712 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹47.6 L+₹99,367 (2.13%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹48.6 L+₹2.0 L (4.30%)Rejected-Finance KHASRA NO 203 KHARAKPUR DEVIPURA KASHIPUR | KASHIPUR | L3 | Rejected-Finance Rejected | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹46.7 L
EMD Value
₹94,000
Closing Date
4 Mar 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Superintending Engineer EDC Ranikhet
Replacement of GI wire in different villages under EDSD Molekhal under EDD Bhikiyasain
2024_UPCL9_69472_1
EDC(R)-56/2023-24
Open Tender
Electrical Works
Item Wise
90 days
Bhikiyasain
As per Tender document
2 documents required · 2 mandatory
₹2,360
Executive Engineer
₹94,000
6 Nov 2024
13 Feb 2024
5 Mar 2024
13 Feb 2024
4 Mar 2024
13 Feb 2024
Amount
NON-CENTRALIZED MATERIAL (SUPPLY)
LT Clamp with N&B ST Pole SP-21
Stay Clamp for SP-21 with Nut & Bolt
Shackle Insulator 75x90 mm with Nut & Bolt
Stay Insulator
LABOUR PART
Excavation of pit for stay set
Erection of LT stay set
Grouting of stay set
Excavation of pit for pole
Erection of Single SP-21 Pole
Grouting of Pole
Muffing of Pole
Dismantling of LT line 1 P 2 w (Weasel)
Cartage SP-21/23 pole 150-200 Km
Cartage of petty material, 150-200 Km
Headload Cartage SP-21/23 pole (1-3 Km)
Headload Cartage of Material (1-3 km)
Disconnection & Reconnection of consumer
Laying weasel for Neutral on LT
Yusuf Hussain Contractor
KUMAUN ELECTRICALS
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .