| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹68.5 LAdmitted-Finance | -14.86% | ₹68.5 L | L1 | Admitted-Finance |
| 2 | L2₹76.9 L+₹8.4 L (12.2%)Admitted-Finance | -4.44% | ₹76.9 L+₹8.4 L (12.2%) | L2 | Admitted-Finance |
| 3 | L3₹79.7 L+₹11.2 L (16.3%)Admitted-Finance | -1.00% | ₹79.7 L+₹11.2 L (16.3%) | L3 | Admitted-Finance |
Tender Value
₹95.0 L
EMD Value
₹1.9 L
Closing Date
24 Jun 2026, 5:00 pmClosed
DIRECTOR (H)
SECTOR-39, NOIDA
M/o Park (Annual Maintenance of Shaheed Bhagat Singh Park in Sector-150), Noida. (Civil Work)
2026_NOIDA_1161466_1
03/D(H)/DD(H)-III/2026-27
Open Tender
Civil Works - Others
Fixed-rate
365 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,832
NOIDA
₹1.9 L
3 Aug 2026
18 Jun 2026
25 Jun 2026
18 Jun 2026
24 Jun 2026
18 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sum on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be leveled and neatly dressed. All kinds of soil The contractor has to detect different utilities like sewer line water supply line electric cable telephone cable gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer -in Charge . | 20 | Cum | 136 | ₹2,720 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth sides of foundations etc in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering lead upto 50 m and lift upto 1.5 m | 20 | Cum | 93 | ₹1,860 |
| 3 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 meters lead as per direction of Engineer - in - charge. Nominal concrete Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) . (i/c equivalent design mix) . | 50 | Cum | 923.42 | ₹46,171 |
| 4 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. In cement mortar | 10 | Cum | 779.76 | ₹7,797.6 |
| 5 | Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 1,000 | Sqm | 101.39 | ₹1,01,390 |
| 6 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 85 | Cum | 120.55 | ₹10,246.75 |
| 7 | Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length (total length 90 m), having 50 nos rounds por 6 metre length, upto 3 m height of wall with existing angle iron Y shaped placed 2.4m or 3.00 m apart and with 9 horizontal RBT reinforced barbed wire, stud tied with G.I staples and G.I, clips to retain horizontal, including necessary bolls or GI barbed wire tied to angle iron, all complete as per direction of Engineer in-harge, with reinforced barbed tape(R.BT)/ Spring core (2.5mm thick) wire of high tensile strength of 165 kg/sq mm with lape (0 52 mm thick) and weight 43.478 gm/ metre (cost of M S angle, C.C blocks shall be paid separately) | 300 | Mtr. | 232.64 | ₹69,792 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 90 | Cum | 5,746.88 | ₹5,17,219.2 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size). | 75 | Cum | 6,753.45 | ₹5,06,508.75 |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 100 in foundation and plinth in : Cement mortar 1:4 (1 cement : 4 coarse sand) | 20 | Cum | 5,214.8 | ₹1,04,296 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
03.pdf
Tender Documents • 5.73 MB
Capability.xls
Additional Documents • 0.05 MB
NITspecialconditions2026.pdf
Additional Documents • 2.52 MB
BOQ_2177087.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .