| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.7 LAccepted-AOC BASSI UNDER BASSI POWER HOUSE DIVISION HPSEBL JOGINDER NAGAR | SHIMLA | HIMACHAL PRADESH | 171001 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹43.0 L+₹6.3 L (17.2%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹44.3 L+₹7.6 L (20.7%)Rejected-Finance | L3 | Rejected-Finance Rejected | |
| 4 | L4₹44.5 L+₹7.8 L (21.3%)Rejected-Finance CONTRACTOR WARD NO 10 DEVINAGAR PAONTA SAHIB DISTRICT SIRMOUR H P | SIRMAUR | HIMACHAL PRADESH | 173001 | L4 | Rejected-Finance Rejected | |
| 5 | L5₹50.5 L+₹13.8 L (37.5%)Rejected-Finance | L5 | Rejected-Finance Rejected |
Tender Value
₹51.0 L
EMD Value
₹84,000
Closing Date
26 Mar 2019, 11:00 amClosed
Execuitve Engineer
HP City Transport and BSMDA TutiKandi Shimla 4
SH P/L C.C. interlocking Pavers blocks in the bus movement Area( Phase-I).
2019_BSMDA_28426_2
HPBSMDA/EE/(2)/2018 tENDERS (VOL-II)
Open Tender
Civil Works - Buildings
Item Rate
60 days
Nahan
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,000
CEO HP CT BSMDA
₹84,000
19 Aug 2021
12 Mar 2019
26 Mar 2019
14 Mar 2019
26 Mar 2019
14 Mar 2019
Amount
Demolition below G.L. Upto all thickness/ depths and dressing the ground and level including disposal of un -serviceable materials up to approved dumping site : Un reinforced cement concerte Including carriage of all labour equipment and material to various locations through all modes of transportation, all incidental charges. including all leads, lifts and carriage of materials and complete in all respect of as per entire satisfaction of the Engineer in charge.
Excavation in foundations, trenches etc. in earth work in all kind of soils, such as pick work, jumper work,blasting work, by blasting or chieling and pumping bailing, dewatering where ever required etc. complete and lift up to all heights and then clear from the edge of the excavation and then returning the stacked soil in 15 cm, layers, when required in to plinths sides of foundations etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth up to approved dumping site , including all leads, lifts and carriage of materials and as per entire satisfaction of the Engineer-in charge. Any loss of Govt.and private property during the execution of work the absulte responsibilty of the contractor.
Providing and laying cement concrete 1:3:6 (1 cement:3 sand:6 graded stone aggregate 20 mm nominal size) and curing Complete excluding cost of form work in: Foundation & Plinths. Including carriage of all labour equipment and material to various locations through all modes of transportation and all incidental charges with all leads, lifts and complete in all respect of as per entire satisfaction of the Engineer in charge.
Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm, so as to give a fair finish including centring, shuutering,strutting and propping etc.with wooden battens and ballies, height of proppingand centring below supporting floor to ceiling not exceeding Mtrs. and removal of the same for insitu-reinforced concrete & plain concrete work in: Beams, cantilever, girders and lintels.Sides and soffits of beams, beam haunchings, cantilevers, bressumers and lintels in all depths and heights.,Including carriage of all labour equipment and material to various locations through all modes of transportation and all incidental charges with all leads and lifts and complete in all respect of as per entire satisfaction of the Engineer in charge.
Providing and laying cement concrete 1:1.5:3 (1 cement:1.5 sand:3 graded stone aggregate 20mm nominal size) mechanically mixed, vibrated and curing complete excluding cost of form work and reinforcement for reinforced concrete work : Suspended floors, roofs, landing, shelves and their supports, balconies, beams, griders and bressumers and cantilevers upto alll floors, heights and levels. Including carriage of all labour equipment and material to various locations through all modes of transportation and all incidental charges with all leads, lifts and and complete in all respect of as per entire satisfaction of the Engineer in charge.
Providing tor steel reinforcement for reinforced cement concrete work including bending binding and placing in position including cost of binding wire complete as per structural drawing and design in all floors up to all heights and levels, Including carriage of all labour equipment and material to various locations through all modes of transportation and all incidental charges,including all leads, lifts and complete in all respect of as per entire satisfaction of the Engineer in charge.
Providing and laying heavy duty precast cement conrete inter locking paver blocks ISI marked (NTC or equalent ) vibro compacted upto M 50 grade i/c border or kurb block grey or coloured over sub-base of concrete with 25mm thick average thickness of cement mortar 1:4 (1 cement : 4 sand) laid over and jointed with neat cement slurry mixed with pigment to match the shade of blocks i/c curing rubbing & polishing complete (Sub base concrete floor to be paid for sepretaly) : 100mm thick Pavers, Including carriage of all labour equipment and material to various locations through all modes of transportation, all incidental charges,including all leads, lifts and complete in all respect of as per entire satisfaction of the Engineer in charge.
AIDANT IMPLEMENTATION PRIVATE LIMITED
Lal Singh Chauhan Contractor
DINESH KUMAR GUPTA
Ram Pal Saini
Ankush kumar
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .