Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81 LAdmitted-Finance 1ST 5TH FLOOR INDUSTRY HOUSE 45 FAIR FIELD LAYOUT RACE COURSE ROAD BENGALURU 560001 | BENGALURU URBAN | KARNATAKA | 560001 | ₹81 L | L1 | Admitted-Finance |
| 2 | L2₹85 L+₹4 L (4.94%)Admitted-Finance 71 CUNNINGHAM ROAD VASANTH NAGAR BANGALORE BANGALORE KARNATAKA 560052 | BENGALURU URBAN | KARNATAKA | 560052 | ₹85 L+₹4 L (4.94%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 Cr+₹48.5 L (59.9%)Admitted-Finance | ₹1.3 Cr+₹48.5 L (59.9%) | L3 | Admitted-Finance |
| 4 | L4₹1.6 Cr+₹74.9 L (92.5%)Admitted-Finance UNIT NO 2702 27TH FLOOR RUPA RENAISSANCE PLOT D 33 D 207 JUINAGAR MIDC TTC INDUSTRIAL AREA TURBHE NAVI MUMBAI THANE MAHARASHTRA 400705 | THANE | MAHARASHTRA | 400705 | ₹1.6 Cr+₹74.9 L (92.5%) | L4 | Admitted-Finance |
| 5 | L5₹2.0 Cr+₹1.2 Cr (144.8%)Admitted-Finance | ₹2.0 Cr+₹1.2 Cr (144.8%) | L5 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
19 Dec 2019, 6:00 pmClosed
B K BHATTACHARYA, AGM (E-C)
OFFICE OF Executive Director Engg-WR B- Block ,3rd floor, Engineering Wing Rajiv Gandhi Bhawan, New Delhi-110003.
Engineering Consultancy for Development of Dholera Greenfield International Airport in village Navagam of District Ahmedabad (Gujarat) Phase-1
2019_AAI_36663_1
AAI/CHQ/ENGG/WR/DHOLERA
Open Tender
Consultancy
Lump-sum
120 days
RAJIV GANDHI BHAWAN, NEW DELHI
As per NIT
14 documents required · 14 mandatory
₹1,180
Yes
Airports Authority of India
₹5 L
Yes
20 Jan 2020
27 Nov 2019
27 Dec 2019
28 Nov 2019
19 Dec 2019
5 Dec 2019
29 Nov 2019 - 3 Dec 2019
Amount
“Engineering Consultancy for “Development of Dholera Greenfield International Airport” in village Navagam of District Ahmedabad (Gujarat)” Phase-1 which include following activities but not limited to • Site survey/ Topographical Survey and Hydrological Survey HFL etc. • Ground improvement, Geo technical investigation of proposed Aerodrome site and Borrow pit area :- (Soil test report including recommendations shall be provided by AAI) • Preparation of final profile levels of Runway, Apron and Taxiway etc. • Ball park estimate for the Terminal building and other ancillary buildings and other planned infrastructure • Preparation of Detailed Project Report (DPR) • Preparation of Layout Plan and Conceptual Drawings.
Note: 1. Agency has to quote Lumpsum fee which shall be excluding GST. 2. GST shall be paid to the Agency for any taxable supply/Services against a valid tax invoice. 3. In case of non-compliance of GST provisions, the Agency shall be responsible for the same and shall indemnify AAI for the loss, if any, suffered by AAI.
TATA Consulting Engineers Ltd.
MECON Limited
STUP Consultants Pvt. Ltd.
AECOM ASIA COMPANY Limited
Egis India Consulting Engineers Pvt. Ltd.
Nippon Koei India Pvt. Ltd.
Dorsch Consult India Private Limited
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .