Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹86,711.75Accepted-Finance | ₹86,711.75 | L1 | Accepted-Finance L1 |
| 2 | L2₹97,252.09Accepted-Finance | ₹97,252.09 | L2 | Accepted-Finance L2 |
| 3 | L3₹1.0 LAccepted-Finance | ₹1.0 L | L3 | Accepted-Finance L3 |
| 4 | L4₹1.0 LAccepted-Finance | ₹1.0 L | L4 | Accepted-Finance L4 |
| 5 | L5₹1.0 LAccepted-Finance | ₹1.0 L | L5 | Accepted-Finance L5 |
Tender Value
Refer Docs
EMD Value
₹3,000
Closing Date
9 Jan 2026, 2:00 pmClosed
Superintending Engineer
SE ECTC SLDC Campus UPPTCL, Lucknow
Construction of ALP Foundation and Cable Trench for Modification Of 33 KV Greyforce Bay and Related Civil Works at 132/33 KV Sub station, Bacchrawa, Raebareli
2025_UPCTL_1102820_1
87/ECTC(L)/2025-26
Open Tender
Civil Works
30 days
SE ECTC SLDC Campus UPPTCL, Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Superintending Engineer, E.C.T.C. Lucknow
₹3,000
13 Mar 2026
30 Dec 2025
10 Jan 2026
30 Dec 2025
9 Jan 2026
30 Dec 2025
Construction of ALP Foundation and Cable Trench for Modification Of 33 KV Greyforce Bay and Related Civil Works at 132/33 KV Sub station, Bacchrawa, Raebareli.
Please Enable Macros to View BoQ information
Bill Of Quantity for Construction of ALP Foundation and Cable Trench for Modification Of 33 KV Greyforce Bay and Related Civil Works at 132/33 KV Sub station, Bacchrawa, Raebareli.
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. DSR 2.31
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : CC 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 4.1.2
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 Cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) DSR 4.1.10
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete (DSR 5.9.1)
Neat cement punning. DSR 13.18
(GST Extra) Total Rs.=
Conditions-
All civil work shall be executed according to the approved drawings of UPPTCL
All quantites in BOQ are tentative and may vary to any extent or deleted during execution as per actuall approved layout plan and side condition.
The quartiles in BOQ are tentative and may vary up to any safers or be deleted as per the requirement at site.
All Civil Work Shall be carried out as per UPPWD/UPPTCL specification.
All Rates in BOQ are exclusive of CGST.SGST Labour tax shall be borne by contactor.
Pozzlona Portland cement confirming to is 1489 (part 1) 1991 of approved quality like AGC, Ultra Tech, Birla or equl shall any be used.
Overweight steel section withen tolerance shall be measured at standard weight and underweight steel section within Tolarence shall be measured at actuel weight.
In case any change in of Quantity is suggested by higher authority that will be binding on the contractor the agreement shall be execured on the approved Bill of Quantity only.
Performance Guarantes shall be applicable as per GO 62223-12-2012-2 audit 108 Dt 08/06/2012 adopted by UPPTCL BOQ dated 27-06 2017
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.37 MB
Tendernotice_2.pdf
PDF • 0.59 MB
BOQ_2033580.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid