| 1 | L1₹69.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹77.5 L+₹8.2 L (11.8%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | K R PAULSON L2 | ANOOP P DIVAKARAN L1 |
|---|---|---|---|---|---|
| 1.00Construction of School building | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 56.86 | cum | 359.72 ₹20,452.6 | 297.12 ₹16,893.35 Lowest |
| 1.00 | 2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock | 65.47 | cum | 656.47 ₹42,979.09 | 542.24 ₹35,500.45 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 26.72 | cum | 6,679.49 ₹1,78,489.33 | 6,552.56 ₹1,75,097.51 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 111.84 | sqm | 325.14 ₹36,363.66 | 318.96 ₹35,672.49 Lowest |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 269.22 | sqm | 849.19 ₹2,28,618.93 | 833.06 ₹2,24,276.41 Lowest |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 365.83 | sqm | 642.34 ₹2,34,987.24 | 630.13 ₹2,30,520.46 Lowest |
| 1.01 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 79.7 | sqm | 860.47 ₹68,582.9 | 844.12 ₹67,279.74 Lowest |
| 1.01 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) | 36.27 | sqm | 694.49 ₹25,189.15 | 681.29 ₹24,710.39 Lowest |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 308.65 | sqm | 809.36 ₹2,49,805.73 | 793.98 ₹2,45,058.75 Lowest |
Tender Value
₹83.9 L
EMD Value
₹50,000
Closing Date
30 Sept 2025, 11:30 amClosed
Superintending Engineer,
O/o Superintending Engineer, PWD Buildings Central Circle Thrissur
GENERAL-Construction of New Building for Govt. Higher Secondary School Iranikulam (For High School )-Building for High School- General Civil Work
2025_PWD_799048_1
PWD/BLDG/TR/8801/2025-26
Open Tender
Civil Works - Buildings
Item Rate
510 days
Iranikulam
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
₹50,000
4 Nov 2025
20 Sept 2025
3 Oct 2025
20 Sept 2025
30 Sept 2025
20 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .