Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹96.8 LAccepted-AOC PUBERUN PATH HOUSE NO 48 HATIGAON GUWAHATI 781038 ASSAM | GUWAHATI | KAMRUP METRO | ASSAM | 781038 | ₹96.8 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹98.5 L+₹1.7 L (1.73%)Rejected-AOC ANANDA T E DAKHIN RUPAHI PO PATHALIPAM DIST LAKHIMPUR ASSAM INDEX NO E 47 CWE AF JORHAT | ₹98.5 L+₹1.7 L (1.73%) | L2 | Rejected-AOC Not Being L1 |
| 3 | L3₹1.1 Cr+₹16.0 L (16.5%)Rejected-AOC GATANGA MISSION CHARALI TEZPUR 784154 ASSAM | SONITPUR | ASSAM | 784154 | ₹1.1 Cr+₹16.0 L (16.5%) | L3 | Rejected-AOC Not Being L1 |
| 4 | L4₹1.2 Cr+₹19.3 L (19.9%)Rejected-AOC PO KETEKIBARI DISTT SONITPUR TEZPUR ASSAM 784001 | SONITPUR | ASSAM | 784001 | ₹1.2 Cr+₹19.3 L (19.9%) | L4 | Rejected-AOC Not Being L1 |
| 5 | L5₹1.2 Cr+₹25.4 L (26.2%)Rejected-AOC H M APARTMENT 4C S J ROAD ATHGAON GUWAHATI 781001 | GUWAHATI | KAMRUP METRO | ASSAM | 781001 | ₹1.2 Cr+₹25.4 L (26.2%) | L5 | Rejected-AOC Not Being L1 |
| Sl No | Description | Qty | Unit | M/s A.Rahim Talukdar L2 | M/S MOHANPASARI L3 | VARNI BUILDERS L4 | SUNIL KUMAR VERMA L1 | M/S. SUBHAS CONSTRUCTION CO. L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L for earth work in excavation by mechanical means (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, in all kind of soil complete all as specified and as directed. | 187.11 | Cum | 290 ₹54,261.9 | 300 ₹56,133 | 180 ₹33,679.8 Lowest | 198 ₹37,047.78 | 250 ₹46,777.5 |
| 2.00 | M&L for earth work in excavation by mechanical means (Hydraulic excavator) means over areas (exceeding 1.5 m but n exc 3.0m in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, in all kind of soil complete all as specified and as directed. | 50.99 | Cum | 360 ₹18,356.4 | 350 ₹17,846.5 | 260 ₹13,257.4 | 198 ₹10,096.02 Lowest | 300 ₹15,297 |
| 3.00 | M&L for treating the bottom and sides in contact with foundation at the rate of 5 litres of emulsion per square metre o surface complete all as specified and directed. | 483.49 | Sqm | 180 ₹87,028.2 | 150 ₹72,523.5 | 90 ₹43,514.1 | 125 ₹60,436.25 | 85 ₹41,096.65 Lowest |
| 4.00 | M&L for treating the backfill in contact with foundation at the rate of 7.5 litres of emulsion per square metre of vertical surface (Area of the sub structure in contact with backfill to be measured) complete all as specified and directed. | 168.16 | Sqm | 210 ₹35,313.6 | 100 ₹16,816 Lowest | 110 ₹18,497.6 | 175 ₹29,428 | 120 ₹20,179.2 |
| 5.00 | M&L for antitermite treatment by treating the top surface of filed earth at the rate of 5 litres of emulsion per square metre of surface etc complete all as specified and as directed. | 193.34 | Sqm | 170 ₹32,867.8 | 100 ₹19,334 Lowest | 100 ₹19,334 Lowest | 175 ₹33,834.5 | 120 ₹23,200.8 |
| 6.00 | M&L for Treating the soil under plinth protection at the rate of 5 litre of emulsion per square metre of surface area complete all as specified and directed. | 67.11 | RM | 95 ₹6,375.45 | 100 ₹6,711 | 90 ₹6,039.9 | 98 ₹6,576.78 | 85 ₹5,704.35 Lowest |
| 7.00 | M&L for treating the soil along with external perimeter of building at the rate of 2.25 litre of emulsion per metre of the perimeter wall complete all as specified and directed. | 70.61 | RM | 110 ₹7,767.1 | 100 ₹7,061 | 70 ₹4,942.7 Lowest | 125 ₹8,826.25 | 80 ₹5,648.8 |
| 8.00 | M & L for PCC 1:4:8, type D-2, using (40mm graded stone aggregate) as foundation, filling and mass concrete complete all as specified and as directed. | 25.61 | Cum | 5,600 ₹1,43,416 | 6,500 ₹1,66,465 | 5,600 ₹1,43,416 | 6,200 ₹1,58,782 | 5,500 ₹1,40,855 Lowest |
| 9.00 | Returning, filling in, including, spreading, levelling, watering and well ramming in layers not exc. 25 cm deep as in soil complete as specified. | 180.37 | Cum | 210 ₹37,877.7 | 300 ₹54,111 | 220 ₹39,681.4 | 25 ₹4,509.25 Lowest | 160 ₹28,859.2 |
| 10.00 | M&L for use and waste of form work to sides of concrete, foundation, footings & plinth beams and similar works with rough finished surfaces of concrete in flat complete all as specified and as directed. | 256.38 | Sqm | 380 ₹97,424.4 | 300 ₹76,914 Lowest | 460 ₹1,17,934.8 | 390 ₹99,988.2 | 450 ₹1,15,371 |
Tender Value
₹1.1 Cr
EMD Value
₹1.8 L
Closing Date
25 Jun 2026, 6:00 pmClosed
CWE AF Borjhar
HQ CWE AF Borjhar Military Engineer Services Post Airport Borjhar Guwahati Assam 781 015 Tele 0361 2841626
PROVISION OF GAS GODOWN AND CONNECTED INFRASTRUCTURE FOR VAYU SENA GAS AGENCY AND PROVN OF IRON GRILL COVER WATER TANKS PH- I IN DOMESTIC AREA AT AFS TEZPUR
2025_MES_746054_2
8969
Open Tender
Civil Works
Item Rate
365 days
Tezpur
As per tender documents
8 documents required · 8 mandatory
₹1,000
GE AF Tezpur
₹1.8 L
Yes
25 Sept 2026
11 Jun 2026
29 Jun 2026
11 Jun 2026
25 Jun 2026
18 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for earth work in excavation by mechanical means (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, in all kind of soil complete all as specified and as directed. | 187.11 | Cum | -10.75 | - |
| 2 | M&L for earth work in excavation by mechanical means (Hydraulic excavator) means over areas (exceeding 1.5 m but n exc 3.0m in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, in all kind of soil complete all as specified and as directed. | 50.99 | Cum | -9.75 | - |
| 3 | M&L for treating the bottom and sides in contact with foundation at the rate of 5 litres of emulsion per square metre o surface complete all as specified and directed. | 483.49 | Sqm | -8.75 | - |
| 4 | M&L for treating the backfill in contact with foundation at the rate of 7.5 litres of emulsion per square metre of vertical surface (Area of the sub structure in contact with backfill to be measured) complete all as specified and directed. | 168.16 | Sqm | -7.75 | - |
| 5 | M&L for antitermite treatment by treating the top surface of filed earth at the rate of 5 litres of emulsion per square metre of surface etc complete all as specified and as directed. | 193.34 | Sqm | -6.75 | - |
| 6 | M&L for Treating the soil under plinth protection at the rate of 5 litre of emulsion per square metre of surface area complete all as specified and directed. | 67.11 | RM | -5.75 | - |
| 7 | M&L for treating the soil along with external perimeter of building at the rate of 2.25 litre of emulsion per metre of the perimeter wall complete all as specified and directed. | 70.61 | RM | -4.75 | - |
| 8 | M & L for PCC 1:4:8, type D-2, using (40mm graded stone aggregate) as foundation, filling and mass concrete complete all as specified and as directed. | 25.61 | Cum | -3.75 | - |
| 9 | Returning, filling in, including, spreading, levelling, watering and well ramming in layers not exc. 25 cm deep as in soil complete as specified. | 180.37 | Cum | -2.75 | - |
| 10 | M&L for use and waste of form work to sides of concrete, foundation, footings & plinth beams and similar works with rough finished surfaces of concrete in flat complete all as specified and as directed. | 256.38 | Sqm | -1.75 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.18 MB
8969tender.pdf
Tender Documents • 1.04 MB
BOQ_863925.xls
BOQ • 0.46 MB
EMPLAN.pdf
Additional Documents • 0.55 MB
LD.pdf
Additional Documents • 0.86 MB
OFFICE_STORE_STRL_1.pdf
Additional Documents • 5.76 MB
gasgodownstrl_1.pdf
Additional Documents • 5.51 MB
GAS_GODOWN_STRL_2.pdf
Additional Documents • 5.29 MB
OFFICE_STORE_STRL_2.pdf
Additional Documents • 5.42 MB
PLAN_GAS_GODOWN.pdf
Additional Documents • 5.29 MB
PLAN_OFFICE_STORE.pdf
Additional Documents • 0.66 MB
SCH_OF_FINISHES.pdf
Additional Documents • 0.74 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .