Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 LAccepted-AOC | ₹19.8 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹19.8 LRejected-AOC | ₹19.8 L | L2 | Rejected-AOC Rejected |
| 3 | L3₹20.0 LRejected-AOC | ₹20.0 L | L3 | Rejected-AOC Rejected |
Tender Value
₹19.8 L
EMD Value
₹39,608
Closing Date
16 Jan 2026, 2:00 pmClosed
DE
ZP,ALIPORE,S24PGS,KOLKATA-700027
CONS. OF C.C. DRAIN WITH ANCILLARY WORK FROM SIDDHESWARI KALITALA TO TUSAR DAS HOUSE VIA DOLY PURKAIT LANT TI BILE HOUSE AT DAS PARA. At Baruipur mouza under Madarhat GP, Baruipur PS
2025_ZPHD_976894_2
SPG/N-114/25-26
Open Tender
CIVIL WORKS
60 days
Baruipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹39,608
Yes
31 Mar 2026
19 Dec 2025
19 Jan 2026
19 Dec 2025
16 Jan 2026
19 Dec 2025
Construction of Drain
Earth work in escavation of foundation trenches or drains in all sorts of soil et. all complete. (a) Non exceeding 1.50 mtr. Depth
Single Brick flat soling with picked jhama bricks etc. all complete
Cement concrete with graded jhama khoa (30mm size) etc. all complte. (a) 1:3:6 proportion
Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary),cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
Plaster with sand and cement morter including rounding off or chamfering corners etc. all complete (ii) 1:4 cement morter; 15 mm thick plaster
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
Add 18.00% GST
Add 1.00% Labour welfare cess
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.48 MB
BOQ_2380076.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid