| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 CrAccepted-AOC BAKRON KA WADA NEAR NEELAM CINEMA JODHPUR ROAD BALOTRA BARMER RAJASTHAN 344022 | BALOTRA | BARMER | RAJASTHAN | 344022 | ₹6.9 Cr | L1 | Accepted-AOC AOC being lowest |
| 2 | L2₹7.8 Cr+₹83.6 L (12.0%)Rejected-Finance | ₹7.8 Cr+₹83.6 L (12.0%) | L2 | Rejected-Finance Being not lowest |
| 3 | L3₹7.9 Cr+₹99.7 L (14.4%)Rejected-Finance | ₹7.9 Cr+₹99.7 L (14.4%) | L3 | Rejected-Finance Being not lowest |
| 4 | L4₹9.8 Cr+₹2.8 Cr (40.6%)Rejected-Finance | ₹9.8 Cr+₹2.8 Cr (40.6%) | L4 | Rejected-Finance Being not lowest |
| 5 | L5₹10.0 Cr+₹3.1 Cr (44.2%)Rejected-Finance STREET NO 11 SECTOR NO 04 TILAK NAGAR SAGAR ROAD BIKANER RAJASTHAN 334001 | BIKANER | RAJASTHAN | 334001 | ₹10.0 Cr+₹3.1 Cr (44.2%) | L5 | Rejected-Finance Being not lowest |
| Sl No | Description | Qty | Unit | Jeet Construction L3 | M/S Janak Raj Gumber L5 | KARNI BUILDERS L2 | Brahma Infra L1 | JAGDISH PRASAD & CO L4 |
|---|---|---|---|---|---|---|---|---|
| .01SCHEDULE 'A' PART IA (TO BE QUOTED BY THE CONTRACTOR) is not prepriced by MES and prepriced rates indicated as blank under col 5 signifies this fact only. Bidders shall insert their lumpsum amount of BOQ Ser item Nos. 1 & 2 in the Green coloured field under Col-6 only. Note: The quoted rates against the items under this schedule are deemed to include for the provisions contained in Scope of Work and Sch 'A' Notes. Ref Sch 'A' Notes complete before quoting these items. Structural designs and architectural/ structural drawings for structures and foundations for the buildings/ structures shall be prepared to comply with the provisions for design and analysis of RCC structures as per latest editions of relevant IS Codes. | ||||||||
| .02Schedule ‘A’ Part IA BUILDINGS/ STRUCTURES (TO BE QUOTED BY THE CONTRACTOR) | ||||||||
| 1.00 | Lumpsum price worked out for Design and Construction of One unit of Ground Run Point Pre Engineered Structure (PEB) including all services as listed in Schedule ‘A’ Part IA complete all as specified in scope of work, Sch 'A' Notes, drawings, specifications and other parts of tender documents as directed. | 1 | Lumpsum | 68,20,000 ₹68,20,000 Lowest | 1,30,00,000 ₹1,30,00,000 | 98,00,000 ₹98,00,000 | 90,00,000 ₹90,00,000 | 1,25,00,000 ₹1,25,00,000 |
| 2.00 | Lumpsum price worked out for Design and Construction of 01 Block of Six Sun Shelters of Pre Engineered Structure (PEB) including all services as listed in Schedule ‘A’ Part IA complete all as specified in scope of work, Sch 'A' Notes, drawings, specifications and other parts of tender documents as directed. | 1 | Lumpsum | 5,93,82,580 ₹5,93,82,580 | 7,25,00,000 ₹7,25,00,000 | 5,46,00,000 ₹5,46,00,000 | 4,80,00,000 ₹4,80,00,000 Lowest | 7,00,00,000 ₹7,00,00,000 |
| 2.01NOTE: Schedule ‘A’ Part IB to VIII under Ser No. 3.00 to 8.00 are prepriced by MES. Bidders shall insert their lumpsum amount in the Green coloured field under Col-6 only. | ||||||||
| 3.00 | Lump sum price worked out for EXCAVATION, EARTH WORK as listed in Sch 'A' Part II. | 1 | Lumpsum | 2,50,000 ₹2,50,000 Lowest | 3,25,000 ₹3,25,000 | 2,70,017.71 ₹2,70,017.71 | 3,17,667 ₹3,17,667 | 3,00,000 ₹3,00,000 |
| 4.00 | Lump sum price worked out for FLAME PROOF INTERNAL ELECTRIC SUPPLY as listed in Sch 'A' Part III. | 1 | Lumpsum | 7,45,411 ₹7,45,411 | 7,90,000 ₹7,90,000 | 7,33,742.96 ₹7,33,742.96 | 8,00,000 ₹8,00,000 | 6,00,000 ₹6,00,000 Lowest |
| 5.00 | Lump sum price worked out for LIGHTENING PROTECTION as listed in Sch 'A' Part IV. | 1 | Lumpsum | 7,70,000 ₹7,70,000 | 8,70,000 ₹8,70,000 | 8,03,806.21 ₹8,03,806.21 | 7,50,000 ₹7,50,000 | 6,50,000 ₹6,50,000 Lowest |
| 6.00 | Lump sum price worked out for TARMAC AND MISC WORKS as listed in Sch 'A' Part V. | 1 | Lumpsum | 44,284 ₹44,284 | 30,000 ₹30,000 | 26,618.83 ₹26,618.83 | 22,182 ₹22,182 Lowest | 25,000 ₹25,000 |
| 7.00 | Lump sum price worked out for EXTERNAL ELECTRIC SUPPLY as listed in Sch 'A' Part VII. | 1 | Lumpsum | 21,22,000 ₹21,22,000 | 20,65,000 ₹20,65,000 | 19,80,500.5 ₹19,80,500.5 | 20,00,000 ₹20,00,000 | 16,50,000 ₹16,50,000 Lowest |
Tender Value
₹9.3 Cr
EMD Value
₹7.9 L
Closing Date
31 Jan 2026, 6:00 pmClosed
CE (AF) GANDHINAGAR
CE (AF) GANDHINAGAR Lekawada Patia, Chiloda, Gandhinagar-382042
PROVN OF SUN SHELTERS AT AF STN JODHPUR
2025_MES_746246_1
80344
Open Tender
Civil Works
Lump-sum
365 days
GE (AF) JODHPUR
AS PER TENDER DOCUMENT AND NIT
7 documents required · 7 mandatory
₹3,000
GE (AF) Jodhpur
₹7.9 L
Yes
31 Mar 2026
26 Dec 2025
2 Feb 2026
26 Dec 2025
31 Jan 2026
24 Jan 2026
6 Jan 2026 - 13 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.01 | SCHEDULE 'A' PART IA (TO BE QUOTED BY THE CONTRACTOR) is not prepriced by MES and prepriced rates indicated as blank under col 5 signifies this fact only. Bidders shall insert their lumpsum amount of BOQ Ser item Nos. 1 & 2 in the Green coloured field under Col-6 only.
Note: The quoted rates against the items under this schedule are deemed to include for the provisions contained in Scope of Work and Sch 'A' Notes. Ref Sch 'A' Notes complete before quoting these items. Structural designs and architectural/ structural drawings for structures and foundations for the buildings/ structures shall be prepared to comply with the provisions for design and analysis of RCC structures as per latest editions of relevant IS Codes. | - | - | - | - |
| 0.02 | Schedule ‘A’ Part IA BUILDINGS/ STRUCTURES (TO BE QUOTED BY THE CONTRACTOR) | - | - | - | - |
| 1 | Lumpsum price worked out for Design and Construction of One unit of Ground Run Point Pre Engineered Structure (PEB) including all services as listed in Schedule ‘A’ Part IA complete all as specified in scope of work, Sch 'A' Notes, drawings, specifications and other parts of tender documents as directed. | 1 | Lumpsum | - | - |
| 2 | Lumpsum price worked out for Design and Construction of 01 Block of Six Sun Shelters of Pre Engineered Structure (PEB) including all services as listed in Schedule ‘A’ Part IA complete all as specified in scope of work, Sch 'A' Notes, drawings, specifications and other parts of tender documents as directed. | 1 | Lumpsum | - | - |
| 6 | Lump sum price worked out for LIGHTENING PROTECTION as listed in Sch 'A' Part IV. | 1 | Lumpsum | 6,43,044.97 | ₹6,43,044.97 |
| 7 | Lump sum price worked out for TARMAC AND MISC WORKS as listed in Sch 'A' Part V. | 1 | Lumpsum | 74,70,003.72 | ₹74,70,003.72 |
| 8 | Lump sum price worked out for AREA DRAINAGE as listed in Sch 'A' Part VI. | 1 | Lumpsum | 41,81,795.98 | ₹41,81,795.98 |
| 9 | Lump sum price worked out for EXTERNAL ELECTRIC SUPPLY as listed in Sch 'A' Part VII. | 1 | Lumpsum | 16,50,417.08 | ₹16,50,417.08 |
| 10 | S & F for Flame proof brass unions suitable for 20 mm ERW conduit, duly certified by CMRI Dhanbad complete all as specified and directed. | 650 | EACH | - | - |
| 11 | S & F for Flame proof brass bends suitable for 20 mm ERW conduit, duly certified by CMRI Dhanbad complete all as specified and directed. | 500 | EACH | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.18 MB
Uploaded80344.rar
Tender Documents • 9.13 MB
BOQ_835613.xls
BOQ • 2.89 MB
dwgtoupload.rar
Additional Documents • 0.66 MB
doc05025220260227213004.pdf
PDF • 0.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .