Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.5 LAccepted-Finance | 1 | Accepted-Finance 1 | |
| 2 | 2₹1.5 L+₹2,234.62 (1.46%)Rejected-Finance M S ASHAPURI INFRACON PVT LTD VILLAGE AND PO HURLA TEHSIL BHUNTER DISTT KULLU H P | 2 | Rejected-Finance 2 | |
| 3 | Not Admitted-Fee/PreQual/Technical VILLAGE TIPRI PO BHARAIN TEHSIL BHUNTAR DISTT KULLU HP | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
9 Sept 2026, 5:00 pmClosed
EE Manali Division HP PWD ManaliEE Manali Division
EE Manali Division HP PWD Manali
RRD on Naggar Sharan Rumsu Pulag road
2026_PWD_142299_1
latter no. 5357-64 dated 19.06.2026
Open Tender
Civil Works
Percentage
60 days
manali
RRD on Naggar Sharan Rumsu Pulag road
5 documents required · 5 mandatory
₹350
₹3,000
26 Sept 2026
31 Aug 2026
10 Sept 2026
31 Aug 2026
9 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto any lead ,dressing of sides and bottom and backfilling in trenches with excavated suitable material within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government including GST. | 45 | Per cubic metre | 369.76 | ₹16,639.2 |
| 2 | Stone soling properly hand packed filling interstices with Kharanja stone and consolidating with power road roller to the required gradient and camber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HP.PWD specification 100mm spread thickness(finished work including materials and labour ) with in all leads lifts and technical specifications as per the direction by the Engineer-in-Charge and other incidentals. The rates are inclusive of octroi, royality, Malkana, toll tax, sale tax or other taxes imposed by the Government, including GST. | 11.25 | Per cubic metre | 1,414.62 | ₹15,914.47 |
| 3 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803,1202 and 1203 PCC grade M-25 nominal mix 1:1.5:3 (one cement :1.5 Sand :3graded stone aggregate 20 mm nominal sizes) with in all leads lifts and technical specifications as per the direction by the Engineer-in-Charge and other incidentals. The rates are inclusive of octroi, royality, Malkana, toll tax, sale tax or other taxes imposed by the Government, including GST. | 15 | Per cubic metre | 7,761.38 | ₹1,16,420.7 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
BOQ_211396.xls
BOQ • 0.27 MB
Bid148974.pdf
Tender Documents • 2.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .