Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.7 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹13.3 L+₹63,544.24 (5.00%)Rejected-AOC | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Jayan V.P L1 | HARSHAD T M L2 |
|---|---|---|---|---|---|
| 1.00Rectification work of LBMC between ch.22/950 km to 40/900 km km | |||||
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 4.5 | cum | 1,554.43 ₹6,994.94 Lowest | 1,632.15 ₹7,344.68 |
| 1.00 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 4.5 | cum | 2,542 ₹11,439 Lowest | 2,669.1 ₹12,010.95 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 106.31 | cum | 257.63 ₹27,389.42 Lowest | 270.51 ₹28,758.73 |
| 1.00 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 2.81 | cum | 1,715.88 ₹4,826.77 Lowest | 1,801.67 ₹5,068.1 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 62.1 | cum | 7,932.89 ₹4,92,632.47 Lowest | 8,329.53 ₹5,17,263.81 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 24.84 | cum | 9,235.97 ₹2,29,421.49 Lowest | 9,697.76 ₹2,40,892.36 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 295.2 | sqm | 386.16 ₹1,13,994.43 Lowest | 405.46 ₹1,19,691.79 |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 32.77 | cum | 8,569.14 ₹2,80,853.56 Lowest | 8,997.59 ₹2,94,896.01 |
| 1.01 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 300.75 | sqm | 343.78 ₹1,03,391.84 Lowest | 360.97 ₹1,08,561.73 |
Tender Value
₹12.7 L
EMD Value
₹31,774
Closing Date
9 Mar 2026, 2:00 pmClosed
Roshni S S
CIP Subdivision Pazhayannur
GENERAL-Flood damages 2024-Urgent Rectification and Maintenance for damaged canal from ch 22/950 km to 40/900 km.- General Civil Work
2026_Irrig_842429_1
IRR/IA/TR/5882/2024_5_3_2/1
Open Tender
Civil Works - Canal
Item Rate
270 days
Cheerakuzhy
Please refer tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹31,774
Yes
16 May 2026
2 Mar 2026
10 Mar 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
2 Mar 2026 - 9 Mar 2026
Rectification work of LBMC between ch.22/950 km to 40/900 km km
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix)
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1421396.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
fot.pdf
Tender Documents • 0.25 MB
epay.pdf
Tender Documents • 0.23 MB
ipact.pdf
Tender Documents • 0.23 MB
affid.pdf
Tender Documents • 0.24 MB
sbd.pdf
Tender Documents • 3.52 MB
BOQ_1421396.xls
BOQ • 0.30 MB
preliminaryagreement.pdf
Tender Documents • 0.18 MB
Corrigendum.pdf
PDF • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .