GENERAL MANAGER ELECTRICAL
OMC House, Bhubaneswar-751001
Extension of power supply from Jagar Stackyard to Putulpani Rest Shelter of Gandhamardan Iron Ore Mines in the district of Keonjhar.
2026_OMC_128204_2
NIT NO. 01/OMC/ELECT/2026-27
Open Tender
Electrical Works
Percentage
90 days
Gandhamardan Iron Ore Mines
Electrical Contractor having valid License, GST, PAN, PF etc as per terms and conditions of contract.
2 documents required · 2 mandatory
₹7,080
₹15,000
18 Jul 2026
18 Apr 2026
29 Apr 2026
18 Apr 2026
28 Apr 2026
18 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Electrical Works | |||||
| 1.01 | Supply, Installation, Testing and Commissioning of 9 Mtr long 300 Kg PSC Pole including earth excavation work, concreting of pole (1.5 Mtr X 0.5 Mtr X 0.5 Mtr=0.375 Cum) with PCC (1:1.5:3) with couping of support (0.3Mtr X 0.5 Mtr X 0.5 Mtr=0.075Cum) with PCC (1:1.5:3) , all accessories, cost of labour, T&P etc complete the work as per Direction of Engineer-In-Charge . | - | Each | - | - |
| 1.02 | Supply and Laying of LT XLPE Insulated AB Cable of size 3x35+1x25+1x16 sq mm including all accessories, cost of labour, T&P etc complete the work as per Direction of Engineer-In-Charge . | - | Mtr | - | - |
| 1.03 | Supply, Installation, Testing and Commissioning of Suspension type Pole Clamp with Eye Hook including all accessories, cost of labour, T&P etc complete the work as per Direction of Engineer-In-Charge . | - | Each | - | - |
| 1.04 | Supply, Installation, Testing and Commissioning of Dead End Clamp including all accessories, cost of labour, T&P etc complete the work as per Direction of Engineer-In-Charge . | - | Each | - | - |
| 1.05 | Supply, installation and commissioning of LT Stay set(Complete), LT Stay Insulator, LT stay clamp(1.95Kg/Pair), 7/10 SWG Stay Wire 12Kg/Stay and concreting of stay (1.65 Mtrx0.3 Mtrx0.3 Mtr =0.1485 Cum - PCC 1:2:4)including all accessories, labour cost, T&P etc. complete work as per direction of EIC. | - | Set | - | - |
| 1.06 | Supply and Laying of 3.5C x 35 Sq mm 1.1 kV grade XLPE Insulated Aluminum Armoured cable drawn with 50 mm dia HDPE Pipe with earth excavation back filling with the excavated soil including all accessories, cost of labour, T&P etc complete the work as per Direction of Engineer-In-Charge . | - | Mtr | - | - |
| 1.07 | Supply, Installation, Testing and Commissioning of Suspension type Pole Clamp with Eye Hook including all accessories, cost of labour, T&P etc complete the work as per Direction of Engineer-In-Charge . | - | Each | - | - |
| 1.08 | Sundries for survey ,tree cutting, small size nut & bolt with washer , Aluminum Binding Tape, Danger Board, Dismantling of Existing HT Overhead Line etc including all accessories, cost of labour, T&P etc complete the work as per Direction of Engineer-In-Charge. | - | Each | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
SBD_2.pdf
Tender Documents • 3.55 MB
BOQ_588026.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].