| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.4 LAccepted-AOC | ₹35.4 L | L1 | Accepted-AOC Agreement executed |
| 2 | L2₹35.5 LRejected-Finance | ₹35.5 L | L2 | Rejected-Finance Second lowest bidder |
| Sl No | Description | Qty | Unit | TAJ K L1 | Mathew Thomas L2 |
|---|---|---|---|---|---|
| 1.00Apendix A: Reactave maintenance works | |||||
| 1.00 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 6.5 | cum | 2,400 ₹15,600 | 2,412.87 ₹15,683.66 |
| 1.00 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 6.5 | cum | 5,200 ₹33,800 | 5,244.23 ₹34,087.50 |
| 1.00 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 1,000 | sqm | 12 ₹12,000 | 11.66 ₹11,660 |
| 1.00 | OD159904/2025-2026:providing laying and rolling of close graded premix surfacing material of 20mm thickness composed of 11.2mm 0.9mm (type A) OR 13,2MM-0.9MM (Type B) aggregates using penetration grade bitumen to required line grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant ,laying and rollinh with a three wheel 8-10 KN roller and finishing torequired level and grades as per Technical specification clause 509 of MORD type A;BY MANUAL MEANS | 1,000 | per sqm | 270 ₹2.7 L | 270 ₹2.7 L |
| 1.00 | OD159903/2025-2026:PROviding and fixing of DLP board for Running contract work with non -retro reflectorised vinyl sign with 1 years warranty manufactured vinyl printed sheeting fixed over aluminium sheeting 2 mm thick/aluminium composit material sheeting 4 mm thick with area not exceeding 0.90 sqm,with suitable back supporting frame of MS angle 40*40*6 and supported on GI pipe
pole 50 mm NB conforming to IS 1239 firmly fixed to the ground by means of properly
designed foundation with M 15 grade cement concrete min size 45 cm*45 cm*60 cm,60 cm
below ground level including painting al exposed surafce with 2 coats of epoxy painting over
epoxy primer and as per approved drawing and clause 801 including lettering symbols etc | 1.44 | sqm | 5,400 ₹7,776 | 5,456.4 ₹7,857.22 |
| 1.01 | OD159902/2025-2026:Providing and fixing vinyl sticker in existing DLP board including lettering and printing | 5.76 | sqm | 1,000 ₹5,760 | 996.66 ₹5,740.76 |
| 2.00Apendix B -Pre Monsoon works | |||||
| 2.00 | 2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | 0.77 | Hectare | 55,500 ₹42,735 | 55,508.67 ₹42,741.68 |
| 2.00 | OD159893/2025-2026:Supply Granular material at site | 3.15 | cum | 1,600 ₹5,040 | 1,613.4 ₹5,082.21 |
Tender Value
₹37.6 L
EMD Value
₹50,000
Closing Date
19 Feb 2026, 2:00 pmClosed
EXECUTIVE ENGINEER
pwd roads division idukki painavu
GENERAL-RM / 2025-26-RC 2 Phase 2 / ZONE VI --For various PWD roads under Roads Section Thodupuzha in Idukki district- 4 road stretches for a length of 6.31 km
2026_PWD_832395_2
79/EE/2025-26
Open Tender
Civil Works - Roads
365 days
THODUPUZHA
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
13 May 2026
13 Feb 2026
21 Feb 2026
13 Feb 2026
19 Feb 2026
13 Feb 2026
Apendix A: Reactave maintenance works
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD159904/2025-2026:providing laying and rolling of close graded premix surfacing material of 20mm thickness composed of 11.2mm 0.9mm (type A) OR 13,2MM-0.9MM (Type B) aggregates using penetration grade bitumen to required line grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant ,laying and rollinh with a three wheel 8-10 KN roller and finishing torequired level and grades as per Technical specification clause 509 of MORD type A;BY MANUAL MEANS
OD159903/2025-2026:PROviding and fixing of DLP board for Running contract work with non -retro reflectorised vinyl sign with 1 years warranty manufactured vinyl printed sheeting fixed over aluminium sheeting 2 mm thick/aluminium composit material sheeting 4 mm thick with area not exceeding 0.90 sqm,with suitable back supporting frame of MS angle 40*40*6 and supported on GI pipe pole 50 mm NB conforming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm*45 cm*60 cm,60 cm below ground level including painting al exposed surafce with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc
OD159902/2025-2026:Providing and fixing vinyl sticker in existing DLP board including lettering and printing
Apendix B -Pre Monsoon works
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
OD159893/2025-2026:Supply Granular material at site
OD159889/2025-2026:Engaging coolie
OD159890/2025-2026:Engaging Small Tipper for removing slipped earth and other unusable materials from the PWD road for urgent opening of Traffic, including fuel charge and all other expenditures etc. complete
OD217327/2025-2026:Engaging JCB for removal of Slipped earth , other obstructions in the PWD road including fuel charges, Bata of driver and other all expenditure including etc. complete
OD194205/2025-2026:Filling up pot holes with bituminous ready mix compound ( 25kg bag ) and compacting by ramming to get a compact surface including cost of material, laying charges, transportation to site etc. complete. Rate is arrived for a bag of 25kg
Appendix C: Protective/Preventive maintenance works
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD159895/2025-2026:providing laying and rolling of close graded premix surfacing material of 20mm thickness composed of 11.2mm 0.9mm (type A) OR 13,2MM-0.9MM (Type B) aggregates using penetration grade bitumen to required line grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant ,laying and rollinh with a three wheel 8-10 KN roller and finishing torequired level and grades as per Technical specification clause 509 of MORD type A;BY MANUAL MEANS
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete For grading II- 13 mm (Nominal size) Material
3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means
4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method
55.22:Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete.
12.8.A:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M15 ( Without formwork)
Appendix D: Emergency works
OD159898/2025-2026:Engaging excavator (JCB) for various purposes
OD159900/2025-2026:Engaging small tipper for removing the excavated materials , debris for various premonsoon works
OD159897/2025-2026:Engaging mazdoor
OD159901/2025-2026:Conduction and reporting routine inspection for the entire length of the project road at a frequency of 7 days through out the agreement period of the running contract as directed by the deptl. officers at site. Additional RI may be required in response to reports, or complaints from police, other authorities and the public as result of major incidents, typhoon or flooding damages, etc, and are not measurable/payable. A proportion of RI should be carried out either during or immediately following a period of wet weather.
OD159899/2025-2026:Supply of granular material at site
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1407545.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.73 MB
BOQ_1407545.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid