Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.6 LAdmitted-Fee/PreQual/Technical/Finance KAREDATH H KIDANGOOR P O ANGAMALY PIN 683572 | ANGAMALY | ERNAKULAM | KERALA | 683572 | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹70.5 L+₹2.0 L (2.88%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹73.0 L+₹4.4 L (6.42%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹73.9 L+₹5.3 L (7.79%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | JOY KURIAN L1 | JOBY THOMAS L4 | IBRAHIMKUTTY T.K. L3 | ABDUL RASHEED M K L2 |
|---|---|---|---|---|---|---|---|
| 1.00Reactive Maintenance(Initial Rectification Work) | |||||||
| 1.00 | 2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | 1.97 | Hectare | 52,918.66 ₹1,04,143.92 Lowest | 57,039.14 ₹1,12,253.03 | 53,036.4 ₹1,04,375.64 | 54,448.27 ₹1,07,154.2 |
| 1.00 | 10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete <br> For grading II- 13 mm (Nominal size) Material | 450 | sqm | 554 ₹2,49,300 Lowest | 597.14 ₹2,68,713 | 555.2 ₹2,49,840 | 569.8 ₹2,56,410 |
| 1.00 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 55 | cum | 2,300.29 ₹1,26,515.95 Lowest | 2,479.4 ₹1,36,367 | 2,305.4 ₹1,26,797 | 2,366.15 ₹1,30,138.25 |
| 1.00 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 55 | cum | 5,711.8 ₹3,14,149 Lowest | 6,156.54 ₹3,38,609.7 | 5,724.5 ₹3,14,847.5 | 5,876.52 ₹3,23,208.6 |
| 1.00 | 55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | 7.7 | cum | 2,378.85 ₹18,317.15 Lowest | 2,564.08 ₹19,743.42 | 2,384.1 ₹18,357.57 | 2,447.55 ₹18,846.14 |
| 1.01 | 55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface. | 7.7 | cum | 12,822.56 ₹98,733.71 Lowest | 13,820.98 ₹1,06,421.55 | 12,851.1 ₹98,953.47 | 13,193 ₹1,01,586.1 |
| 1.01 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 8,648 | sqm | 16.94 ₹1,46,497.12 Lowest | 18.26 ₹1,57,912.48 | 18.84 ₹1,62,928.32 | 17.43 ₹1,50,734.64 |
| 1.01 | OD319803/2025-2026:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 KN static roller and finishing to required level and grades as per Technical Specification Clause 509 of MORTH Type A :- By Manual Means | 8,648 | sqm | 314.11 ₹27,16,423.28 Lowest | 338.57 ₹29,27,953.36 | 349.4 ₹30,21,611.2 | 323.2 ₹27,95,033.6 |
| 1.01 | 2.5.2.A:Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Bituminous course - By Mechanical Means | 36 | cum | 473.4 ₹17,042.4 Lowest | 510.27 ₹18,369.72 | 474.5 ₹17,082 | 487.1 ₹17,535.6 |
Tender Value
₹76.3 L
EMD Value
₹50,000
Closing Date
30 Sept 2026, 2:00 pmClosed
Executive Engineer, PWD Roads division
Office of the Executive Engineer, PWD Roads division, Kakkanad, Trikkakara. P.O
GENERAL-RM 2026-27 RC -2, One year RC Aluva Sn Zone III-Aluva-One year Running contract for various PWD Roads under road section Aluva in Ernakulam district 11 road stretches for a length of 33.215 km-General Civil Work
2026_PWD_872154_1
PWD/RB/TR/688/2026_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
365 days
Kakkanadu
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
3 Oct 2026
23 Sept 2026
3 Oct 2026
23 Sept 2026
30 Sept 2026
23 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Reactive Maintenance(Initial Rectification Work) | |||||
| 1.001 | 2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | 1.97 | Hectare | - | - |
| 1.002 | 10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete <br> For grading II- 13 mm (Nominal size) Material | 450 | sqm | - | - |
| 1.003 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 55 | cum | - | - |
| 1.004 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 55 | cum | - | - |
| 1.005 | 55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | 7.7 | cum | - | - |
| 1.006 | 55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface. | 7.7 | cum | - | - |
| 1.007 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 8,648 | sqm | - | - |
| 1.008 | OD319803/2025-2026:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 KN static roller and finishing to required level and grades as per Technical Specification Clause 509 of MORTH Type A :- By Manual Means | 8,648 | sqm | - | - |
| 1.009 | 2.5.2.A:Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Bituminous course - By Mechanical Means | 36 | cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
sbd.pdf
Tender Documents • 1.64 MB
performance.pdf
Other Document • 0.34 MB
BOQ_1478856.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .