Tender Value
₹78.3 L
EMD Value
₹79,000
Closing Date
11 Sept 2020, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
Renovation of Ponds and Ooranies under State Finance Commission Grant in Pullambadi Block in Tiruchirappalli District for the year 2019-20 Phase II Package No.30
2020_RDTN_174778_30
A10/2340/2019 Dated 30.07.2020
Open Tender
Civil Works - Lift Irrigation Schemes
Item Rate
180 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹79,000
DRDA Tiruchirappalli
23 Sept 2020
7 Aug 2020
11 Sept 2020
7 Aug 2020
11 Sept 2020
7 Aug 2020
10 Aug 2020
Amount
Improvement to Maili KULAM in AlambakKam at AlambakKam panchayat at Pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision of cement pipe 90mm dia
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete
Provision for Name Board charges
Improvement to Marakulam in AlambakKam at AlambakKam panchayat at Pullambadi BlockClearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Provision of cement pipe 90mm dia
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(REVETMENT)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision for Name Board charges
Improvement to Thamarai Kulam in E.Vellanur panchayat Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(Retaining Wall)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(bating ghat)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Supplying and fabrication of steel iincluding cost and conveyance of all materials to site and all labour charges etc complete
CC 1:2:4 mix using 20 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Provision for Name Board charges
Improvement to Siran kulam in Garudamangalam at Garudamangalam panchayat at Pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal ( including cost and aonveyance of all materials to site and all labour charges etc complete
Provision of cement pipe 90mm dia
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(bating ghat)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Supplying and fabrication of steel iincluding cost and conveyance of all materials to site and all labour charges etc complete
CC 1:2:4 mix using 20 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Provision for Name Board charges
Improvement to Pillayar kulam in Garudamangalam at Garudamangalam panchayat at Pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision of cement pipe 90mm dia
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(bating ghat)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Supplying and fabrication of steel iincluding cost and conveyance of all materials to site and all labour charges etc complete
CC 1:2:4 mix using 20 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Provision for Name Board charges
Improvement to Muththayan kulam in Garudamangalam at Garudamangalam panchayat at Pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision of cement pipe 90mm dia
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(bating ghat)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Supplying and fabrication of steel iincluding cost and conveyance of all materials to site and all labour charges etc complete
CC 1:2:4 mix using 20 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(REVETMENT)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision for Name Board charges
Improvement to Chinna Eri in Garudamangalam at Garudamangalam panchayat at Pullambadi BlockClearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision of cement pipe 90mm dia
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(bating ghat)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Supplying and fabrication of steel iincluding cost and conveyance of all materials to site and all labour charges etc complete
CC 1:2:4 mix using 20 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(REVETMENT)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision for Name Board charges
Improvement to Kanja Kuttai in Garudamangalam at Garudamangalam panchayat at Pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision of cement pipe 90mm dia
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(bating ghat)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Supplying and fabrication of steel iincluding cost and conveyance of all materials to site and all labour charges etc complete
CC 1:2:4 mix using 20 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(REVETMENT)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision for Name Board charges
Improvement to Rengammal kulam in Garudamangalam at Garudamangalam panchayat at Pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision of cement pipe 90mm dia
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(bating ghat)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Supplying and fabrication of steel iincluding cost and conveyance of all materials to site and all labour charges etc complete
CC 1:2:4 mix using 20 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(REVETMENT)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision for Name Board charges
Improvement to Thopudiyan Eri in Garudamangalam at Garudamangalam panchayat at pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision of cement pipe 90mm dia
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete
Provision for Name Board charges
Improvement to Arunachallam kulam in Garudamangalam at Garudamangalam panchayat at pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision of cement pipe 90mm dia
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete
Provision for Name Board charges
Improvement to Sompan kuttai in Garudamangalam at Garudamangalam panchayat at pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision of cement pipe 90mm dia
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete
Provision for Name Board charges
Improvement to Nalla Thanner kulam in Garudamangalam at Garudamangalam panchayat at pullambadi BlockClearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Provision of cement pipe 90mm dia
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(bating ghat)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Supplying and fabrication of steel iincluding cost and conveyance of all materials to site and all labour charges etc complete
CC 1:2:4 mix using 20 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Provision for Name Board charges
Improvement to Vannan Eri in Kovandakurichi at Kovandakurichi panachayat at Pullambadi Block Clearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision of cement pipe 90mm dia
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete
Provision for Name Board charges
Improvement to Vadugarpettai Eri Kovandanguruchi at Kovandangurichi panchayat at pullambadi BlockClearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(INLET)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Provision of cement pipe 90mm dia
Rough stone dry packing for aprons and revetments including cost and conveyance of all materials to site and all labour cahrges etc complete
Provision for Name Board charges
Improvement to karunkulam in kovandakurichi at kovandakurichi panachayat at pullambadi BlockClearing the Scrub Jungle (without uprooting)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation of bunds, breaking clods, sectioning, (including Watering & Consolidation). Sectioning during forming bunds when earth moving machinery, lorries and rollers are used for consolidation etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation and deposit on bank with initial lead and lift in all classes of soil as per 20 B etc coomplete(Bating ghat)
Filling with river sand including cost and conveyance of all materials to site and all labour charges etc complete
CC 1:4:8 mix using 40 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Centring and shuttering charges for RCC work inculding cost and conveyannce of all materials to site and all labour charges etc complete
CC 1:3:6 mix using 40 mm ISS HBG metal (40mm HBG metal 60% and 20mm HBG Metal 20%) including cost and aonveyance of all materials to site and all labour charges etc complete
Supplying and fabrication of steel iincluding cost and conveyance of all materials to site and all labour charges etc complete
CC 1:2:4 mix using 20 mm ISS HBG metal including cost and aonveyance of all materials to site and all labour charges etc complete
Provision for Name Board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
P. Jaisankar
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .