Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | -46.70% | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹15.9 L (12.6%)Admitted-Finance | -40.00% | ₹1.4 Cr+₹15.9 L (12.6%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 Cr+₹23.1 L (18.2%)Admitted-Finance | -37.00% | ₹1.5 Cr+₹23.1 L (18.2%) | L3 | Admitted-Finance |
| 4 | L4₹1.6 Cr+₹32.4 L (25.5%)Admitted-Finance | -33.10% | ₹1.6 Cr+₹32.4 L (25.5%) | L4 | Admitted-Finance |
| 5 | L5₹1.7 Cr+₹40.2 L (31.7%)Admitted-Finance | -29.80% | ₹1.7 Cr+₹40.2 L (31.7%) | L5 | Admitted-Finance |
Tender Value
₹2.4 Cr
EMD Value
₹4.8 L
Closing Date
27 Apr 2026, 4:00 pmClosed
Xen RnB Division Kargil
Xen RnB Division Kargil
Upgradation of Link Road Sangnak Chisling Monastery at Youkmal Bodhkharbu. (Under SDP)
2026_PWD_18751_1
E tender 01 of 2026-27 PW RnB Division 2nd Kargil
Open Tender
Civil Works - Roads
Percentage
270 days
Kargil
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,370
Xen RnB Division Kargil
₹4.8 L
15 May 2026
11 Apr 2026
28 Apr 2026
11 Apr 2026
27 Apr 2026
11 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | |||||
| 1.01 | All kind of Soil 50% | - | Cum | - | - |
| 1.02 | Soft Rock 30% | - | Cum | - | - |
| 1.03 | Hard Rock 20% | - | Cum | - | - |
| 2Disposal of excavated earth by an average of 5 km by Mt | |||||
| 3Earth work in excavation by mechanical means in trenches for foundation ,drains, pipes, cables etc. (not exceeding 1,5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5mtr including disposal of excavated earth upto 1Mtr from cutting edge, disposed earth to be leveled and neatly dressed. | |||||
| 3.01 | All kind of Soil 60% | - | Cum | - | - |
| 3.02 | Soft Rock 40% | - | cum | - | - |
| 4Dumping stone/earth filling in horizontal on level and backfilling behind R.wall including cost of stone. | |||||
| 4.01 | Stone filling 60% | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.56 MB
BOQ_44845.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .