| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹39.1 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹39.2 L+₹9,263.22 (0.24%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹45.7 L+₹6.7 L (17.0%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹47.5 L+₹8.4 L (21.5%)Admitted-Finance VPO NEAR ARYA SAMAJ KHERA RASOOLPUR KOTA | L4 | Admitted-Finance | ||
| 5 | L5₹50.4 L+₹11.3 L (28.9%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹57.9 L
EMD Value
₹1.2 L
Closing Date
19 Feb 2026, 6:00 pmClosed
EE WR DIV. KOTA
EE WR DIV. KOTA
Repair and Renovation of Anicut in Sarola Village Tehsil Digod District Kota
2026_WRDAS_536984_2
EE WR DIV. KOTA NITNO-18/2025-26
Open Tender
Civil Works
Percentage
365 days
KOTA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
1000 EE WR DIV. KOTA
₹1.2 L
Yes
23 Feb 2026
10 Feb 2026
20 Feb 2026
10 Feb 2026
19 Feb 2026
10 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Side shuttering including propping etc. complete (to achieve finish F 2 for Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc. | 1,033.98 | sqm | 220 | ₹2,27,475.6 |
| 2 | Supplying of M.S. reinforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using.
Tor or ribbed bars (IS :1786) | 5,168.05 | KG | 89 | ₹4,59,956.45 |
| 3 | Supply of Tor steel anchor bars of required diameter, length and shape at site of work complete. | 233.42 | KG | 72 | ₹16,806.24 |
| 4 | Preparation of foundation of structure including removal of all loose stones, silt and final washing By manual labour | 420.4 | SQM | 23 | ₹9,669.2 |
| 5 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Thick | 4,725 | sqm | 2.5 | ₹11,812.5 |
| 6 | Interlocking Paver Blocks having 80 mm thickness in M-40 grade concretee Providing and Laying 80 mm thick cement concretee blocks of M-40 Grade (Manufactured with fully mechanised dry cast process with forced action mixer whose arms revolve along the main axis and rotate about its own axis also, having humidity sensor for moisture control of w/c ratio in concretee mix. Manufactured with steel moulds(Milled and manufactured in CSI diamond or CSI Nitro process for accuracy) on steel base plate of min 16 mm thick; Having Vibration and pressing action both together with the help ofmultiple synchronised vibrators. Power of hydraulic station should be minimum 50KW for compaction and cured in controlled chambers having humidity control and automated air circulation system) spreading 25mm thick sand underneath and filling joints with sand on existing W.B.M.base, as per IS15658:2006 and all materials shall conform to MoRTH Specification Clause 602. | 102 | Sqm. | 1,210 | ₹1,23,420 |
| 7 | 40 mm thick rubbed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement :5 coarse sand) with joints 3mm thick, side buttered with cement mortar 1:2 (1 cement : 2 stone dust) admixed with pigment to match the shade of stone and pointing with same mortar Red sand stone | 79.2 | sqm | 1,159 | ₹91,792.8 |
| 8 | Providing laying, spreading and compacting stone aggregates of specific size as per table 400-7 to Water Bound Macadam specification including spreading in uniform thickness, hand packing, rolling with power roller 8-10 tonnes, in stages to proper grade and camber, applying and brooming requisite type of screening (Table 400-8) / binding Materials to fill up the interstices of coarse aggregates, watering (with water browser) and rolling, making necessary earthen bund to protect edges, lighting, guarding, barricading and maintenance of Driversion etc. [MoRTH specifications : Clause 404]. By Manual Means Grading No.2 (63-45mm) Hand Broken | 20.76 | Cum | 1,361 | ₹28,254.36 |
| 9 | Excavation including loading, unloading, disposal and dressing of
excavated earth within initial lead of 50m and lift up to 1.5m including
dressing of excavated area and dewatering wherever required complete in all respect
(c) Hard soil mixed with Kankar / boulders, Morrum | 683.88 | Cum | 118 | ₹80,697.84 |
| 10 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller /pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctors density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. (b) With lead beyond 250 m and up to 750 m (1/2 Km) Deduct in as per item no 09 above if Standard Proctors density to be achieved is at least 95% | 198 | Cum | 127.5 | ₹25,245 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.77 MB
BOQ_956943.xls
BOQ • 0.26 MB
02-financial-Bid-Sarola.pdf
Tender Documents • 2.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .