Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC 110 5 BONOMALI NASKAR ROAD BEHALA PARNASHREE PARNASHREE KOLKATA WEST BENGAL 700060 | KOLKATA | WEST BENGAL | 700060 | ₹2.3 L | L1 | Accepted-AOC 1ST LOWEST l1 |
| 2 | L2₹2.4 L+₹4,612.87 (2.00%)Rejected-AOC | ₹2.4 L+₹4,612.87 (2.00%) | L2 | Rejected-AOC HIGHER THAN L1 |
| 3 | L3₹2.4 L+₹8,072.53 (3.50%)Rejected-Finance NA | NA | NA | 121004 | ₹2.4 L+₹8,072.53 (3.50%) | L3 | Rejected-Finance higher than l2 |
Tender Value
₹2.3 L
EMD Value
₹4,800
Closing Date
16 Feb 2026, 5:00 pmClosed
DY.CE(M)/(S_D)
5.s.n.banerjee road.kol-700013
Clog cleaning operation of DWF and SWF pumps and removal of floating materials from sump chamber for five months at Kabitirtha DPS under GRBU
2026_KMC_998736_1
KMC/GRBU/K/24/25-26
Open Tender
Support/Maintenance Service
Percentage
153 days
GRBU
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹4,800
1 Aug 2026
7 Feb 2026
19 Feb 2026
7 Feb 2026
16 Feb 2026
7 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 2)Mason (Ordinary). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | - | EACH | 325.6 | - |
| 2 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 18)Fitter Mechanic (Helper). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | - | EACH | 297 | - |
| 3 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 17)Fitter Mechanic. Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | - | EACH | 358.6 | - |
| 39 | Sub Total | - | - | - | - |
| 41 | CESS 1% | - | Nos. | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
td2.pdf
Tender Documents • 0.88 MB
BOQ_2445779.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .