Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Rank 1₹13.9 LAccepted-AOC | ₹13.9 L | Rank 1 | Accepted-AOC Rank 1 |
| 2 | Rank 2₹15.1 LRejected-AOC | ₹15.1 L | Rank 2 | Rejected-AOC Rank 2 |
| Sl No | Description | Qty | Unit | K HARINARAYANAN L2 | REMYA C C L1 |
|---|---|---|---|---|---|
| 1.00Pond Renovation | |||||
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 201 | hour | 307.53 ₹61,813.53 | 284.37 ₹57,158.37 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 19.4 | cum | 320.15 ₹6,210.27 | 296.04 ₹5,742.58 |
| 1.00 | OD387224/2025-2026:Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 19.4 | cum | 3,554.17 ₹68,943.79 | 3,286.61 ₹63,753.66 |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 43.01 | cum | 7,425.7 ₹3,19,386.78 | 6,866.69 ₹2,95,343.2 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.74 | cum | 9,335 ₹25,540.56 | 8,632.25 ₹23,617.84 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 8.92 | sqm | 343.68 ₹3,065.63 | 317.8 ₹2,834.78 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 95.4 | kilogram | 100.06 ₹9,545.72 | 92.52 ₹8,826.41 |
| 1.01 | 50.2.26.1:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge. | 38.94 | cum | 396.68 ₹15,445.93 | 366.81 ₹14,282.85 |
| 1.01 | 51.2.3:Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 12.52 | cum | 809.51 ₹10,131.83 | 748.57 ₹9,369.1 |
Tender Value
Refer Docs
EMD Value
₹42,365
Closing Date
13 Nov 2025, 2:00 pmClosed
AE
LAKKIDI PERUR GRAMA PANCHAYATH
Annual Plan-LPGP 2025-26 Kurudankulam Renovation (Own Fund - Rs 20,00,000/-)-Pro.No.173/25-26
2025_LSGD_819501_30
01/2025-26/AE/LID EW/LPGP/PHASE3
Open Tender
Civil Works - Roads
180 days
LAKKIDI PERUR GRAMA PANCHAYATH
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹42,365
Yes
1 Mar 2026
6 Nov 2025
15 Nov 2025
6 Nov 2025
13 Nov 2025
6 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.50 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
173.pdf
Other Document • 1.97 MB
BOQ_1373892.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid