| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.8 LAccepted-Finance | ₹3.8 L | 1 | Accepted-Finance 1 |
| 2 | 2₹3.9 L+₹12,639.68 (3.33%)Rejected-Finance | ₹3.9 L+₹12,639.68 (3.33%) | 2 | Rejected-Finance 2 |
| 3 | 3₹4.4 L+₹62,987.74 (16.6%)Rejected-Finance M S ASHAPURI INFRACON PVT LTD VILLAGE AND PO HURLA TEHSIL BHUNTER DISTT KULLU H P | ₹4.4 L+₹62,987.74 (16.6%) | 3 | Rejected-Finance 3 |
| 4 | 4₹4.4 L+₹63,156.27 (16.7%)Rejected-Finance M S ASHAPURI INFRACON PVT LTD VILLAGE AND PO HURLA TEHSIL BHUNTER DISTT KULLU H P | ₹4.4 L+₹63,156.27 (16.7%) | 4 | Rejected-Finance 4 |
Tender Value
₹4.2 L
EMD Value
₹8,500
Closing Date
21 Aug 2026, 5:00 pmClosed
EE HP PWD Division Manali at Katrain
EE HP PWD Division Manali at Katrain
RRD on Naggar to Jok Mashara road
2026_PWD_140923_1
4790-97 dated 06/08/2026
Open Tender
Civil Works
Percentage
60 days
Manali
RRD on Naggar to Jok Mashara road
5 documents required · 5 mandatory
₹350
₹8,500
18 Sept 2026
12 Aug 2026
22 Aug 2026
12 Aug 2026
21 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in soil in hilly area by manual means including cutting and trimming of side slopes and disposing of excavated earth with all leads & lift ,as per drawing and technical specification clause 1603.1 within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but including GST. | 35.8 | Per cubic metre | 264.81 | ₹9,480.2 |
| 2 | Earth work in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto any lead ,dressing of sides and bottom and backfilling in trenches with excavated suitable material .within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government including GST. | 17.4 | Per cubic metre | 369.76 | ₹6,433.82 |
| 3 | Stone masonry work in cement mortar for sub structure complete as per drawing and technical specifications clause 702,704,1202 and 1204 Random rubble masonry in cement mortar 1:6 (One cement : Six sand ).within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Governmentincluding GST. | 73.62 | Per cubic metre | 5,414.52 | ₹3,98,616.96 |
| 4 | Providing weap holes in brick masonry/ stone masonry/plain reinforced concrete abutment, wing wall, return wall with 100mm dia PVC pipe extending through the full with of the structures with slope of 1(v):20 (H) towards drawing face complete as per drawing and technical specification clauses 614,709,1204.3.7. within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government including GST. | 16 | Each | 424.48 | ₹6,791.68 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_209125.xls
BOQ • 0.28 MB
bidjokmashara421323.pdf
Tender Documents • 2.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .